Telephone call | | | 11/30/2009 | | DONE |
Tisha Gallop
|
|
|
Per phone call w/Lisa/RA Schulz & Co. bill for final value fees should be sent to Tremigo LLC, 1187 Coast Village Rd #1-949, Santa Barbara, CA, 93108
|
First Notice | | 9/2/2009 | 9/15/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/2/2009 | | DONE |
|
|
|
|
BLD-Final | 7/10/2009 | 7/10/2009 | 7/10/2009 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 7/7/2009 | 7/7/2009 | 7/10/2009 | P | PART |
Tony Young
|
|
|
Call Daryl,, conf between inspectors
|
BLD-Conference | 7/8/2009 | 7/10/2009 | 7/10/2009 | A | PASS |
Tony Young
|
|
|
check on status
|
BLD-Conference | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PEND |
Tony Young
|
|
|
call plumbing inspector,, he is waiting on specs,, need as soon as possible,, temp occ will run out
|
BLD-Final | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PART |
Mike Jordan
|
|
|
matt Phone #: ###-####. ok for temp occ. Will be ok for perm occ once plumbing finals.
|
FIRE-Final Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed
|
BLD-Other | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Tony Young
|
|
|
matt Note: ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2008 | 9/11/2008 | 9/11/2008 | P | CANC |
Mike Jordan
|
|
|
Jack Phone #: ###-####
|
BLD-Framing/Rough-in | 9/10/2008 | 9/11/2008 | 9/11/2008 | A | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/13/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/4/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 8/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2008 | | DONE |
|
|
|
Called Kyle permit ready and fee given, Also need RP before plans can be let go.
|
Plan assigned to (R_H) | 6/2/2008 | 6/2/2008 | 8/1/2008 | | PASS |
Barbara Stitt
|
|
|
8/1/2008 14:02:37 RMH - activity updated through activity BLDA022 from case BLD08-01205.
|
Routing - PLAN CHECK | 7/7/2008 | | 8/1/2008 | | PASS |
Ron Hill
|
|
|
|
Routing - PLAN CHECK | 7/29/2008 | | 8/1/2008 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 8/1/2008 | | DONE |
|
|
|
|
Routing - FIRE | | | 8/1/2008 | | PASS |
|
|
|
|
1st review completed | | | 8/1/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/1/2008 | | DONE |
|
|
|
|
Routing - MECHANICAL | 7/21/2008 | | 7/29/2008 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 7/21/2008 | | DONE |
|
|
|
received 1 transmittal, 1 response,and 3 copies of sheet M1.1 taken to Ron H.
|
Routing - PLUMBING | 7/7/2008 | | 7/7/2008 | | PASS |
Bill VanDegrift
|
|
|
per resubmitted plans dated 6/27/08 and 2003 upc, mount r.p.'s over the mop sink.
|
Plan resubmittals received | | | 6/27/2008 | | DONE |
|
|
|
received 1 transmittal, and 3 copies of sheet P1.1 taken to Ron H.
|
Routing - Erosion and Sediment | 6/6/2008 | | 6/9/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00488
|
Routing - MECHANICAL | 6/3/2008 | | 6/6/2008 | | |
Dixie Fellows
|
|
|
No mechanical plan review done
|
Routing - PUBLIC WORKS | 6/3/2008 | | 6/3/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLUMBING | 6/3/2008 | | 6/3/2008 | | FAIL |
Bill VanDegrift
|
|
|
provide information on the pedicure stations to determine cross connection control and combination waste and vent qualifactions.
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2008 | | DONE |
Darla L Downs
|
|
|
|
Application received | | 5/30/2008 | 5/30/2008 | | DONE |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/30/2008 | | DONE |
Darla L Downs
|
|
|
|
Routing - PLAN CHECK | 6/10/2008 | | | | |
Ron Hill
|
|
|
|
Routing - MECHANICAL | 6/23/2008 | | | | FAIL |
Troy James
|
|
|
Please revise plans to show the exhaust system to each nail work station.
Please show on plans, exhaust to exterior per chapter 5 IMC, for product conveying exhaust systems termination requirements.
Please show on plans ventilation calculations and make up air design.
Provide section view on plans of exhaust sytem deisgn at nail stations.
Show on plans separate ventilation requirements per Table 403.3 for outside air design of 25 cfm per person.
|
Routing - PLAN CHECK | 6/27/2008 | | | | |
Ron Hill
|
|
|
|