Permit NumberBLD08-01127
StatusFinaled
Name ESI
Site Address 650 N ARMSTRONG PL
Project NameWINCO
Customer Number 
ePlanReviewNo
Description
Winco - Office Expansion and Remodel - To construct a 40,790 square foot, one story masonry and wood framed office addition on the east end of the existing Winco office building. The new addition will include an entry lobby, break room, focus assembly room, gym, locker rooms, restrooms and office areas. This permit is also for remodel work at the existing building, including converting existing 1,200 square foot entry to future work area, remodel a 912 sq. ft. office area configuration at offices #169 - #173 and offices #179 - #183 and to remodel a 1,450 square foot office area configuration at offices #112 - #132. This permit also includes related site improvements. This building is fully fire sprinkled. The sprinklers are used for area increase. The assembly areas are viewed as accessory spaces to the main Office B Occupancy per IBC, Section 508.3.1. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/15/200910/2/2009 DONE
faxed, mailed and called
Telephone call  10/2/2009 DONE
DetailsTisha Gallop
called and left voice message for Shelly/ESI need final values.
Third Notice 9/4/20099/15/2009 DONE
Telephone call  9/15/2009 DONE
DetailsTisha Gallop
called and left voice message for Janae w/ESI need final values
Third Notice 8/5/20099/4/2009 DONE
Second Notice 7/22/20098/5/2009 DONE
First Notice 3/31/20097/22/2009 DONE
Permanent Occupancy UNPAID FEE  3/31/2009 DONE
DetailsBarbara Stitt
BLD-Final3/29/20093/30/20093/30/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/29/2009 at 11:05:51 AM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection3/29/20093/30/20093/30/2009APASS
DetailsTroy Cobbley
Life safety passed.
Code Occupancy Approval  3/26/2009 PASS
Landscaping and parking lot striping has been completed. Ok for permanent occupancy.
PubWorks Occupancy Approval3/23/20093/23/20093/23/2009 DONE
Details
Per phone call from Dan Erskine with public works, ok to occupy///3-23-09 BAS
BLD-Framing/Rough-in3/11/20093/12/20093/12/2009APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/11/2009 at 6:26:03 PM. Contact: ###-####.
BLD-Framing/Rough-in3/2/20093/3/20093/3/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/2/2009 at 3:10:03 PM. Contact: ###-####. Interior partition walls ok. Also reinspected priviously installed ceiling grid, system has been matched to exisiting system. ok.
BLD-Framing/Rough-in2/25/20092/25/20092/25/2009APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/25/2009 at 6:50:01 AM. Contact: ###-####. Needs to match existing system were new grid is being installed.
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/19/2009 at 5:59:49 AM. Contact: ###-####.
Frame infill of large doorway at existing (old) front entry OK.
FIRE-Final Inspection2/4/20092/5/20092/5/2009APART
DetailsTroy Cobbley
The new addition is ok to occupy.
FIRE-Final Inspection2/3/20092/4/20092/4/2009PFAIL
DetailsTroy Cobbley
The access controlled egress doors are not operational yet. The inspection will be called in for tomorrow.
BLD-Final1/28/20091/29/20091/30/2009PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/28/2009 at 9:42:10 PM. Contact: ###-####. ok to move in to new addition they are working on front entry doors they are also going to add several exit signs in nw section also sink in break room needs to be lowered to 34 inches
FIRE-Final Inspection1/28/20091/29/20091/29/2009PFAIL
DetailsTroy Cobbley
The new addition is basically complete. I gave my permission for furniture and office equipment to be moved into this new area but business is not to be done until the main entry doors/hardware is installed and inspected. Also six office doors/hardware are backordered and the hardware is missing from the double doors into the Mail Room. The fire sprinkler system and fire alarm systems are complete for the new addition. Fire lane signs are being installed until weather permitting the fire lane striping can be completed.
