Third Notice | | 8/5/2009 | 9/15/2009 | | DONE |
Tisha Gallop
|
|
|
being processed by DLD
|
Second Notice | | 7/24/2009 | 8/5/2009 | | DONE |
|
|
|
|
First Notice | | 4/23/2009 | 7/24/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/23/2009 | | DONE |
|
|
|
|
Zoning Approval | 4/7/2009 | 4/7/2009 | 4/7/2009 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/13/2009 at 7:47:23 AM. Contact: ###-####. ok for perm when others are perm
|
Temporary Occupancy | 3/13/2009 | 6/11/2009 | 3/13/2009 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 3/10/2009 | 3/10/2009 | 3/13/2009 | | DONE |
Andrea Tuning
|
|
|
The applicant has not completed the landscaping, has added a concrete walkway on the west side of the building, has added two second story windows on the south elevation and eliminated on parking space from the site.
The applicant has provided a $5,000 bond to cover the modifications that would be needed to obtain a building that matches the approved building. With the bond, staff has allowed the applicant to have temporary occupancy for the next 90 days. This will allow the applicant time to modify the site and the building to match the approved drawings or obtain a modification to teh DR application (DRH07-00486 and DRH08-00147). ANT
|
FIRE-Final Inspection | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/12/2009 at 9:36:06 AM. Contact: ###-####. needs hand rails
|
PubWorks Occupancy Approval | 3/13/2009 | 3/13/2009 | 3/11/2009 | | DONE |
|
|
|
|
BLD-Other | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
Blake- ceiling Phone #: ###-####
|
FIRE-Final Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | FAIL |
Troy Cobbley
|
|
|
Mount the fire extinguisher on the lower level as discussed and tag both extinguishers. Provide approved single action hardware on the secondary (west) exit door. Per April in addressing the 6205 address will suffice.
|
BLD-Other | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | NR |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 2/18/2009 | 2/19/2009 | 2/19/2009 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/18/2009 at 3:27:35 PM. Contact: ###-####. needs elec
|
BLD-Aging Inspection | 2/2/2009 | 2/2/2009 | 2/2/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/2/2008 at 4:05:02 PM. Contact: ###-####.
|
BLD-Other | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/1/2008 at 10:16:53 AM. Contact: ###-####.
|
BLD-Conference | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/14/2008 at 9:59:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/5/2008 | 11/6/2008 | 11/6/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/5/2008 at 1:42:03 PM. Contact: ###-####. ok to insulate floor with no plumb or elec
|
BLD-Framing/Rough-in | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 1:21:46 PM. Contact: ###-####. Nailing for roof sheating only.
|
BLD-Conference | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | DONE |
Mike Jordan
|
|
|
Issue with north wall on vertical exit enclosure. Wood penetration into 1hr wall. Noted to contractor to have architect draw new detail for repair and submit to plan review for approval.
|
BLD-Footing | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PART |
Mike Jordan
|
|
|
blake - rebar Phone #: ###-####. Stemwalls. Special insp. on site.
|
BLD-Foundation | 9/25/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Mike Jordan
|
|
|
blake note:rebar Phone #: ###-####. Perimeter footings. Special insp. on site.
|
Override - People Holds | | | 9/23/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/23/2008 | | |
|
|
|
|
OVERRIDE | | | 9/22/2008 | | |
|
|
|
|
OVERRIDE | | | 9/22/2008 | | |
|
|
|
|
Print Occupancy Form | | | 9/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/22/2008 | | DONE |
|
|
|
left vm for james murray at ###-#### - permit ready and fees given - also need ACHD receipt
|
Override - People Holds | | | 9/22/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 9/22/2008 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/19/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a letter requesting additional structural revisions. JCM
|
Plan resubmittals received | | | 9/19/2008 | | DONE |
|
|
|
Received 1 response, 2 structural calcs, and 2 copies if sheet s2.1 inserted by Nate from CSHQA and plans returned to John M.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2008 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/12/2008 | | 9/19/2008 | | PASS |
John Menard
|
|
|
|
Plan assigned to (JCM) | 6/10/2008 | | 9/19/2008 | | PASS |
John Menard
|
|
|
9/19/2008 16:27:06 JCM - activity updated through activity BLDA022 from case BLD08-01275.
