Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-01272
StatusFinaled
Name SILVER LEAF CONSTRUCTION
Site Address 7960 W NORTHVIEW ST
Project NameST. MARKS CATHOLIC CHURCH
Customer Number 
ePlanReviewNo
Description
(**ST. MARKS CATHOLIC CHURCH) To remodel a 26,050 square foot single story sanctuary building. Work to include: [Construction of interior non-bearing partition walls to expand existing waiting room by 85 square feet] reuse existing door in specified location, relocate light fixture, install new counter including an accessible counter per section 904 of the ICC/Ansi 117.1-2003, and installation of interior finishes in compliance with chapter 8 of the 2006 IBC. This building is sprinklered for area increase any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be maintained as regulated by the fire department in accordance with NFPA 13 standards. The existing one-hour corridor required under the 1997 UBC is no longer required per table 1017.1 of the 2006 IBC.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/200810/23/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice7/10/20087/10/20088/11/2008 DONE
DetailsJim Sly
BLD-Final7/9/20087/10/20087/10/2008PPASS
DetailsJim Sly
Jim- Phone #: ###-####
C/C issued
DOC - Permit Finaled7/10/20087/10/20087/10/2008PPASS
DetailsJim Sly
FIRE-Final Inspection7/9/20087/10/20087/10/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Final7/8/20087/9/20087/9/2008PNR
DetailsJim Sly
Would like a final inspection conducted after lunch. Electrical final is scheduled for AM. Contact Jim Silsby (###-####) who should be on site. Thanks. Phone #: ###-####
Internet Inspection Request from: Jim Silsby
Need Fire final
BLD-Framing/Rough-in6/25/20086/26/20086/26/2008APART
DetailsJim Sly
Request after 10am because electrical is also scheduled this am btwn 8-10 //contact is Jim Silsby Phone #: ###-#### Internet Inspection Request from: Jim Silsby
Frame OK....waiting for approval from Engineer for steel I beam retro...... will provide paperwork at ceiling insp.
Issue PAID IN FULL permit  6/25/2008 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  6/16/2008 DONE
Details
CHANGE STATUS TO (RDY)  6/16/2008 DONE
Telephone call  6/16/2008 DONE
Called Joe permit ready and fee given Also Need GC number
Plan assigned to (TLW)6/11/2008 6/13/2008 PASS
DetailsTim L. Woodard
6/13/2008 16:23:48 TLW - activity updated through activity BLDA022 from case BLD08-01272.
Routing - PLAN CHECK6/11/2008 6/13/2008 PASS
DetailsTim L. Woodard
Per Case summary.
Routing - FIRE  6/13/2008 PASS
DetailsTim L. Woodard
Corridor not required to be rated/FIR03-00206 was pulled identifying the use of quick responce sprinkler heads.
1st review completed  6/13/2008 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/13/2008 DONE
Case Summary (BLD)  6/13/2008 DONE
Plans ACCEPTED BY PLAN TECH  6/10/2008  
Recd Pcfee & Taken To Pln CK  6/9/2008  
Application received 6/9/2008