Telephone call | | | 8/18/2014 | | DONE |
|
|
|
When they come in about a new certifiacate of occupancy please get them with Sam Z he knows what is going on 8/18/14
|
Third Notice | | 10/17/2009 | 10/21/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2009 | | DONE |
Tisha Gallop
|
|
|
called Rod w/Ridgway Ind. (plm contractor) per no plumbing permit connected to project. He said will check into it and call me back
|
Third Notice | | 9/8/2009 | 10/7/2009 | | DONE |
|
|
|
|
Second Notice | | 7/22/2009 | 9/8/2009 | | DONE |
|
|
|
|
First Notice | 5/18/2009 | 5/18/2009 | 7/22/2009 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 5/18/2009 | 5/18/2009 | 5/18/2009 | | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/18/2009 | 5/18/2009 | 5/18/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 2/27/2009 | 2/27/2009 | 3/2/2009 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Jim Storey
|
|
|
andy Phone #: ###-#### l/c
|
Case Summary (BLD) | | | 9/23/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2008 | | DONE |
Sam Zahorka
|
|
|
Called and left message with Cathy the Architect.
|
Plan Reviewer's activity | | | 9/19/2008 | | DONE |
Sam Zahorka
|
|
|
Revised the Occupant load calculation due to Assembly net mis-calculation.
Office/leasing area = 4
Community Center = 48
|
BLD-Grading Inspection | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/18/2008 | 9/18/2008 | 9/18/2008 | P | FAIL |
Dave Hannah
|
|
|
needs to lower sinks landing outside of backdoor
|
FIRE-Final Inspection | 9/17/2008 | 9/17/2008 | 9/18/2008 | P | PASS |
Forrest France
|
|
|
C/N is completed with the exception of the landing at the south exit-to be finished prior to structural final, hardware at the interveining door changed to passage, life safety passed.
|
BLD-Final | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | NR |
Dave Hannah
|
|
|
andy Phone #: ###-#### needs other trades to final first
|
FIRE-Final Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | FAIL |
Forrest France
|
|
|
Need to post building address numbers, missing max. occupant load sign per review notes, threshold at the south exit discharge is not yet finished, door hardware at the intervening space does not comply with IFC 2006 1014.2 (2.) (3.).
|
BLD-Energy code compliance | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PASS |
Jim Storey
|
|
|
vic Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PASS |
Jim Storey
|
|
|
vic Phone #: ###-####
|
BLD-Conference | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/1/2008 at 10:01:50 AM. Contact: ###-####. first layer of ceilling assembly ok for cover.
|
BLD-Conference | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/18/2008 at 2:09:10 PM. Contact: ###-####. reviewed 2 hr ceilling aplacation.
|
Issue PAID IN FULL permit | | | 7/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2008 | | DONE |
|
|
|
t/c w catherine sewell at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 6/26/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 6/6/2008 | 6/13/2008 | 6/25/2008 | | PASS |
Sam Zahorka
|
|
|
6/25/2008 11:32:09 SRZ - activity updated through activity BLDA022 from case BLD08-01188.
|
Routing - PLAN CHECK | 6/19/2008 | | 6/25/2008 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2008 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2008 | | DONE |
|
|
|
|
Routing - FIRE | 6/17/2008 | 6/17/2008 | 6/19/2008 | | PASS |
Scott Arellano
|
|
|
See fire review notes.
|
1st review completed | | | 6/19/2008 | | PASS |
|
|
|
|
Route to Impact Fee Review | 6/17/2008 | 6/20/2008 | 6/17/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 6/12/2008 | | 6/17/2008 | | PASS |
Sam Zahorka
|
|
|
Pending others to pass.
|
Case Summary (BLD) | | | 6/17/2008 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 6/9/2008 | | 6/12/2008 | | PASS |
Sarah Schafer
|
|
|
CUP08-00073 Josh Johnson
Approver per DRH08-00152 Sarah Schafer
|
Routing - Erosion and Sediment | 6/6/2008 | | 6/9/2008 | | PASS |
Clint A Smith
|
|
|
ESC08-00480. ESC plan waiver approved with attached conditions.
|
Routing PW Sewer Rating | 6/6/2008 | | 6/6/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 6/6/2008 | | 6/6/2008 | | PASS |
Beverly Hall
|
|
|
|
Application received | | 5/29/2008 | 5/29/2008 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/29/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/29/2008 | | DONE |
Barbara Stitt
|
|
|
|