Zoning Approval Temp1/28/20091/28/20091/28/2009 PASS
Temporary occupancy-- Bond is in place for unfinished parking lot striping
BLD-Framing/Rough-in1/26/20091/26/20091/26/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/26/2009 at 6:47:14 AM. Contact: ###-####. Ceiling grid pahase 4.
BLD-Other1/20/20091/20/20091/20/2009PPART
DetailsMike Jordan
ceiling grid for phase 2 and 3.
OVERRIDE  1/20/2009  
BLD-Framing/Rough-in1/20/20091/20/20091/20/2009APASS
DetailsMike Jordan
chris - ###-#### - ceiling grid - ok per john menard. Phase 1 ok.
Plan assigned to (JCM)1/15/20091/15/20091/20/2009 PASS
DetailsJohn Menard
1/20/2009 10:40:52 JCM - activity updated through activity BLDA022 from case BLD08-01127.
Override - Parcel Holds  1/20/2009  
Override - Parcel Holds  1/20/2009  
CHANGE STATUS TO (ISS)  1/20/2009 DONE
DetailsBarbara Stitt
plan mod issued
(F) Reprint permit  1/20/2009 DONE
DetailsBarbara Stitt
Plan Reviewer's activity  1/20/2009 PASS
DetailsJohn Menard
Approved plan modification to change two-hour fireproofing material from a high density material to a thicker application of a medium density fireproofing (CAFCO 400).
PLANS/APPL TAKEN TO FRONT DESK  1/20/2009 DONE
DetailsJohn Menard
Routing - PLAN CHECK1/16/2009 1/20/2009 PASS
DetailsJohn Menard
Override - Parcel Holds  1/20/2009  
Permit Ready to Issue  1/20/2009 DONE
BLD-Framing/Rough-in1/15/20091/15/20091/15/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/15/2009 at 9:33:43 AM. Contact: ###-####. Expansion anchors at bottom track for dalse canopy.
BLD-Framing/Rough-in1/14/20091/15/20091/15/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/14/2009 at 4:41:30 PM. Contact: ###-####. Expansion anchors in bottom track for canopy framing. wip on false canopy.
Plan Modification Accepted  1/15/2009  
DetailsAlexandra L. DeYoung
Rec'd 1-15-09- Moddifications being made: the applied fireproofing material has been changed, the product originally specified was a high density cementitions material. Due to availability and cost, the owner authorized the use of a medium density product. The two- hour fire resistive regcuriement is maintained with this change in product. Rec'd sheets- T-1, A1.1, A3.2- taken to John M
BLD-Framing/Rough-in1/13/20091/14/20091/14/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/13/2009 at 9:17:28 PM. Contact: ###-####. remainder of soffit at main canopy.
BLD-Framing/Rough-in1/13/20091/13/20091/14/2009PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/13/2009 at 8:16:20 AM. Contact: ###-####. soffit for false canopy. hardlid for janitors closet.
BLD-Conference1/9/20091/12/20091/12/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/9/2009 at 4:34:38 PM. Contact: ###-####. Discussed fireproofing material that was used. A different material was applied than was submitted and approved. In place material will be ok, contractor to apply more to obtain required density. Material applied has been approved by architect of record. Will have new approved submital scanned into permit at city hall.
BLD-Framing/Rough-in1/9/20091/12/20091/12/2009APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/9/2009 at 4:33:29 PM. Contact: ###-####. Framing for hardlid in existing bldg. for card reader room.
BLD-Framing/Rough-in1/6/20091/6/20091/6/2009PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/6/2009 at 9:22:17 AM. Contact: ###-####. HArdlids for south restrooms ok. Framing for southeast canopy, Needs to install expansion anchors as shown on aproved plans.
BLD-Framing/Rough-in12/31/200812/31/200812/31/2008PPART
DetailsJim Sly
CHRIS Phone #: ###-####
Hard lids....North restrooms....Curtain wall framing at South canopy OK.
