Third Notice | | 4/30/2010 | 5/11/2010 | | DONE |
|
|
|
faxed and called
|
Third Notice | | 3/26/2010 | 4/15/2010 | | DONE |
|
|
|
faxed and called
|
Telephone call | | | 4/15/2010 | | DONE |
Tisha Gallop
|
|
|
called and spoke with Cathy/Beniton Const. she said almost done with all change orders, will check w/project manager on status.
|
Third Notice | | 1/25/2010 | 1/26/2010 | | DONE |
|
|
|
faxed
|
Telephone call | | | 1/26/2010 | | DONE |
Tisha Gallop
|
|
|
spoke with Cathy/Beniton Const. won't have all values in unil 2 more months. Told her ok will set notice out until then.(also set Bld08-01285 g/d permit to print out third notice to match this one.)
|
Second Notice | | 1/8/2010 | 1/20/2010 | | DONE |
|
|
|
|
First Notice | | 12/14/2009 | 12/29/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/4/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-####
|
BLD - Request for Extension | 11/23/2009 | 11/23/2009 | 11/23/2009 | | PASS |
Bob Archibald
|
|
|
30 day extension on temp. occ. approved. Letter on file.
|
Meeting | | | 11/18/2009 | | DONE |
Tisha Gallop
|
|
|
contractor in office inquired about temp occupancy extension. Told him needs to write letter or e-mail to Jenifer Gililand.
|
PubWorks Occupancy Approval | 11/17/2009 | 11/17/2009 | 11/17/2009 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | PASS |
Forrest France
|
|
|
C/N items verified for completion, fire life safety approved for final status.
|
BLD-Framing/Rough-in | 10/23/2009 | 10/23/2009 | 10/23/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Tom Arcoraci
|
|
|
bryan Phone #: ###-####
|
BLD-Wall cover | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
Telephone call | | | 9/24/2009 | | DONE |
Tisha Gallop
|
|
|
phone call from Bud Fulleton with CDHD, ok for perm occupancy.
|
FIRE-Conference | 9/14/2009 | 9/14/2009 | 9/14/2009 | A | DONE |
Forrest France
|
|
|
Regarding items remaining for final and prior C/N list request.
|
Temporary Occupancy UNPAID FEE | | | 8/25/2009 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/21/2009 | 8/24/2009 | 8/24/2009 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/21/2009 at 4:11:44 PM. Contact: ###-####. will need final letter of ok from structural engineer,,, dentist office not finished and can not be occupied,, need trades finaled all the way
|
FIRE-Final Inspection | 8/21/2009 | 8/24/2009 | 8/24/2009 | A | PART |
Forrest France
|
|
|
Items on C/N verified for compliance, fire life safety is satisfactory pending completion of the loop road at the north end of the building and completion of finishes at the dental office.
|
FIRE-Final Inspection | 8/20/2009 | 8/21/2009 | 8/21/2009 | P | FAIL |
Forrest France
|
|
|
See stamped plan set for locations of repair items including four non-functional exit signs, one EM light, provide one missing exit sign, remove one exit sign, provide two additional EM lights, loop road at the north end of the building is not finished, remainder of life safety okayed.
|
Zoning Approval | 8/18/2009 | 8/18/2009 | 8/18/2009 | | PASS |
David Moser
|
|
|
The landscaping around school will be complete at the end of August and the old school site will be done around Oct. Landscaping is about 50% done (8-18-09). As per Hal Simmons, they do not need to bond for work and sign off project.
|
BLD-Wall cover | 8/7/2009 | 8/10/2009 | 8/10/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/7/2009 at 2:26:30 PM. Contact: ###-####. ceilling in kitchen ok to cover.
|
BLD-Wall cover | 7/29/2009 | 7/29/2009 | 7/29/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/29/2009 at 10:06:15 AM. Contact: ###-####.
|
BLD-Wall cover | 7/8/2009 | 7/10/2009 | 7/10/2009 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/8/2009 at 11:28:16 AM. Contact: ###-####.
