Permit Information
Permit NumberBLD08-01151
StatusFinaled
Name PARKLANE MGMT CO
Site Address 1020 W MAIN ST
Project NameALASKA BLDG-1ST FLR
Customer Number 
ePlanReviewNo
Description
(ALASKA BUILDING - PARTIAL MEZZANINE ABOVE 1ST FLR) To remove an 1,650 sq. ft. portion of mezzanine within and existing retail occupancy space; to install guard rails at the new open end of remaining mezzanine and modify sprinkler system to maintain code compliance per NFPA 13 at new open area. This building is fully sprinklered as substitution for 1-hour fire resistive construction. No electrical, plumbing or mechanical work indicated as part of this permit. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/7/20107/2/2010 DONE
Third Notice 6/1/20106/24/2010 DONE
called and faxed to Parklane Mgmt Co
Telephone call  6/24/2010 DONE
DetailsTisha Gallop
called Community Contracting and he said not responsible or knows the final values and to send FV to applicant Parklane Mgmt Co.
Third Notice 5/16/20105/21/2010 DONE
mailed
Second Notice 5/7/20105/11/2010 DONE
First Notice4/9/20104/9/20104/27/2010 DONE
DetailsDave Hannah
BLD-Final4/9/20104/9/20104/9/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled4/9/20104/9/20104/9/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection3/16/20103/16/20103/16/2010APASS
DetailsForrest France
Scope of demo permit work completed, fire life safety passed.
FIRE-Conference3/10/20093/10/20093/10/2009PDONE
DetailsForrest France
Regarding exceptions allowed per NFPA 13 standard for combustible concealed spaces.
Case Summary (BLD)  12/4/2008  
BLD-Aging Inspection10/22/200810/22/200810/23/2008 PART
DetailsDave Hannah
exps on 01/10/09
Issue PAID IN FULL permit  7/14/2008 DONE
Routing - PLAN CHECK6/27/2008 7/3/2008 PASS
DetailsDan Stuart
Received e-mail structural review approval from contract engineer. To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  7/3/2008 PASS
Inspection Record Card- Bld  7/3/2008 DONE
Telephone call  7/3/2008 DONE
DetailsAlexandra L. DeYoung
called mark at ###-#### (ext 3), permit ready, fees given
Permit Ready to Issue  7/3/2008 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (DRS)6/6/2008 7/3/2008 PASS
DetailsDan Stuart
7/3/2008 07:51:45 DRS - activity updated through activity BLDA022 from case BLD08-01151.
Routing Off Site - STRUCTURAL7/1/2008 7/2/2008 PASS
DetailsDan Stuart
Received e-mail approval from contract structural engineer for this project. Copy with plans to records.
Routing - FIRE6/25/20086/25/20086/27/2008 PASS
DetailsScott Arellano
No seperate plan review comments attached. Refer to IBC plan review report for additional guard rail requirements. A seperate fire sprinlkler and/or fire alarm permit will be required for modifications to existing systems.
1st review completed  6/27/2008 FAIL
Failed Structural & Plan Check
Route to Impact Fee Review6/25/20086/30/20086/26/2008 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing Off Site - STRUCTURAL6/11/2008 6/25/2008 FAIL
DetailsDan Stuart
Called Action Courier for pick up 6-11-08 @ 9:15am BAS
6/25/08 - Received structural plan review report from outside third party contract structural plan review firm. Resubmittals are required. Copy of the structural engineering plan review report was e-mailed to architect Mark Sanders for response.
Routing - PLAN CHECK6/6/2008 6/25/2008 FAIL
DetailsDan Stuart
Resubmittals required on guardrail design and attachment. Copy of plan review e-mailed to architect. Routing to fire code analyst. Outside structural review also failed.
Pending Assignment by MYS5/27/2008 6/6/2008 DONE
DetailsMarlene Southard
6/6/2008 10:13:48 MYS - activity updated through activity BLDA168 from case BLD08-01151.
Application received 5/27/20085/27/2008 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  5/27/2008 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  5/27/2008 DONE
DetailsBarbara Stitt