Telephone call | | | 12/16/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Eric still need breakdown of final values, Stock Const. is now on hold for no inspections or permit until I receive this.
|
Telephone call | | | 11/25/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Eric Holenka/Stock Const. need breakdown of contractors to process final value he gave, told him if not hear from him within two weeks will put company on hold.
|
Third Notice | | 11/5/2009 | 11/5/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/5/2009 | | DONE |
Tisha Gallop
|
|
|
called Erick Holenka/Stock Const. and left vm need additional info for final values. Need breakdown of seperate contractors per more than one one on each trade.
|
Third Notice | | 10/17/2009 | 10/26/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 10/26/2009 | | DONE |
Tisha Gallop
|
|
|
called and left two vm, one for Eric Holenka and one in the general mailbox need final values. Note: got correct fax number from the company's general voice message.
|
Third Notice | | 9/8/2009 | 10/7/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2009 | | |
Tisha Gallop
|
|
|
called Stock Const. and left voice message need good fax number
|
Second Notice | | 7/23/2009 | 9/8/2009 | | DONE |
|
|
|
|
First Notice | | 6/10/2009 | 7/23/2009 | | DONE |
|
|
|
|
BLD-Final | 6/9/2009 | 6/10/2009 | 6/10/2009 | A | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####.. All issues resolved. Ok for perm occ.
|
Permanent Occupancy | | | 6/10/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/22/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/22/2008 | | DONE |
|
|
|
|
OVERRIDE | | | 12/18/2008 | | |
|
|
|
|
Print Occupancy Form | | | 12/18/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2008 | | DONE |
|
|
|
t/c w scott wendell at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/18/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/17/2008 | | 12/17/2008 | | PASS |
Tim L. Woodard
|
|
|
12/17/2008 17:19:53 TLW - activity updated through activity BLDA022 from case BLD08-01168.
|
Routing - PLAN CHECK | 12/17/2008 | | 12/17/2008 | | PASS |
Tim L. Woodard
|
|
|
PLAN MODIFICATION 12-17-08 - Modification submitted to add another egress stair for convienence into hallway A134. The addition of this stairway will improve the ease of access to the second level of Phase I of the ADA county Campus building, it is not required for any code provisions.**TLW**
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2008 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 12/17/2008 | | DONE |
|
|
|
|
BLD-Final | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. ok for temp occ. Will be ok for perm occ once phase 2 has been completed and passed.
|
Temporary Occupancy | 12/16/2008 | 3/16/2009 | 12/16/2008 | | DONE |
Darla L Downs
|
|
|
|
Plan Modification Accepted | | | 12/16/2008 | | |
Tim L. Woodard
|
|
|
Plan modification accepted to add stairway. SHeets A2.10, A2.11 and A8.1 submitted with an additional value of $20,000///12-16-08 BAS
|
Received Certificate of Value | | | 12/16/2008 | | DONE |
Barbara Stitt
|
|
|
Additional value of $20,000///12-16-08 BAS
|
FIRE-Final Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given as per the project scope of work until the phase II of the project is complete.
|
FIRE-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 | P | FAIL |
Troy Cobbley
|
|
|
Provide missing emergency lighting/exit signs as marked on the plans and relocate the occupant load signs as discussed.
|
BLD-Other | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | PASS |
Mike Jordan
|
|
|
jerry Note: rebar Phone #: ###-####. Column pad footings for new partition wall and for post and beam assembly for removal of bearing wall.
|
FIRE-Alarm Testing | 12/11/2008 | 12/11/2008 | 12/11/2008 | P | CANC |
Troy Cobbley
|
|
|
jerry Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 12/3/2008 | 12/4/2008 | 12/4/2008 | P | CANC |
Troy Cobbley
|
|
|
Not ready for a life safety final
|
BLD-Other | 11/17/2008 | 11/18/2008 | 11/18/2008 | A | PASS |
Mike Jordan
|
|
|
jerry - ceiling grid cover - after 10:00 please Phone #: ###-####. Ceiling grid, 1st. floor ok.
|
BLD-Other | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | PASS |
Mike Jordan
|
|
|
Ceiling grid, 2nd. floor only. ok
|
BLD-Other | 11/11/2008 | 11/12/2008 | 11/12/2008 | A | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/11/2008 at 3:11:32 PM. Contact: ###-####.
|
Zoning Approval | 11/10/2008 | 11/10/2008 | 11/12/2008 | | DONE |
Sue Cummings
|
|
|
Phase 1 OK.