|
BLD-Conference | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/12/2009 at 8:13:54 AM. Contact: ###-####.
|
BLD-Conference | 6/12/2009 | 6/12/2009 | 6/12/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 6/4/2009 | 6/5/2009 | 6/5/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/4/2009 at 3:25:04 PM. Contact: ###-####.
|
BLD-Wall cover | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/20/2009 at 9:06:58 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/30/2009 | 5/1/2009 | 5/1/2009 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/30/2009 at 11:05:00 AM. Contact: ###-####. wip ok
|
BLD-Wall cover | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/22/2009 at 9:03:34 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 4/8/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/8/2009 at 10:30:34 AM. Contact: ###-####. wip ok
|
BLD-Energy code compliance | 3/20/2009 | 3/20/2009 | 3/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/20/2009 at 8:02:47 AM. Contact: ###-####.
|
BLD-Wall cover | 3/12/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 3/10/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2009 at 3:09:06 PM. Contact: ###-####.
|
BLD-Wall cover | 3/11/2009 | 3/12/2009 | 3/12/2009 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/10/2009 at 3:08:19 PM. Contact: ###-####.
|
BLD-Energy code compliance | 2/28/2009 | 3/2/2009 | 3/2/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/28/2009 at 11:24:13 AM. Contact: ###-####.
|
BLD-Wall cover | 2/26/2009 | 2/27/2009 | 2/27/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/26/2009 at 4:40:49 PM. Contact: ###-####.
|
BLD-Other | 2/27/2009 | 2/27/2009 | 2/27/2009 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/25/2009 at 8:10:55 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/18/2009 | 2/18/2009 | 2/18/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 9:56:19 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/15/2009 at 9:29:59 AM. Contact: ###-####. partial roof nailing ok
|
BLD-Aging Inspection | 1/13/2009 | 1/13/2009 | 1/13/2009 | | PASS |
Tom Arcoraci
|
|
|
wip ok spec insp
|
BLD-Foundation | 11/5/2008 | 11/5/2008 | 11/6/2008 | P | PASS |
Mike Jordan
|
|
|
Interior footings at area D.
|
BLD-Energy code compliance | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PASS |
Mike Jordan
|
|
|
Rigid insulation at interior side of stemwall at area D.
|
BLD-Foundation | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 11:40:19 AM. Contact: ###-####.
|
BLD-Foundation | 10/29/2008 | 10/30/2008 | 10/30/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Interior footings for bearing walls at area A. Will have special insp.
|
BLD-Energy code compliance | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 1:17:02 PM. Contact: ###-####. Rigid foam insul on interior side of stemwall at area A.
|
BLD-Footing | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/23/2008 at 3:34:29 PM. Contact: ###-####. Interior footings and column pad and grade beam footings for canopy at east side of area D.
|
BLD-Concrete | 10/8/2008 | 10/9/2008 | 10/9/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/8/2008 at 2:03:07 PM. Column pad footings for courtyard canopy and enterance to community center. Stemwalls for area A. Also reviewed RFI from engineer regarding lapsplices for vertical reinforcement from stemwall to masonry wall . 36 inches is required, only 32 inches on in place work. Will have detail electronically scanned into bldg. permit.
|
BLD-Foundation | 10/2/2008 | 10/3/2008 | 10/3/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 1:33:42 PM. Contact: ###-####. si need lap ?
|
BLD-Foundation | 9/23/2008 | 9/24/2008 | 9/24/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 12:42:46 PM. Contact: ###-####. Stemwalls for gym, cafetria, and denta office. Will have special insp.
|
BLD-Concrete | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | PASS |
Jim Storey
|
|
|
Ryan ###-#### 2000 ft ft bar ok/ need rfi from engineer for pipes under ft. si ok
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2008 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 9/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/15/2008 | | DONE |
|
|
|
t/c w amber at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/15/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/15/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JCM) | 5/22/2008 | | 9/15/2008 | | PASS |
John Menard
|
|
|
9/15/2008 09:04:31 JCM - activity updated through activity BLDA022 from case BLD08-01105.