|
Plan resubmittals received | | | 9/12/2008 | | |
Barbara Stitt
|
|
|
Received 1 response letter dated 9-12-08 to John Menard from James Murray, and 2 copies of the following sheets-A2.1, A2.3, A10.1, S2.1, M0.2, M2.1, M4.1, M5.1, P2.1, P2.2, E1.0, E2.0 and inserted into plans then returned to John's desk///9-12-08 BAS
|
Routing PW Drainage | 9/12/2008 | | 9/12/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2008 | | 9/12/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan resubmittals requested | | | 9/5/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of a letter requesting additional revisions. JCM
|
Routing - PLAN CHECK | 9/2/2008 | | 9/5/2008 | | FAIL |
John Menard
|
|
|
|
Routing - MECHANICAL | 8/25/2008 | | 9/2/2008 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 8/28/2008 | | |
|
|
|
received letter of response from cshqa & "3" sets of structural calcs.(10 pages each) & "3" sets of plans with each sheet A2.1, A2.3, A6.1, A10.1, S1.1, S2.1, S3.1, M2.1, P2.1, & P2.2, --took plans to plumbing box & e-mailed troy james
|
Routing - PLUMBING | 8/20/2008 | | 8/25/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 8/19/2008 | | 8/22/2008 | | PASS |
John Menard
|
|
|
Received letter from consulting structural engineer approving the revised structural plans and calculations. JCM
|
Plan resubmittals received | | | 8/20/2008 | | |
John Menard
|
|
|
Received three copies of Structural Calculations; inserted into plans by LEG; taken back to John Menard
|
Plan resubmittals requested | | | 8/20/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting additional revisions. JCM
|
Routing - PLAN CHECK | 7/31/2008 | | 8/20/2008 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 8/19/2008 | | DONE |
|
|
|
received 1 response , 3 copies of sheets G0.1,A2.1,A2.3,A4.1,A6.1,A8.1,A10.1,S1.1,S2.1,S3.1,M0.1,M0.2,M2.1,M4.1,M5.1,MPS,P0.1,P2.1,P2.2,E1.0,E2.0 plans inserted by Ryan from CSHQA and plans taken back to John M.
|
Route to Impact Fee Review | 7/30/2008 | 8/4/2008 | 7/31/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 7/30/2008 | 7/30/2008 | 7/31/2008 | | PASS |
Scott Arellano
|
|
|
See IFC fire review comments attached.
|
1st review completed | | | 7/31/2008 | | FAIL |
|
|
|
Failed, PW, PW drainage,Plan check, off site structual, Mechanical and plan check.
|
Routing - PLAN CHECK | 6/30/2008 | | 7/30/2008 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 7/30/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - MECHANICAL | 6/24/2008 | | 6/30/2008 | | FAIL |
Troy James
|
|
|
1. Boise City interpretation to the Ventilation requirements for nail salons per IMC Table 403.3, footnote b, states that there shall be no recirculation of air in the space. The intent of the IMC is that the exhaust system shall be at point of use. Please revise plans to show the exhaust system to manicure station. Diffuser at ceiling above does not meet intent of code.
2. Please show on plans revised ventilation calculations and make up air design.
3. Provide section view on plans of exhaust system at manicure station.
4. Please revise notes 10 and 13 sheet M2.1. State the fresh air shall be installed downstream of smoke detector. This is a common problem in the field. The contractor does not allow enough return duct plenum for this to be done correctly. Please show on detail sheet M5.1 the correct location of fresh air and smoke detector. Please note the smoke detectors are not required by code.
|
Routing - PLAN CHECK | 6/19/2008 | | 6/24/2008 | | |
John Menard
|
|
|
John Menard
6/24/08 Routed to Troy for mechanical review.
|
Routing - PLANNING | 6/19/2008 | | 6/19/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH08-00147. A copy of the license agrement from teh irrigation district has been included in the DR file. Andrea;
CUP07-00162 Diane P. A portion of the building encroaches into the irrigation easement. It appears that a lic. agreement was required prior to issuance of construction permits....please confirm before passing.
The required agreement was provided and placed in the CUP file prior to issuance. CER
|
Routing - PLUMBING | 6/18/2008 | | 6/19/2008 | | FAIL |
Bill VanDegrift
|
|
|
provide fixture schedule, include all fixtures. show location of backflow preventers for the pedicure stations. show detail of waste connections for the pedicure and manicure stations. verify expansion tank sizing, st-5 is too small.
|
Routing - Erosion and Sediment | 6/13/2008 | | 6/18/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions. ESC08-00516
|
Plan resubmittals requested | | | 6/18/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of structural comment list requesting revisions. JCM
|
Plan resubmittals received | | | 6/17/2008 | | |
Barbara Stitt
|
|
|
Received 1 cover transmittal, 2 O & m manuals, 2 copies of sheets C1.4 & C1.5 and inserted into plans by Jeff With CSHQA//taken back to ESC inbox/6-17-08 @ 9:39am BAS
|
Routing Off Site - STRUCTURAL | 6/10/2008 | | 6/16/2008 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PUBLIC WORKS | 6/10/2008 | | 6/13/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 6/11/2008 | | 6/13/2008 | | FAIL |
Brian Murphy
|
|
|
GRADING 2 FEET NEAR PROPERTY LINE, MONITORING WELL ON PLAN. BRIAN MURPHY ###-####
|
Routing PW Street Lights | | | 6/13/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Rating | 6/13/2008 | | 6/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 6/13/2008 | | 6/13/2008 | | PASS |
Peter J. McCullough
|
|
|
Pass with condition that no dumpsters are permitted on the property (only commercial and residential cans).
Peter McCullough, ###-####
|
Pending Assignment by MYS | 6/10/2008 | | 6/10/2008 | | DONE |
John Menard
|
|
|
6/10/2008 10:06:11 JCM - activity updated through activity BLDA166 from case BLD08-01275.
|
Routing - PLANNING Land Div | 6/10/2008 | | 6/10/2008 | | PASS |
Joan Johnson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/10/2008 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/10/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/10/2008 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/10/2008 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - Addressing | 6/10/2008 | | 6/10/2008 | | PASS |
April Wing
|
|
|
|
Application received | | 6/10/2008 | | | |
Tisha Gallop
|
|
|
|