(THE ASPEN - RESIDENTIAL UNIT 1103) Fire sprinklers required because this building is a high-rise. To create a 1,010 square foot dwelling unit on the 11th story of a new high-rise building. The 1-hr corridor on this story will be constructed in conjunction with this permit. Work is to include 1-hr fire-resistance-rated tenant demising walls, 1-hr fire-resistance-rated corridor, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. This dwelling unit is required to comply with ICC/ANSI A117.1-2003 Section 1004 as a Type B dwelling unit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/23/2011 DONE
First Notice 9/27/20099/17/2009 DONE
Permanent Occupancy  9/17/2009 DONE
BLD-Final9/15/20099/15/20099/16/2009PDONE
DetailsDave Hannah
BLD-Final9/16/20099/16/20099/16/2009APASS
DetailsDave Hannah
ok for perm occ
FIRE-Final Inspection9/14/20099/15/20099/15/2009APASS
DetailsForrest France
Final inspection satisfactory
BLD-Framing/Rough-in3/20/20093/20/20093/23/2009PPASS
DetailsDave Hannah
Brad Phone #: ###-####
Issue PAID IN FULL permit  1/8/2009 DONE
DetailsAlexandra L. DeYoung
Telephone call  9/18/2008 DONE
Details
t/c w john price at ###-#### - permit ready and fees given
Permit Ready to Issue  9/18/2008 DONE
Details
Print Occupancy Form  9/17/2008 DONE
Details
Routing - PLAN CHECK8/19/2008 8/20/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  8/20/2008 DONE
DetailsCarl Westfall
Plan assigned to (CJW)6/2/2008 8/20/2008 PASS
DetailsCarl Westfall
8/20/2008 10:47:17 CJW - activity updated through activity BLDA022 from case BLD08-01143.
Routing - FIRE8/15/20088/15/20088/19/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/19/2008 PASS
Route to Impact Fee Review8/15/20088/20/20088/18/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK6/3/2008 8/15/2008 PASS
DetailsCarl Westfall
The IBC plan review was started and finished on August 15, 2008. The drawings were approved with "red lines".
Routing - PUBLIC WORKS6/2/2008 6/3/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS5/30/2008 6/2/2008 DONE
DetailsMarlene Southard
6/2/2008 15:58:57 MYS - activity updated through activity BLDA172 from case BLD08-01143.
Recd Pcfee & Taken To Pln CK  5/28/2008 DONE
DetailsTisha Gallop
Application received 5/27/20085/27/2008 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  5/27/2008 DONE
DetailsTisha Gallop