Permit Information
Permit NumberBLD08-01210
StatusFinaled
Name ESI
Site Address 1072 N LIBERTY ST
Project NameST ALPHONSUS-MOB #7
Customer Number 
ePlanReviewNo
Description
St. Alphonsus - MOB VII shell & core building - To construct a new 70,705 square foot, three story, steel frame and concrete medical office shell and core building related site improvements. The core areas include stair enclosures, elevators, mechanical and electrical rooms and entry lobby. This building is fully fire sprinkled. The sprinklers are used for area increase. Any I-2 Occupancies would be limited to the first floor and must be separated from the remainder of the building by minimum one-hour fire-barriers. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/22/2010  
Third Notice 9/15/200910/2/2009 DONE
Telephone call  10/2/2009 DONE
DetailsTisha Gallop
called and spoke with Janae to verify she broke out Debest value into two seperate plm and mech. She said values were correct and were evaluated by the work done for the trade reguardless of contractor, so submitted final values still stand.
Third Notice 9/4/20099/15/2009 DONE
Telephone call  9/15/2009 DONE
DetailsTisha Gallop
called and left voice message for Janae w/ESI need final values
Third Notice 8/5/20099/4/2009 DONE
Second Notice 7/22/20098/5/2009 DONE
First Notice5/29/20095/29/20097/22/2009 DONE
DetailsTom Arcoraci
BLD-Final5/28/20095/29/20095/29/2009PPASS
DetailsTom Arcoraci
DOC - Permit Finaled5/29/20095/29/20095/29/2009PPASS
DetailsTom Arcoraci
BLD-Final5/28/20095/29/20095/29/2009APART
DetailsTom Arcoraci
Adam Phone #: ###-####
FIRE-Final Inspection5/28/20095/29/20095/29/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection5/26/20095/26/20095/26/2009PPART
DetailsTroy Cobbley
A temporary occupancy is being given until 5/29/2009 with Jason Blaise, Mark Sentenno and Scott Areleno's permission. The Area of Refuge equipment needs to be installed and tested. The address has been changed from a Hartman street address to Liberty Street.
BLD-Final5/22/20095/26/20095/26/2009APART
DetailsJim Storey
adam - late morning please Phone #: ###-#### temp l/c isued. pending equment instal verifaction in area of refuse.
Plan resubmittals received  5/26/2009 DONE
received transmittal letter,1 roof exit sign,1 roof lighting plan taken to John M.
FIRE-Final Inspection5/21/20095/21/20095/21/2009PFAIL
DetailsTroy Cobbley
Provide a letter from plan review stating that the exit sign on the roof can be deleted. Provide and test all items pertaining to the Area of Refuge. Provide testing of the elevator and fire alarm interconnections. The building address does not match the address the central station give to the boise fire dept. This will have to have approval.
BLD-Conference5/21/20095/21/20095/21/2009PPASS
DetailsTom Arcoraci
needs com and sign at area of refuge
FIRE-Final Inspection5/19/20095/20/20095/20/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need to be finaled. Also the Area of Refuge items as listed on the fire and building review comments have not been addressed. One exit sign needs to be added on the roof stair entrance.
BLD-Conference5/19/20095/19/20095/19/2009PPASS
DetailsTom Arcoraci
PubWorks Occupancy Approval5/19/20095/19/20095/19/2009 DONE
DetailsTiffany Lowery
Zoning Approval5/18/20095/18/20095/18/2009 PASS
DetailsJosh Wilson
BLD-Conference5/15/20095/15/20095/15/2009PPASS
DetailsTom Arcoraci
BLD-Conference5/13/20095/13/20095/13/2009PPASS
DetailsTom Arcoraci
BLD-Conference5/12/20095/13/20095/13/2009APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/7/20095/7/20095/7/2009PPASS
DetailsTom Arcoraci
Ceiling inspection please-- Dale Phone #: ###-####
BLD-Other5/6/20095/7/20095/7/2009APASS
DetailsTom Arcoraci
BLD-Other5/6/20095/6/20095/6/2009PCANC
DetailsTom Arcoraci
BLD-Conference5/5/20095/6/20095/6/2009APASS
DetailsTom Arcoraci
BLD-Conference5/5/20095/5/20095/5/2009PPASS
DetailsTom Arcoraci
FIRE-Final Inspection4/28/20094/29/20094/29/2009AFAIL
DetailsTroy Cobbley
This was actually a conference for the placement of the exterior electric alarm bell. Per mark sentenno the bell can be placed on the glass wall above the fdc or 15'-0" to the west, above the glass panels, in the rock wall.
