Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01196
StatusFinaled
Name HIGHMARK CONSTRUCTION
Site Address 2032 S CRYSTAL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(7-10-2008 permit is modified to reflect the change of roof trusses to extend to allow for a 121s.f.covered patio. added value for project is to be$1815.00 7-10-2008 pep) " 6/24/08 THIS PROJECT IS MODIFIED TO ALLOW FOR THE USE OF A SLAB ON GRADE T YPE FLOOR FOR THIS REMODEL ADDITION AS SUBJECT TO CONTRACTOR AND OWNER APPROVALS. 6/24/2008 PEPThis project is for the addition of 870s.f. to an existing 1532s.f. 1-story single family dwelling. The addition will be a 210s.f. of bathroom addition to create a new master suite and 660 s.f. of family room area on the other side of the dwelling behind the 528s.f. attached 2-car garage. R-1C ok per Colleen Carroll. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked; Energy option sheet and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/200812/29/200812/29/2008PPASS
DetailsJim Storey
Roddy- call prior to going for access Phone #: ###-####
DOC - Permit Finaled12/29/200812/29/200812/29/2008PPASS
DetailsJim Storey
BLD-Final12/18/200812/19/200812/19/2008ADEFR
DetailsJim Storey
RODDY NOTE: PLEASE CALL 15 MIN PRIOR TO INSPECTION TO GET IN Phone #: ###-#### mech insp disp. nh?
BLD-Final12/18/200812/18/200812/18/2008PDEFR
DetailsJim Storey
RODDY NOTE: PLEASE CALL 15 MIN PRIOR TO INSPECTION TO GET IN Phone #: ###-#### pending mech.
Telephone call  12/12/2008 DONE
talked to highmark const at ###-#### plans are paid for & inspections have been set up but the plans are still here???talked to jim storey & said to put them on his desk.
BLD-Final12/10/200812/11/200812/11/2008ANR
DetailsJim Storey
roddy - please call 15 minutes prior Phone #: ###-#### need hvac final.
Telephone call  10/8/2008 DONE
left message with highmark const & jason at ###-#### that plans are here & paid for but not picked up...
BLD-Energy code compliance8/22/20088/25/20088/25/2008APASS
DetailsJim Storey
Roddy Phone #: ###-####
BLD-Framing/Rough-in8/20/20088/21/20088/21/2008APASS
DetailsJim Storey
Roddy Phone #: ###-####
Telephone call  8/1/2008  
talked to highmark const to verify plans are still here & have been paid for--will pickup next monday
BLD-Framing/Rough-in7/10/20087/11/20087/11/2008ANR
DetailsJim Storey
Tom Phone #: ###-####
BLD-Foundation7/11/20087/11/20087/11/2008APASS
DetailsJim Storey
Tom Phone #: ###-####
Routing Walk-In (BLD)7/10/20087/10/20087/10/2008PPASS
DetailsPerry Paine
Case Summary (BLD)  7/10/2008  
Inspection Record Card- Bld  7/10/2008  
BLD-Footing7/8/20087/9/20087/9/2008APASS
DetailsJim Storey
Tom Phone #: ###-####
Routing Walk-In (BLD)6/24/20086/24/20086/24/2008ADONE
DetailsTisha Gallop
6/24/2008 09:13:43 LEG - activity updated through activity BLDC405 from case BLD08-01196.
Case Summary (BLD)  6/24/2008  
Inspection Record Card- Bld  6/24/2008  
Plan Reviewer's activity  6/24/2008 DONE
Modified the permit to reflect the approval for a monolythic or slab oon grade floor for this addition. pep 6-24-2008
Issue PAID IN FULL permit  6/24/2008 DONE
DetailsTisha Gallop
Routing Walk-In (Zoning)5/30/20085/30/20085/30/2008APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)5/30/20085/30/20085/30/2008ADONE
DetailsPerry Paine
5/30/2008 09:30:41 PEP - activity updated through activity BLDA022 from case BLD08-01196.
Case Summary (BLD)  5/30/2008  
Inspection Record Card- Bld  5/30/2008  
PLANS/APPL TAKEN TO FRONT DESK  5/30/2008 DONE
Permit Ready to Issue  5/30/2008 DONE
DetailsTisha Gallop
Application received 5/30/2008