BLD-Energy code compliance12/18/200812/19/200812/19/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/18/2008 at 9:53:11 PM. Contact: ###-####. BAtt insul. at exterior walls, east and north walls ok.
BLD-Framing/Rough-in12/19/200812/19/200812/19/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/18/2008 at 9:53:11 PM. Contact: ###-####. Steel stud framing for canopy at main enterance.
BLD-Framing/Rough-in12/18/200812/18/200812/18/2008PPASS
DetailsMike Jordan
869-534 - chris
BLD-Energy code compliance12/18/200812/18/200812/18/2008PPART
DetailsMike Jordan
###-#### - chris
Telephone call  12/18/2008 DONE
Details
t/c w john marcotte at ###-#### - permit ready and fees given
Permit Ready to Issue  12/18/2008 DONE
Details
CHANGE STATUS TO (ISS)  12/18/2008 DONE
DetailsBarbara Stitt
Plan Mod issued
(F) Reprint permit  12/18/2008 DONE
Print Occupancy Form  12/18/2008 DONE
Plan assigned to (JCM)12/16/200812/16/200812/17/2008 PASS
DetailsJohn Menard
12/17/2008 13:48:41 JCM - activity updated through activity BLDA022 from case BLD08-01127.
Plan Reviewer's activity  12/17/2008 PASS
DetailsJohn Menard
Reviewed and approved plan modification to interior layout of offices, meeting room and conference room split into two offices each and two existing offices are split into four smaller offices. Modification affects some architectural, mechanical, plumbing, electrical and sprinkler plans.
Routing - PLAN CHECK12/16/2008 12/17/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  12/17/2008 DONE
DetailsJohn Menard
BLD-Energy code compliance12/16/200812/16/200812/16/2008PPASS
DetailsMike Jordan
###-#### - chris . Exterior CMU walls ok.
Override - Parcel Holds  12/16/2008  
Plan Modification Accepted  12/12/2008 DONE
DetailsBarbara Stitt
Plan modification accepted for the revision to interior layout of offices-conference room revised to 2 offices, team meeting room revised to make 2 offices, 2 existing offices revised to create 4 offices. Changes affect mechanical, plumbing and electrical configuration and fire sprinkler. Submitted sheets for plan modification are A.01, A1.0, A4.0, A4.1, A8.0, A9.0, A9.1, P2.11, P2.12, M2.1, M2.1p, M2.1c, E0.0, E2.1l, E2.1p, E2.1t, E3.0. Additional value of $20,000 added to this project for the plan mod.///12-16-08 BAS
BLD-Framing/Rough-in12/11/200812/11/200812/11/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/11/2008 at 11:17:59 AM. Contact: ###-####. Interior steel stud framed walls. Still needs backing for ada in restrooms and plumbing ri insp as well. Will need to provide materila at roof decking for smoke partitions.
BLD-Framing/Rough-in12/5/200812/5/200812/5/2008PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/5/2008 at 8:44:02 AM. Contact: ###-####.
BLD-Framing/Rough-in12/2/200812/2/200812/2/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/2/2008 at 10:02:12 AM. Contact: ###-####. Interior steel stud 7ft. partition walls ok. Also reveiwed special insp. reports to date.
BLD-Concrete10/15/200810/15/200810/15/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/15/2008 at 9:23:46 AM. Contact: ###-####. Grout placement cancelled for today. Did review special insp. reports. Noted several faling compaction tests. Contractor noted that failing areas had been retested.
BLD-Concrete9/30/20089/30/20089/30/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/30/2008 at 11:09:33 AM. Contact: ###-####. Masonry: 0 to 4ft. elevation, grid G between grids 5 to 9. ok for grout placement after special insp. is ok.
BLD-Footing9/26/20089/26/20089/26/2008PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/26/2008 at 9:55:44 AM. Contact: ###-####.
BLD-Footing9/23/20089/24/20089/24/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/23/2008 at 11:21:47 AM. Contact: ###-####. exterior column pad footings at south end of bldg.
