Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-01203
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3159 E HEARTLEAF CT
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new two story single family dwelling with an attached garage. The main floor is 2234 square feet with four bedrooms including the master bedroom and three bathrooms. The attached garage is 2076 square feet. The second contains 1168 square feet of finished area with one bedroom and one bath as well as 565 square feet of unfinished area. The covered back patio is 320 square feet and the covered front porch is 432 square feet. R-1C zoning district and building setbacks per Planning and Zoning. THE PERMIT HOLDER is responsible to comply with section R602.10 for wall bracing or build to an engineered design. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. No fire sprinklers required per Mark Senteno with Fire. Built per all approved plans, red lining, plan review report and engineering. Engineering for foundation is attached to the approved plans. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/4/200811/4/200811/4/2008APASS
DetailsJim Storey
esc ok to final bld per sweb
DOC - Permit Finaled11/4/200811/4/200811/4/2008PPASS
DetailsJim Storey
BLD-Final10/29/200810/30/200810/30/2008APASS
DetailsJim Storey
bryan Phone #: ###-#### pending landscaping to meet esc permit.
BLD-Energy code compliance9/9/20089/10/20089/10/2008APASS
DetailsTony Young
brian Phone #: ###-####
BLD-Framing/Rough-in9/5/20089/8/20089/8/2008APASS
DetailsJim Storey
bryan Phone #: ###-####
BLD-Foundation7/14/20087/15/20087/15/2008PPASS
DetailsJim Storey
Eric Phone #: ###-####
BLD-Footing7/10/20087/11/20087/11/2008PPASS
DetailsJim Storey
bryan - after 3:00 please Phone #: ###-####
Issue PAID IN FULL permit  7/10/2008 DONE
DetailsTisha Gallop
Plan assigned to (BSP)6/11/20086/11/20087/8/2008 PASS
DetailsBen S. Pavelka
7/8/2008 09:07:51 BSP - activity updated through activity BLDA022 from case BLD08-01203.
Routing - PLAN CHECK6/3/2008 7/8/2008 PASS
DetailsBen S. Pavelka
Routing - Erosion and Sediment7/7/2008 7/8/2008 PASS
DetailsClint A Smith
ESC plan approved with attached conditions. ESC08-00486
PLANS/APPL TAKEN TO FRONT DESK  7/8/2008 DONE
Inspection Record Card- Bld  7/8/2008 DONE
Details
CHANGE STATUS TO (RDY)  7/8/2008 DONE
Telephone call  7/8/2008 DONE
Called Bryan Murdock permit ready and fee given
Case Summary (BLD)  7/7/2008 DONE
Telephone call  7/3/2008 DONE
DetailsTisha Gallop
called Bryan Murdoch and notified him that per Steve Webb this property does not require a ESC plan because it is not in the hillside district. He will still have a double fee on the ESC permit for this project for starting excavation w/out getting the permit first. Furthermore, the plan reviewer Ben Pavelka said he still does need the engineering calcs for the foundation to finish his review.//7/3/08 8:23am LEG
Route to Impact Fee Review5/30/20086/4/20086/30/2008 PASS
DetailsCindy M. Gould
Telephone call  6/11/2008  
Called Bryan Murdoch to notify him of hillside ordinance requirements. Need Erosion and Sediment control plans submitted and approved by Steve Webb and engineering calculations for the foundations. (BSP)
Plans ACCEPTED BY PLAN CHECK  6/11/2008  
DetailsBen S. Pavelka
Routing - PUBLIC WORKS6/3/2008 6/3/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING Land Div6/2/2008 6/3/2008 PASS
DetailsTodd Tucker
parcel is a platted lot in a recorded subdivision.
Routing - PLANNING6/3/2008 6/3/2008 PASS
DetailsColleen T Carroll
Routing - Addressing5/30/2008 5/30/2008 PASS
DetailsChris Pichardo
Application received 5/30/2008   
DetailsTisha Gallop