|
FIRE-Supply Line Cover | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PASS |
Troy Cobbley
|
|
|
This inspection was for the covering of the sprinkler piping on the second floor. This piping can be covered.
|
BLD-Other | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | PART |
Mike Jordan
|
|
|
jerry Note: ceiling Phone #: ###-####. Ceiling grid, 1st. floor, area at warehouse were new was aded to existing. New portion installed as existing was installed.
|
FIRE-Conference | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | DONE |
Troy Cobbley
|
|
|
jerry Phone #: ###-####
|
BLD-Other | 10/30/2008 | 10/31/2008 | 10/31/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 12:55:15 PM. Contact: ###-####. Masonry wing wall and added parapet at 3hr. wall location. Also reviewed special insp. reports. Also recieved and submitted calcs from architect for 3hr. hallow core precast panel.
|
BLD-Framing/Rough-in | 10/30/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 12:54:35 PM. Contact: ###-####. Framing for added stairway. Plan mod has been submitted to city per contractor.
|
BLD-Footing | 10/22/2008 | 10/22/2008 | 10/22/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 6:44:56 AM. Contact: ###-####. Stemwalls and column pedestals for new canopy on north side of bldg.
|
BLD-Foundation | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | PART |
Mike Jordan
|
|
|
jerry Note: rebar Phone #: ###-####. Column pad footings and footings for new canopy at north side of bldg. Special insp. on site.
|
BLD-Conference | 10/17/2008 | 10/20/2008 | 10/20/2008 | A | DONE |
Mike Jordan
|
|
|
jerry Note: for t-bar Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. Hardlids in restrooms, 2nd floor.
|
BLD-Framing/Rough-in | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | NR |
Mike Jordan
|
|
|
No framing insp done. ESC issues were not resolved from last insp. see esc permit.
|
BLD-Framing/Rough-in | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Mike Jordan
|
|
|
jerry Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. 1st. floor interior framed walls only. No grid or hardlids. Also gave contrctor c/n to have architect provide a listed aproved assembly for 3hr. exterior loading dock wall. Existing wall is hallow core precast conc. wall. Assembly submitted was for a solid conc. wall.
|
BLD-Framing/Rough-in | 8/29/2008 | 8/29/2008 | 8/29/2008 | A | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/29/2008 at 6:59:16 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. interior framed walls only, 2nd floor. No grid or hardlids.
|
BLD-Framing/Rough-in | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | NR |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Needs ri insp. from other trades first.
|
BLD-Framing/Rough-in | 8/4/2008 | 8/5/2008 | 8/5/2008 | A | PART |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Framing for new open stairway from existing mezz. ok. to rock and install handrails.
|
Plan assigned to (TLW) | 6/6/2008 | | 7/30/2008 | | PASS |
Tim L. Woodard
|
|
|
7/30/2008 09:49:58 TLW - activity updated through activity BLDA022 from case BLD08-01168.
|
Routing - PLAN CHECK | 7/22/2008 | | 7/30/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/30/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/30/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2008 | | DONE |
|
|
|
t/c w scott wendell at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 7/30/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/30/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/22/2008 | | |
Tim L. Woodard
|
|
|
Received transmittal, three copies of Door Hardware, and three copies of sheets A2.4, A2.11, A8.1, E2.1L, E2.2L; taken to Tim Woodard
|
Routing - FIRE | 7/18/2008 | | 7/22/2008 | | PASS |
Kenneth R Roule
|
|
|
See IFC fire plan review notes.
|
1st review completed | | | 7/22/2008 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PLAN CHECK | 6/11/2008 | | 7/18/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report.
|
Routing - PLANNING | 6/9/2008 | | 6/11/2008 | | PASS |
Sue Cummings
|
|
|
CUP07-00145
|
Routing - Erosion and Sediment | 6/6/2008 | | 6/9/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00512
|
Routing - PUBLIC WORKS | 6/6/2008 | | 6/6/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 6/6/2008 | | 6/6/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 6/2/2008 | | 6/6/2008 | | DONE |
Marlene Southard
|
|
|
6/6/2008 11:18:38 MYS - activity updated through activity BLDA185 from case BLD08-01168.
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2008 | | DONE |
|
|
|
Was told by Scott Wendell -ok to have only 1 application for these two floors.
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2008 | | DONE |
|
|
|
|
Application received | | 5/28/2008 | 5/28/2008 | | DONE |
Darla L Downs
|
|
|
|