BLD-Footing9/16/20089/17/20089/17/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/16/2008 at 5:12:50 PM. Stemwall on gridline G between grids 5 -8.5.
BLD-Footing9/16/20089/16/20089/16/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/16/2008 at 7:36:56 AM. Contact: ###-####. Exterior stemwalls on east and south ends.
BLD-Footing9/15/20089/15/20089/15/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/15/2008 at 11:03:09 AM. Contact: ###-####. All interior column pad footings, exterior footing on grid G between grids 5 -8.5
FIRE-Conference9/15/20089/15/20089/15/2008ADONE
DetailsTroy Cobbley
The new office area in the existing building next to the breakroom is ok to occupy.See the city approved plans for the location signed and marked with todays date.
FIRE-Final Inspection9/12/20089/12/20089/12/2008PFAIL
DetailsTroy Cobbley
This inspection actually turned into a conference on the remodeled area of the existing building next to the break room. I agreed that people could move in when a emergency light/exit sign is installed over the exit way to the corridor.
BLD-Framing/Rough-in9/9/20089/10/20089/10/2008ACANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/9/2008 at 5:40:59 PM. Contact: ###-####.
BLD-Footing9/9/20089/10/20089/10/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/9/2008 at 5:39:21 PM. Contact: ###-####. Exterior footings on grids C and G between grids 7 to 11 and on grid 11 between grids c to G. Spoke with engineer from Tamarack engineering on vertical reinforcement. Should be #4 at 16" oc then #6 verts at 24"oc for masonry const. RFI will be sent to contractor. Ok to place conc. once special insp agency has inspected the completed work.
BLD-Framing/Rough-in8/28/20088/28/20088/28/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/28/2008 at 9:29:31 AM. Contact: ###-####. Interior steel stud 7ft. partition walls for new offices in existing portion of bldg. phase 1.
BLD-Framing/Rough-in8/26/20088/27/20088/27/2008PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/26/2008 at 5:46:11 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 27 2008 10:35AM.
Override - People Holds  8/6/2008  
Issue PAID IN FULL permit  8/6/2008 DONE
DetailsTisha Gallop
Print Occupancy Form  8/1/2008 DONE
CHANGE STATUS TO (RDY)  8/1/2008 DONE
Telephone call  8/1/2008 DONE
Called Brian Liquin and was put to Randy to leave a message permit ready and fee given Also need ACHD/RCE NUMBER AND RP BEFORE LETTING THIS PLAN OUT THE DOOR ///DLD
Routing - PLAN CHECK7/29/2008 7/31/2008 PASS
DetailsJohn Menard
Plan resubmittals received  7/31/2008  
received "2" sets of plans including T1, A.1.O, A1.1, A2.O, A3.2, P2.11, P2.12, P3.O, E2.1P, E3.O- also response letter (3) pages, (11) pages of scope of work info-- took plans back to John Menard
Plan Reviewer's activity  7/31/2008 PASS
DetailsJohn Menard
Reviewed and approved resubmitted revised plans. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/31/2008 DONE
DetailsJohn Menard
Plan assigned to (JCM)5/28/2008 7/31/2008 PASS
DetailsJohn Menard
7/31/2008 16:02:11 JCM - activity updated through activity BLDA022 from case BLD08-01127.