BLD-Conference4/28/20094/29/20094/29/2009PPASS
DetailsTom Arcoraci
BLD-Conference4/27/20094/29/20094/28/2009ACANC
DetailsTom Arcoraci
BLD-Conference4/24/20094/24/20094/24/2009PPASS
DetailsTom Arcoraci
BLD-Conference4/23/20094/23/20094/24/2009PPASS
DetailsTom Arcoraci
FIRE-Conference4/2/20094/2/20094/2/2009PDONE
DetailsTroy Cobbley
Dale and I went over fire extinguisher placement and placement of the knox key box.
BLD-Framing/Rough-in3/23/20093/24/20093/24/2009APASS
DetailsTom Arcoraci
Dale Phone #: ###-#### wip ok
BLD-Framing/Rough-in3/6/20093/9/20093/10/2009PPASS
DetailsTom Arcoraci
adam - ceiling grid Phone #: ###-####
BLD-Wall cover3/3/20093/3/20093/3/2009PPART
DetailsTom Arcoraci
BLD-Other2/5/20092/5/20092/5/2009PPASS
DetailsTom Arcoraci
BLD-Other1/26/20091/26/20091/26/2009PPASS
DetailsTom Arcoraci
dale-fire stop inspection Phone #: ###-#### wip ok
BLD-Other1/20/20091/21/20091/21/2009APASS
DetailsTom Arcoraci
dale - fire stop Phone #: ###-####
BLD-Framing/Rough-in1/16/20091/16/20091/16/2009PPART
DetailsTom Arcoraci
dale - partial wall Phone #: ###-####
BLD-Framing/Rough-in1/7/20091/7/20091/7/2009PPASS
DetailsTom Arcoraci
dale Phone #: ###-#### wip ok
BLD-Framing/Rough-in12/16/200812/16/200812/16/2008PNR
DetailsTom Arcoraci
dale wip ok
BLD-Framing/Rough-in12/12/200812/16/200812/16/2008ACANC
DetailsTom Arcoraci
BLD-Framing/Rough-in12/12/200812/12/200812/12/2008PPART
DetailsTom Arcoraci
dale Phone #: ###-#### wip ok
BLD-Conference12/8/200812/11/200812/11/2008APASS
DetailsTom Arcoraci
BLD-Framing/Rough-in12/8/200812/8/200812/8/2008PPART
DetailsTom Arcoraci
dale Phone #: ###-#### par ok wip
BLD-Footing11/4/200811/5/200811/5/2008APASS
DetailsMike Jordan
Dale Phone #: ###-####. #rd floor slab on deck, south half ok. Special insp. has approved also.
BLD-Other10/17/200810/20/200810/20/2008APASS
DetailsJim Storey
dale Note: 1st in morning for structural steel concrete Phone #: ###-#### third floor deck ok 2/3 north to center of deck ok to place concrete. si signed off.
BLD-Concrete9/25/20089/26/20089/26/2008APART
DetailsJim Sly
Ken Phone #: ###-#### - pouring at 12:30
Grade Beams At North and West walls OK pending MTI special insp, tests and approvals.
BLD-Foundation9/22/20089/23/20089/23/2008APART
DetailsMike Jordan
DALE Phone #: ###-####. INterior and exterior column pad footings on grids 4 and 5. Will have special insp.
