Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-01253
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 651 E GOWEN RD
Project NameGowen Warehouse
Customer Number 
ePlanReviewNo
Description
Gowen Warehouse (Shell) - To construct a new 163,500 square foot, one story concrete tilt-up warehouse shell buildng and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. Grading and drainage approved under BLD08-01177 with ESC08-00474. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20092/9/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice12/5/200812/5/20081/2/2009 DONE
DetailsJim Storey
BLD-Final12/5/200812/5/200812/5/2008APASS
DetailsJim Storey
DOC - Permit Finaled12/5/200812/5/200812/5/2008PPASS
DetailsJim Storey
Letter of compliance  12/5/2008  
FIRE-Final Inspection12/4/200812/4/200812/4/2008APASS
DetailsForrest France
Corrections field verified for completion, fire life safety passed.
Zoning Approval12/3/200812/3/200812/3/2008 PASS
DetailsAndrea Tuning
The rock mulch within the planters has been approved this one time, per Hal Simmons. 12-3-08.
FIRE-Final Inspection11/26/200811/28/200811/28/2008APART
DetailsForrest France
Fire life safety inspection completed satisfactory with the exception of automatic smoke/heat vents installed throughout which do not meet exception criteria per IFC in conjunction with ESFR sprinkler systems.
BLD-Final11/26/200811/26/200811/26/2008PNR
DetailsMike Jordan
jim Phone #: ###-####
Zoning Approval11/25/200811/25/200811/25/2008 FAIL
DetailsAndrea Tuning
The parkign is not striped properly, there is additional parkign that was added (bu tnot approved) and the applicant utilized a rock mulch as opposed to a bark mulch which was noted on the approved plans and the as a Conditional of Approval.
BLD-Other8/29/20089/2/20089/2/2008PPASS
DetailsJim Storey
Jim- rebar Phone #: ###-#### si on site
Plan Reviewer's activity  9/1/2008 DONE
DetailsJohn Menard
Dur-Red Double Door Domed Smoke Hatch information approved. Allowable 20 psf load approved with acrylic domes. JCM
BLD-Footing8/28/20088/28/20088/28/2008PPASS
DetailsJim Storey
jim Phone #: ###-#### ft and pannels east end.
BLD-Other8/26/20088/27/20088/27/2008PPASS
DetailsJim Storey
jim - rebar for tilt wall Phone #: ###-#### north east wall pannels rebar ok pending si concrete reports.
BLD-Footing8/25/20088/26/20088/26/2008APASS
DetailsJim Storey
Jim Phone #: ###-####
BLD-Footing8/25/20088/25/20088/25/2008PPASS
DetailsJim Storey
Jim Phone #: ###-#### si pending report.
BLD-Footing8/21/20088/22/20088/22/2008APASS
DetailsJim Storey
jim - late morning please Phone #: ###-####
BLD-Footing8/19/20088/19/20088/19/2008PPASS
DetailsJim Storey
jim Phone #: ###-#### sw ft ok
BLD-Footing8/15/20088/18/20088/18/2008APASS
DetailsJim Storey
Jim Phone #: ###-#### west wall panels rebar ok.
BLD-Footing8/14/20088/14/20088/14/2008PPASS
DetailsJim Storey
jim - re-bar Phone #: ###-#### ft southeast 400 ln ft rebar ok need rfi for sewer pipe thru ft from engineer.
BLD-Other8/11/20088/12/20088/12/2008APASS
DetailsJim Storey
jim Note: rebar Phone #: ###-#### south side tilt pannels rebar ok/ si report will verify three #6 bar missed before placment of concrete.
BLD-Footing7/29/20087/29/20087/29/2008PPART
DetailsJim Storey
jim Phone #: ###-#### ne pad ft si on site rebar ok.
BLD-Footing7/28/20087/28/20087/28/2008PPART
DetailsJim Storey
jim Note: pour around 1:00 pm Phone #: ###-#### placed with si.
BLD-Footing7/23/20087/24/20087/24/2008APASS
DetailsJim Storey
jim - rebar Phone #: ###-#### east/north pad ft rebar ok pending si report
BLD-Footing7/21/20087/22/20087/22/2008APART
DetailsJim Storey
Ron Phone #: ###-#### pad ft interior east end ok pending si reports.