Routing - PLAN CHECK7/28/2008 7/29/2008  
Routing - PUBLIC WORKS7/29/2008 7/29/2008 PASS
DetailsBeverly Hall
Routing PW Drainage7/29/2008 7/29/2008 PASS
DetailsBrian Murphy
Routing - FIRE7/25/2008 7/28/2008 PASS
DetailsScott Arellano
Attached updatd IFC comments to plans
Plan resubmittals received  7/28/2008 DONE
DetailsJohn Menard
Received 5 copies of sheets C3.01, C3.02, C4.00
Routing - PLAN CHECK7/10/2008 7/25/2008 FAIL
DetailsJohn Menard
Plan Reviewer's activity  7/25/2008 PASS
DetailsJohn Menard
Reviewed and approved revised structural calculations and revised details. JCM
Plan resubmittals requested  7/25/2008 DONE
DetailsJohn Menard
E-mialed the architect a letter requesting additional revisions. JCM
Plan resubmittals received  7/22/2008  
DetailsJohn Menard
Received response letter to Fire review, response letter to Structural review, United Water Flow sheet, 2pg. Structural plan review comments from Tamarak Grove Engineering, 1pg. Structural plan review comments from DC Engineering, two copies of Code Complicance Research, two copies of Door Hardware Report, two copies of Supplemental Structural Calculations, two copies of sheets C2.00, C5.00, S-1.0, S-1.1, S-2.0, S-2.2, A1.0, A1.1, A2.0, A2.1, A4.0, A7.0, A8.0, A9.0, M2.1, E0.0, E2.1L; inserted by arch. rep. and taken back to John Menard
Routing - FIRE7/8/20087/8/20087/10/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  7/10/2008 FAIL
Failed PW, Structural, Plan Check, Fire
Route to Impact Fee Review7/8/20087/11/20087/9/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK6/23/2008 7/8/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  7/8/2008 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PUBLIC WORKS6/23/2008 6/23/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage6/23/2008 6/23/2008 FAIL
DetailsBrian Murphy
NEED ALTER. TECH. REQUEST.GW EST,DETAIL SPECING ANY BACKFILL IF NEEDED,O AND M KEEP RECORDS 5 YEARS AND DRAWINGS. BRIAN MURPHY ###-####
Routing - PLAN CHECK6/4/2008 6/23/2008  
DetailsJohn Menard
John Menard
Plan resubmittals requested  6/18/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of structural review comments requesting revisions. JCM
Routing Off Site - STRUCTURAL5/28/2008 6/10/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLANNING6/4/2008 6/4/2008 PASS
DetailsDavid Moser
DRH08-00048 Josh W.-- PASS; CUP08-00015 David M. routed to John M. (Plan Check)
Routing - PLUMBING6/3/2008 6/4/2008 PASS
DetailsBill VanDegrift
BFP-1 is listed as an R.P., if it is installed, drainage will need to be increased to accept the full discharge. DCVA would be the best choise for the degree of hazard. 120 deg. max. hot water to public lavs.
Routing PW Solid Waste  6/3/2008 PASS
Exisiting enclosures are adequate.
Routing PW Street Lights6/3/2008 6/3/2008 PASS
DetailsHank Alarcon
Routing - Erosion and Sediment6/3/2008 6/3/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00464
Routing - PUBLIC WORKS5/28/2008 6/3/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage5/30/2008 6/2/2008 FAIL
DetailsBrian Murphy
Need more geo tech info and oand m revisions. brian murphy ###-####
Routing PW Sewer Design5/29/2008 5/29/2008 PASS
DetailsJon R. Gunnerson
Connect to existing service provided
Routing PW Sewer Rating5/29/2008 5/29/2008 PASS
DetailsConnie Baumgartner
Pending Assignment by MYS5/23/2008 5/28/2008 DONE
DetailsJohn Menard
5/28/2008 11:27:36 JCM - activity updated through activity BLDA166 from case BLD08-01127.
Routing - PLANNING Land Div5/28/2008 5/28/2008 PASS
DetailsJoan Johnson
Plans ACCEPTED BY PLAN TECH  5/28/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/28/2008 DONE
DetailsTisha Gallop
Telephone call  5/28/2008 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Application received 5/23/20085/23/2008 DONE
DetailsTisha Gallop
Plan resubmittals received     
DetailsJohn Menard
Received 5 copies of sheets C3.01, C3.02, C4.00 and inserted into plans then taken back to John Menard's desk///7-28-08 @ 4:45pm BAS