DOC - Permit Expired | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/25/2010 | 5/25/2010 | 5/28/2010 | | FAIL |
Tony Young
|
|
|
expired
|
BLD-Conference | 3/25/2010 | 3/25/2010 | 3/31/2010 | P | FAIL |
Tony Young
|
|
|
check status,, expire due to time limits
|
BLD-Aging Inspection | 3/18/2010 | 3/18/2010 | 3/25/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Energy code compliance | 11/18/2008 | 11/19/2008 | 11/19/2008 | P | NR |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2008 | 11/10/2008 | 11/10/2008 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/6/2008 at 3:47:53 PM. Contact: ###-####.
|
(F) Reprint permit | | | 10/7/2008 | | |
|
|
|
|
BLD-Conference | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Tony Young
|
|
|
john Phone #: ###-#### basement walls all done,, egress wells done,, and stairs to basement done now for bond release purposes
|
BLD-Conference | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | DONE |
Mike Jordan
|
|
|
John Phone #: ###-####. Needs to complete the stairway for bond release as per Bob Archibald.
|
BLD-Footing | 9/4/2008 | 9/5/2008 | 9/5/2008 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-#### rear addition ok
|
BLD-Foundation | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-#### block IFC basement wall ok
|
BLD-Foundation | 8/19/2008 | 8/20/2008 | 8/20/2008 | P | PART |
Tony Young
|
|
|
john Phone #: ###-#### wip,, will re-inspect in am
|
BLD-Footing | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-#### got eng fix,, wip ok
|
BLD-Footing | 8/12/2008 | 8/13/2008 | 8/13/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/12/2008 at 3:56:30 PM. Contact: ###-####. Footing for basement walls. Will need to provide fix from engineer were cribbing was in the way of footing line, footing width was reduced to half in this area. homeowner and conc. contractor was made aware of this. Noted to try and have fix from engineer on basement wall insp.
|
Routing Walk-In (BLD) | 8/4/2008 | 8/4/2008 | 8/7/2008 | A | DONE |
Perry Paine
|
|
|
8/7/2008 14:13:32 PEP - activity updated through activity BLDA022 from case BLD08-01277.
|
Case Summary (BLD) | | | 8/7/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2008 | | DONE |
Cathy Brown
|
|
|
tlk green remodeling that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/7/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/7/2008 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/7/2008 | | DONE |
|
|
|
already issued previously
|
Routing Walk-In (Zoning) | 8/4/2008 | 8/4/2008 | 8/4/2008 | A | DONE |
Julie Archambeault
|
|
|
8/4/2008 10:26:03 CTC - activity updated through activity BLDI252 from case BLD08-01277.
|
Routing Walk-In (BLD) | 7/31/2008 | 7/31/2008 | 8/4/2008 | P | DONE |
Barbara Stitt
|
|
|
8/4/2008 10:10:14 B_S - activity updated through activity BLDI254 from case BLD08-01277.
|
Issue PAID IN FULL permit | | | 6/24/2008 | | DONE |
|
|
|
|
OVERRIDE | | | 6/10/2008 | | |
|
|
|
|
OVERRIDE | | | 6/10/2008 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Joshua Johnson
|
|
|
|
Routing Walk-In (BLD) | 6/10/2008 | 6/10/2008 | 6/10/2008 | A | DONE |
Perry Paine
|
|
|
6/10/2008 11:28:51 PEP - activity updated through activity BLDA022 from case BLD08-01277.
|
Case Summary (BLD) | | | 6/10/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2008 | | DONE |
|
|
|
|
Override - People Holds | | | 6/10/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 6/10/2008 | | DONE |
Tisha Gallop
|
|
|
contractor will be back to pick up and pay for permit
|
Application received | | 6/10/2008 | | | |
|
|
|
|