Issue PAID IN FULL permit  7/21/2008 DONE
Inspection Record Card- Bld  7/18/2008 DONE
Details
Telephone call  7/18/2008 DONE
Details
left vm for gayle jensen at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  7/18/2008 DONE
Details
Routing - PLAN CHECK7/17/2008 7/17/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  7/17/2008 PASS
Reviewed and approved structural and nonstructural plan revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/17/2008 DONE
Routing - PUBLIC WORKS7/16/2008 7/17/2008 PASS
DetailsBeverly Hall
Plan assigned to (JCM)6/6/2008 7/17/2008 PASS
DetailsJohn Menard
7/17/2008 14:59:24 JCM - activity updated through activity BLDA022 from case BLD08-01253.
Routing - Erosion and Sediment6/10/2008 7/16/2008 PASS
DetailsSteven Webb
No ESC application, plan or narrative provided for review. - ESC Permit issued with grading and drainage permit BLD08-01177. ESC Permit - ESC08-00474. JCM
Routing PW Drainage7/16/2008 7/16/2008 PASS
DetailsBrian Murphy
Grading and drainage approved under separate permit BLD08-01177. JCM
Routing - PLUMBING7/14/2008 7/16/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLANNING7/16/2008 7/16/2008 PASS
DetailsAndrea Tuning
Approved per DRH08-00179
Routing - PLAN CHECK7/11/2008 7/14/2008  
DetailsJohn Menard
Routing - FIRE7/9/2008 7/11/2008 PASS
DetailsKenneth R Roule
Attached IFC comments to plans
Routing - PLAN CHECK6/17/2008 7/9/2008 PEND
DetailsJohn Menard
Received resubmittals. Plans routed for review of resubmittals.
Plan resubmittals received  7/8/2008  
DetailsJohn Menard
Received three copies of response letter to building department, response letter to fire department, letter from skylight supplier, skylight detail, response to structural plan review comments, structural calculations, sheets A-1, L-1, P-1, P-3; inserted by owner rep. and taken back to John Menard
Plan resubmittals requested  6/20/2008 DONE
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL6/6/2008 6/18/2008 FAIL
DetailsJohn Menard
Routing - FIRE6/13/20086/13/20086/17/2008 FAIL
DetailsKenneth R Roule
Faxed copy of fire plan review to architect.
1st review completed  6/17/2008  
Failed erosion, pw, planning, plumbing, plan check and pw drainage.
Route to Impact Fee Review6/13/20086/18/20086/16/2008 PASS
DetailsCindy M. Gould
Plan resubmittals requested  6/13/2008 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK6/12/2008 6/13/2008 FAIL
DetailsJohn Menard
John Menard
Routing - PLANNING6/12/2008 6/12/2008 FAIL
DetailsAndrea Tuning
Failed the conditions of DRH08-00179 - Andrea

Still waiting for a revised landscape plan.
Routing - PLUMBING6/11/2008 6/12/2008 FAIL
DetailsBill VanDegrift
RD-1 and OD-1 are undersized. provide min. 4" drain bodies. resubmit fixture schedule. divert OD-1 discharge from draining onto stairways.
Routing - PUBLIC WORKS6/9/2008 6/10/2008 FAIL
DetailsLouise Waldorf
Routing PW Sewer Design6/9/2008 6/10/2008 PASS
DetailsJon R. Gunnerson
SEWER TAP PERMIT REQUIRED, Connect onto 2-inch force main, coordinate with Public Works Utility Maint.
Routing PW Drainage  6/10/2008 FAIL
DetailsBrian Murphy
SEE GRADING PLAN REVIEW BRIAN MURPHY ###-####
Routing PW Sewer Rating6/9/2008 6/9/2008 PASS
DetailsLouise Waldorf
Routing PW Solid Waste6/9/2008 6/9/2008 PASS
DetailsPeter J. McCullough
Routing - PLANNING Land Div6/6/2008 6/9/2008 PASS
DetailsJoan Johnson
Pending Assignment by MYS6/6/2008 6/6/2008 DONE
DetailsJohn Menard
6/6/2008 08:56:37 JCM - activity updated through activity BLDA166 from case BLD08-01253.
Plans ACCEPTED BY PLAN TECH  6/6/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/6/2008 DONE
DetailsTisha Gallop
Telephone call  6/6/2008 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Application received 6/6/2008   
DetailsTisha Gallop