BLD-Foundation9/18/20089/19/20089/19/2008APART
DetailsMike Jordan
gale - 10:00 pouring concrete Phone #: ###-####
Routing - PLUMBING9/18/2008 9/18/2008 PASS
DetailsBill VanDegrift
resubmittals for the reuse water system approved, will send one copy to job with Jim J. and one copy to be attached to plans in the office.
Plan resubmittals received  9/17/2008 DONE
received 2 copies of reclaimed water piping, and 3 copies of plumbing and mechanical sheets P7.3,M0.1,M7.1,M7.2,P0.1 for Bill Vandegrift to review, these plans were issued on 7-31-08 taken to plumbing box .
BLD-Foundation9/16/20089/16/20089/16/2008APASS
DetailsJim Storey
Dale Phone #: ###-#### 3dr floor at stair towers ok mti on site ok
BLD-Footing9/9/20089/10/20089/10/2008APART
DetailsJim Sly
dale Phone #: ###-####
North stair tower 2nd floor walls OK pending MTI special insp. tests and approvals.
BLD-Foundation9/3/20089/4/20089/4/2008APART
DetailsJim Sly
dale Phone #: ###-####
Grade beams at East and South wall appear OK........Pending MTI special inspection, tests and approvals.
BLD-Foundation8/29/20088/29/20088/29/2008APART
DetailsMike Jordan
dale- ###-####. INterior column pad footings.
BLD-Footing8/22/20088/25/20088/25/2008APASS
DetailsMike Jordan
dale Phone #: ###-####. Mat footing for north stair tower and mech. room. Also reveiwed all special insp. reports to date.
BLD-Footing8/19/20088/20/20088/20/2008PPART
DetailsMike Jordan
Dale Phone #: ###-####. Column pad footings for grade beams at gridline 1 and h.
BLD-Footing8/18/20088/19/20088/19/2008APART
DetailsJim Storey
Dale- late morning if possible Phone #: ###-#### placed w si
BLD-Foundation8/12/20088/13/20088/13/2008APART
DetailsMike Jordan
dale - after 10:00 please Phone #: ###-####. MAt footing for elevator and stair tower. wip on bottom mat. All soils have been tested and evaluated by MTI (special insp) will also have specail insp on all aspects of const.
Routing - PLAN CHECK7/29/2008 7/31/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  7/31/2008 PASS
DetailsJohn Menard
Reviewed and approved revised plans with attached comment list. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/31/2008 DONE
DetailsJohn Menard
Inspection Record Card- Bld  7/31/2008 DONE
Details
Issue PAID IN FULL permit  7/31/2008 DONE
Plan assigned to (JCM)6/3/2008 7/31/2008 PASS
DetailsJohn Menard
7/31/2008 11:35:58 JCM - activity updated through activity BLDA022 from case BLD08-01210.
Route to Impact Fee Review7/29/20088/1/20087/29/2008 PASS
DetailsCindy M. Gould
Routing - FIRE7/28/2008 7/29/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK7/22/2008 7/28/2008  
Resubmittals sent to Fire for review.
Plan resubmittals received  7/28/2008  
DetailsTisha Gallop
Received response letter to Structural review, response letter to Fire review, two copies of sheets G2.0, G3.0, A2.1, A4.2, A6.1, A7.1, A7.2, A9.1, A10.1, A10.3, E3.1, E3.2, E3.3, P2.1, P3.1; inserted by arch. rep. and taken back to John Menard
Routing - FIRE7/21/20087/21/20087/22/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  7/22/2008 FAIL
Failed PW, Structural, Plumbing, Planning, Plan Check, Fire
Routing - PLAN CHECK7/16/2008 7/21/2008 FAIL
DetailsJohn Menard
Plan Reviewer's activity  7/21/2008 PASS
Reviewed and approved structural revisions. JCM
Plan resubmittals requested  7/21/2008 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLUMBING7/15/2008 7/16/2008 PASS
DetailsBill VanDegrift
the reclaimed water piping system for this project is for future use, it will extend from outside the building to the penthouse and be capped on both ends. all provisions of appendix J shall apply.
additional cross connection protection may be required at equipment connections. this review is for the building only- site utilities will need to be resubmitted for approval.