|
Routing - PLAN CHECK | 8/13/2008 | | 9/15/2008 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 9/5/2008 | | 9/11/2008 | | PASS |
John Menard
|
|
|
Called Action Couriers for pick up (re-submittal) - Received letter from consulting structural engineer approving revisions. JCM
|
Plan resubmittals received | | | 9/4/2008 | | |
John Menard
|
|
|
Received 3 copies of Engineer Calcs, 3 copies of sheets A2.2, A2.3, A2.4, A2.5, A6.5, A8.8, A8.14 and inserted into plans then returned to John Menards desk///9-4-08 BAS
|
Routing Off Site - STRUCTURAL | 8/28/2008 | | 9/4/2008 | | FAIL |
John Menard
|
|
|
Plans hand carried back to office by consulting engineer. JCM Received comment list from consulting engineer requesting additional revisions. JCM
|
Plan resubmittals received | | | 9/2/2008 | | |
John Menard
|
|
|
Received transmittal, letter from the Architect, two copies of sheet A-8.7; inserted by arch. rep. and taken back to John Menard
|
Plan resubmittals received | | | 9/2/2008 | | DONE |
John Menard
|
|
|
Received alternate request letter for 12 inch noncombustible overhang at the gymnasium fire walls. JCM
|
Plan Reviewer's activity | | | 9/2/2008 | | PASS |
John Menard
|
|
|
Building Official, George Slane, reviewed and approved alternate request letter for overhangs at gymnasium fire walls. JCM
|
Plan resubmittals received | | | 8/28/2008 | | |
John Menard
|
|
|
Received 1 cover transmittal, 3 copies of sheets A-6.1, A-6.6, A-7.1, A-7.9, A-8.4, A-8.5, A-8.8, A-8.9, A8-12, 3 copies of structural calcs and inserted by LKV architects///8/28/08 BAS
|
Plan resubmittals requested | | | 8/28/2008 | | DONE |
|
|
|
E-mailed the architect requested revised details and alternate request letter for signature by the Building Official. JCM
|
Plan resubmittals received | | | 8/25/2008 | | |
|
|
|
received transmittal letter from lkv arch & (3) pages of comments & letter (2) pages from lkv arch regarding alternative design approach-- also (8) small sheets of drawings-- also (2) sheets each of A-1.1, A-3.2, A-3.8, A-4.2, A-5.1, A-6.1, A-6.2, A-6.5, A-7.8, A-7.9, A-7.19, A-7.21, A-7.24, A-8.7, A-12.1, E-2.2L-- the inserter is Pamela J
ohnson- plans taken back to John Menard
|
Plan resubmittals requested | | | 8/21/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the second structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 8/11/2008 | | 8/21/2008 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up - Received comment list from the consulting engineer requesting revisions on the second review. JCM
|
Routing - PUBLIC WORKS | 8/13/2008 | | 8/13/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan resubmittals requested | | | 8/13/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a request for additional revisions. JCM
|
Routing - PLAN CHECK | 6/30/2008 | | 8/13/2008 | | FAIL |
John Menard
|
|
|
|
Routing PW Street Lights | 6/2/2008 | | 8/13/2008 | | PASS |
Hank Alarcon
|
|
|
|
Plan resubmittals received | | | 7/31/2008 | | |
John Menard
|
|
|
Received two transmittal, structural response letter, response letter from Musgrove Eng., response letter from EA Eng., copy of Boise City Plan Review Report, three copies of Sturctural Engineering response and Calculations book, two copies of sheets A-1.1, A-3.2, A-3.4, A-3.6, A-4.2, A-4.3, A-6.2, A-6.4, A-7.19, A-7.21, A-7.24, A-8.7, A-10.1, A-11.1, A-12.1, M-1.1, M-1.2, M-1.3, M-2.1, M-2.3, P-1.1, P-1.2, P-1.3, P-1.4, E-2.1L, E-2.1L, E-2.3L, E-2.4L, and three copies of sheets A-2.6, A-6.1, A-6.2, A-6.3, A-6.4, A-7.1, A-7.6, A-7.16, A-7.18, A-7.19, A-7.22, A-8.4, A-8.6, A-8.8, A-8.9; inserted by Arch. rep. and taken back to John Menard
