Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD08-01126
StatusFinaled
Name AMERICAN MECHANICAL
Site Address 800 W DIAMOND ST
Project NameACECO
Customer Number 
ePlanReviewNo
Description
(ACECO)(PHASE I STRUCTURAL T.I.) To upgrade the interior concrete slabs, providing new footings and structural steel for roof support and a new crane rail in a 5,097 sq.ft. area at the east end of an existing warehouse building per approved plans. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. A separate permit FIR08-00369 is in process to fire sprinkler this structure. (mys)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  11/6/2009 DONE
DetailsTisha Gallop
received voice messge from Glen Carsten/American Mech. that he is working on fv and will get them to me Mon. or Tue. of next week.
Third Notice 10/31/200911/5/2009 DONE
Telephone call  11/5/2009 DONE
DetailsTisha Gallop
called and spoke with Glenn/American Mech. need final values. He said misunderstood and thought only mechanical value. I explained he is general for the whole project and I need bld, ele, plm, and mech values. He said to fax it to him and will get it back to me today, he said not need to mail it to him.
Third Notice 10/8/200910/21/2009 DONE
faxed, mailed and called
Telephone call  10/21/2009 DONE
DetailsTisha Gallop
called and left voice message for Glenn w/American Mech. need final values
Third Notice 9/28/20099/28/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice6/17/20096/17/20099/17/2009 DONE
DetailsJim Storey
BLD-Final6/16/20096/17/20096/17/2009APASS
DetailsJim Storey
evert ###-#### 8:30 am appt. l/c
DOC - Permit Finaled6/17/20096/17/20096/17/2009PPASS
DetailsJim Storey
FIRE-Final Inspection6/5/20096/5/20096/5/2009APASS
DetailsForrest France
Fire life safety approved for final.
FIRE-Final Inspection4/30/20094/30/20095/5/2009PPART
DetailsForrest France
Project related fire sprinkler and alarm work has been finished.
FIRE-Final Inspection3/11/20093/11/20093/11/2009ANR
DetailsForrest France
See correction notice on site.
FIRE-Final Inspection3/9/20093/9/20093/9/2009PFAIL
DetailsForrest France
Noted missing exit signage and emergency lighting, door hardware needs switched at one location.
BLD-Aging Inspection2/25/20092/25/20092/25/2009PNR
DetailsJim Storey
sent e-mail to inform owner to what was outstanding and how to procced
FIRE-Final Inspection2/4/20092/4/20092/4/2009PPASS
DetailsForrest France
Okay for final this permit scope.
FIRE-Final Inspection11/7/200811/7/200811/7/2008PNR
DetailsForrest France
Need project related fire sprinkler permit finals.
BLD-Other7/28/20087/28/20087/28/2008PPASS
DetailsJim Storey
glen - structrual steel Phone #: ###-####
BLD-Footing6/24/20086/24/20086/24/2008PPASS
DetailsJim Storey
glen Phone #: ###-####
Routing Off Site - STRUCTURAL6/17/2008 6/23/2008 PASS
DetailsMarlene Southard
Called Action Courier for pick up 6-17-08 @ 8:36am BAS
PLANS/APPL TAKEN TO FRONT DESK  6/23/2008 DONE
Inspection Record Card- Bld  6/23/2008 DONE
Details
Routing - PLAN CHECK6/23/2008 6/23/2008 PASS
DetailsMarlene Southard
Telephone call  6/23/2008 DONE
Details
t/c w david ruby at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  6/23/2008 DONE
Details
Issue PAID IN FULL permit  6/23/2008  
Plan assigned to (MYS)5/23/2008 6/23/2008 PASS
DetailsMarlene Southard
6/23/2008 11:06:07 MYS - activity updated through activity BLDA022 from case BLD08-01126.
Plan resubmittals received  6/16/2008  
DetailsMarlene Southard
Received 1 cover transmittal, 3 copies of supplemental structural calcs, 3 copies of sheet S3.0 and taken to Marlene Southard's desk 6-16-08 @ 4:55pm BAS
Routing Off Site - STRUCTURAL6/10/2008 6/14/2008 FAIL
DetailsMarlene Southard
6/16/2008 - Routed 1 copy of resubmitted calcs and Sheet S2.1 to outside engineer for review.
6/14/2008 - received comments on 2nd review which did not pass. Sent review on to designing engineer via e-mail.
Routing - Erosion and Sediment6/9/2008 6/9/2008 PASS
DetailsClint A Smith
ESC plan waiver approved with attached conditions. ESC08-00463
Routing - PLAN CHECK6/9/2008 6/9/2008 PEND
DetailsMarlene Southard
Pending structural approval.
1st review completed  6/9/2008 FAIL
Failed structural.
Plan resubmittals received  6/9/2008  
DetailsMarlene Southard
Received three copies of supplemental structural calculations and sheet S2.1; taken to Marlene S.
Pending Assignment by MYS5/23/2008 6/9/2008 DONE
DetailsMarlene Southard
6/9/2008 09:49:02 MYS - activity updated through activity BLDA165 from case BLD08-01126.
Routing Off Site - STRUCTURAL5/27/2008 6/6/2008 FAIL
DetailsMarlene Southard
Called Action Courier for pick up 5-27-08 @ 3:15pm BAS
6/6/2008 - Received plan review from outside structural reviewer. Resubmittals are required. Sent comments to Keith Jones attached to e-mail on 6/9/2008.
Application received 5/23/20085/23/2008 DONE
DetailsDarla L Downs
Recd Pcfee & Taken To Pln CK  5/23/2008 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  5/23/2008 DONE
DetailsBarbara Stitt