Plan resubmittals received  7/15/2008 DONE
received from CSHQA and inserted by Darla 2 copies of sheets P0.1,P2.1,P2.2,P2.3,P2.4,P3.1,P3.2,P3.3,P3.4,
1 transmittal and 3 copies of sheet C1.5 Plans taken back to plumbing 0k by John M as this was requested they be sent to plumbing /// DLD
Routing - PUBLIC WORKS7/14/2008 7/15/2008 PASS
DetailsBeverly Hall
Routing PW Drainage7/15/2008 7/15/2008 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/8/2008 7/14/2008 PASS
DetailsJohn Menard
Plan resubmittals received  7/14/2008  
received "3" sets of plans with each sheet of SO.1, S2.1, S2.2, S2.3, S4.1, S4.2, S4.3, S5.1 & "3' sets of structural calcs, & 2 pages letter from cshqa--plans inserter is yoni melchert
Routing - PLAN CHECK6/19/2008 7/14/2008  
DetailsJohn Menard
John Menard
Routing - PLUMBING7/3/2008 7/8/2008 FAIL
DetailsBill VanDegrift
provide an approved plan of the on site sewage disposal field, approved by CDHD. show detail of the potable water service under the sewage disposal field. The civil plans resubmitted 6/19/08 deleted the interceptor on the oil waste system, has the oil system been deleted? if so resubmit P sheets. provide information on the plans stating how the gray water system inside the building is to be identified for future connections.
Plan resubmittals received  6/19/2008  
DetailsBarbara Stitt
Received 2 Storm Water calcs and 2 o & m Manuals, 2 copies of sheet C1.5 and insterted into plans by Jeff Ward///6-19-08 @ 10:20am BAS
Routing - PLANNING6/18/2008 6/19/2008 PASS
DetailsMatthew A Halitsky
DRH07-00596 Matt Halitsky

Route to Plan Check (John Menard)
Plan resubmittals requested  6/18/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLUMBING6/12/2008 6/17/2008 FAIL
DetailsBill VanDegrift
gray water systems are prohibited with the exception of single family dwellings. all nonpotable water lines must be marked and the hose bibs posted.
Routing Off Site - STRUCTURAL6/3/2008 6/16/2008 FAIL
DetailsJohn Menard
Received structural comment list requesting revisions. JCM
Routing PW Solid Waste6/12/2008 6/12/2008 PASS
DetailsPeter J. McCullough
Pass with the condition that trash enclosure gates open 120 degrees minimum. Noted on plans.
Routing PW Sewer Rating  6/12/2008 PASS
DetailsLouise Waldorf
Routing - Erosion and Sediment6/12/2008 6/12/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00490
Routing - PUBLIC WORKS  6/12/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage6/3/2008 6/11/2008 FAIL
DetailsBrian Murphy
NEED ENGINEERS LETTER ON STRUCTURAL FOR SEEPAGE BED. MONITORING WELL ON PLAN..O AND M REVSION. BRIAN MURPHY ###-####
Routing PW Street Lights  6/11/2008 PASS
DetailsBill Colson
Telephone call  6/3/2008 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Pending Assignment by JCM6/2/2008 6/3/2008 DONE
DetailsJohn Menard
6/3/2008 08:31:41 JCM - activity updated through activity BLDA166 from case BLD08-01210.
Routing - PLANNING Land Div6/3/2008 6/3/2008 PASS
DetailsJoan Johnson
parcel greater than 5 acres
Plans ACCEPTED BY PLAN TECH  6/2/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/2/2008 DONE
DetailsTisha Gallop
Application received 6/2/2008   
DetailsTisha Gallop