|
Routing - FIRE | 6/26/2008 | 6/26/2008 | 6/30/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/30/2008 | | FAIL |
|
|
|
Failed PW,Structural, Plumbing, Plan Check
|
Route to Impact Fee Review | 6/26/2008 | 7/1/2008 | 6/27/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 6/26/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 6/9/2008 | | 6/26/2008 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing - PLUMBING | 6/20/2008 | | 6/20/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Drainage | 6/16/2008 | | 6/16/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals requested | | | 6/13/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/29/2008 | | 6/13/2008 | | FAIL |
John Menard
|
|
|
Called Action Courier for pick up 5-29-08 @ 9:16am BAS - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Received Certificate of Value | | | 6/11/2008 | | DONE |
Tisha Gallop
|
|
|
Revised cert of value submitted to split out grading permit into Bld08-01285; New project value is $7,651,705, ele $1,117,751, plm $614,003, mech $494,164, fire sprinkler $267,084, no value given for fire alarm//6/10/08 LEG
|
Plan resubmittals received | | | 6/10/2008 | | |
Tisha Gallop
|
|
|
Received revsed cert of value and two copies of C1.00, C1.01, C1.02, C1.03, C1.04, C1.05, ESC-1, ESC-2a, ESC-2b, ESC-3, C2.00, C3.00, C3.01, C3.02, C3.10, C3.02, C3.10, C4.00, C4.01, C4.03, C4.04, C5.00, C6.00, C6.01, L1.00, L1.01, L1.10, L1.50, L2.00, L2.01, L2.10, L2.11; inserted by arch. rep. and taken back to John Menard (split out grading permit, see Bld08-01285)
|
Routing - PLUMBING | 6/5/2008 | | 6/9/2008 | | FAIL |
Bill VanDegrift
|
|
|
4" sewer at 1% is undersized. provide a kitchen equipment plan.
|
Routing - PLANNING | | | 6/9/2008 | | PASS |
David Moser
|
|
|
CUP08-00023-David Moser, Routed to Plan Check
|
Routing - Erosion and Sediment | 6/4/2008 | | 6/5/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00457
|
Routing - PUBLIC WORKS GRADING | 5/29/2008 | | 6/4/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | | | 6/4/2008 | | FAIL |
Brian Murphy
|
|
|
NEEDS DETAIL EXTRA SHEETS, DRAINAGE REORT, GEOTECH REPORT AND O AND M REVISIONS. BRIAN MURPHY ###-####
|
Routing PW Solid Waste | 5/30/2008 | | 6/2/2008 | | PASS |
Peter J. McCullough
|
|
|
Contacted architect, Amber Van Ocker, on 6-2-08. Dumpsters will be located on east side of service area.
|
Routing PW Sewer Rating | 5/30/2008 | | 5/30/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 5/29/2008 | | 5/29/2008 | | PASS |
Todd Tucker
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/28/2008 | | DONE |
Barbara Stitt
|
|
|
3 sets of new sheets inserted into plans by Amber Van Ocker's office 5-28-08 BAS
|
Application received | | 5/22/2008 | 5/22/2008 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/2008 | | PASS |
Darla L Downs
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/22/2008 | | DONE |
Bethany Sullins
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2008 | | FAIL |
Bethany Sullins
|
|
|
Called Amber VanOcker as there were 5 pages not stamped and signed on all 4 sets of plans///5-22-08 BAS
|