Application received | | 5/22/2008 | 9/17/2008 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FRONT DESK | 7/15/2008 | | 9/17/2008 | | PASS |
Cathy Brown
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/14/2008 | 8/11/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/15/2008 | | 7/15/2008 | | PASS |
Clint A Smith
|
|
|
ESC Plan approved with attached conditions. ESC08-00608
|
BLD-Final | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/11/2008 at 10:22:53 AM. Contact: ###-####. ok for perm occ
|
FIRE-Alarm Testing | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Permanent Occupancy | | | 7/14/2008 | | |
|
|
|
|
FIRE-Final Inspection | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | FAIL |
Forrest France
|
|
|
C/N items are complete with the exception of data cable run in the plenum without a raceway, conduit or plenum rating-see on site correction notice issued per J. Schmer electrical division.
|
BLD-Final | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:58:31 AM. Contact: ###-####.
|
BLD-Final | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/1/2008 at 9:58:31 AM. Contact: ###-####.
|
FIRE-Alarm Testing | 7/1/2008 | 7/1/2008 | 7/1/2008 | P | DONE |
Forrest France
|
|
|
Duplicate inspection request.
|
FIRE-Conference | 6/30/2008 | 7/1/2008 | 7/1/2008 | A | FAIL |
Forrest France
|
|
|
Need to repair two EM lights, exit door hardware at the east side exit is not approved, project related fire sprinkler permit needs to be requested for final, one PFE at the kitchen installed while on site, need to resolve plenum rated data cable issue.
|
BLD-Wall cover | 6/11/2008 | 6/12/2008 | 6/13/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:56:09 PM. Contact: ###-####.
|
BLD-Other | 6/13/2008 | 6/13/2008 | 6/13/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 1:56:09 PM. Contact: ###-####.ceiling grid need to get other trades above grid oked also needs to clip or place spreader bars at ends
|
BLD-Framing/Rough-in | 5/29/2008 | 5/30/2008 | 5/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 2:02:18 PM. Contact: ###-####. ok to cover walls after elec r/i is completed
|
Telephone call | | | 5/29/2008 | | DONE |
|
|
|
t/c w doug simpson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/29/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/23/2008 | 5/23/2008 | 5/28/2008 | | PASS |
Ron Hill
|
|
|
5/28/2008 15:00:28 RMH - activity updated through activity BLDA022 from case BLD08-01112.
|
Routing - PLAN CHECK | 5/23/2008 | | 5/28/2008 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 5/28/2008 | | DONE |
|
|
|
|
Routing - FIRE | | | 5/28/2008 | | PASS |
|
|
|
|
1st review completed | | | 5/28/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/28/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/28/2008 | | DONE |
|
|
|
|
Pending Assignment by MYS | 5/22/2008 | | 5/23/2008 | | DONE |
Marlene Southard
|
|
|
5/23/2008 08:19:02 LEG - activity updated through activity BLDA175 from case BLD08-01112.
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/23/2008 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 5/23/2008 | | 5/23/2008 | | PASS |
Beverly Hall
|
|
|
|