Permit Information
Permit NumberBLD08-01293
StatusFinaled
Name GUHO CORP
Site Address 404 S 8TH ST
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET MARKETPLACE - ATRIUM SMOKE CONTROL - 404 S 8TH STREET) (8-23-13 PLAN MODIFICATION TO INCORPORATE INTO THIS PHASE II PROJECT SOME PHASE I WORK THAT WAS FORMERLY EXPECTED TO BE DONE UNDER PERMIT BLD08-00378 AND SOME PHASE III WORK THAT WAS FORMERLY EXPECTED TO BE DONE UNDER A FUTURE PERMIT. THE SCOPE OF EACH PHASE IS PER A NEW UPGRADE AGREEMENT SIGNED BY CITY PERSONNEL ON JULY 2, 2013. A FUTURE PHASE III PERMIT WILL BE SUBMITTED LATER THAT IS INTENDED TO CREATE A FULLY OPERATIONAL SMOKE MANAGEMENT SYSTEM.) The fire sprinkler system substitutes for the 1-hr fire-resistance-rating of the building. To complete Phase II (construct structural supports for roof top smoke exhaust fans, install roof top smoke exhaust fans, and install associated ductwork) of the atrium smoke control system. Phase I (installed the exhaust grille, constructed the roof curb, and installed the exhaust plenum on top of the roof curb) was done as plan modifications to permit BLD08-00378. Phase III (install automatic unlatching and opening hardware on select doors and windows to provide for make-up air, install a standby diesel powered electrical generator, and install all elements for a complete smoke control system) will be done under a future permit. The work is required to comply with the approved drawings, with the plan review report, with the structural design, with the smoke control design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/16/201411/3/2014 DONE
old permit
Case Summary (BLD)  3/11/2014 DONE
Agreement of Future work4/23/201011/29/20133/6/2014 DONE
DetailsCarl Westfall
This building has an upgrade agreeement on file. This permit covers Phase II of the atrium smoke control upgrade. Phase I is to be completed by October 31, 2009, Phase II is to be completed by December 31, 2010, and Phase III is to be completed by December 31, 2011. See the attached document for specifics. CJW
12/2/13 Received email notification from architect that the project is nearing completion.
7/16/13 New Upgrade Agreement attached to this case. Phase II to be completed by 11/29/13 and Phase III to be completed by 8/29/14. If Phase II is not completed by specified date, a bond shall be posted in the amount to cover both Phase II and Phase III.
4/29/10 New updated/signed Upgrade Agreement completed and attached to this case. New agreement has been recorded at Ada County. This Agreement replaces the previous approved agreement. New date to complete all work under the Agreement is June 30, 2013.
12/9/13 Project is progressing. Could be finished in the next 3-4 weeks. Contractor status indicates:
Generator / Trash enclosure has been modified with new CMU wall with D/W wall on top and lid to generator space drywalled. Gates still need to be modified will be completed over the next 3 weeks
Transfer switch is due to arrive the 18 or 19 of Dec. Generator is due to arrive on the 30th of Dec which will be installed right after they arrive
Structural Steel support structure is all installed on rooftop and ready for mechanical equipment and plenum. HVAC equipment to be on site around the 19th and I will get an exact date it will be placed on the roof.
About 80% electrical rough in conduit pathways and junction boxes for generator and door and window controls are complete. We still need to run the conduit pathways for the north and west door and wind controls back up to the rooftop pane which will be done this week.
Door openers, mag locks and electric strikes have been delivered and will be installed over the next 3 weeks
Window opening in North stairwell has been modified and is ready for Storefront operable windows that have been ordered. I need to verify ship date.
3/6/14 Work outlined in the Upgrade Agreement is complete. A copy of the recorded Notice of Compliance is attached to this case.
DOC - Permit Finaled  3/4/2014 DONE
DetailsChristina Prado
Per Dave Hannah 3-4-14
BLD-Final2/7/20142/10/20142/10/2014APASS
DetailsDave Hannah
Boyd Phone #: ###-####
Zoning Approval2/6/20142/6/20142/6/2014 DONE
DetailsMatthew A Halitsky
Interior work.
FIRE-Final Inspection2/5/20142/5/20142/5/2014PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection11/18/201311/18/201311/25/2013 PEND
DetailsDave Hannah
BLD-Footing11/20/201311/20/201311/21/2013PPASS
DetailsDave Hannah
BOYD Phone #: ###-####
CHANGE STATUS TO (ISS)  9/9/2013 DONE
DetailsTisha Gallop
plan mod issued
Telephone call  8/27/2013 DONE
DetailsChristina Prado
called Jessica to advise permit is ready and gave fees due
Permit Ready to Issue  8/27/2013 DONE
DetailsChristina Prado
Plan assigned to (CJW)8/8/20138/8/20138/23/2013 PASS
DetailsCarl Westfall
Routing - PLAN CHECK8/8/2013 8/23/2013 PASS
DetailsCarl Westfall
Approved the plan modification
PLANS/APPL TAKEN TO FRONT DESK  8/23/2013 DONE
Inspection Record Card- Bld  8/23/2013 DONE
DetailsTisha Gallop
Plan Modification Accepted  8/8/2013 DONE
DetailsTisha Gallop
Plan modification accepted for Bld08-01293 & Bld08-00378 (8th Street Marketplace) to organize the previously approved phased work in (2) phases, clearly identifying remaing work to be completed to install an updated Smoke Evacuation System in the Mercantile Bldg. Originally the (3) phased project was under two different permit numbers. The majority of work under Bld08-00378 has been completed, with the exception of the construction of the smoke exhaust plenum - sheet a5.12 from Bld08-00378 is now included in the Phase 2 (Bld08-01293) work and part of our Plan Modification request is for Bld08-01293. Per sheet a5.12 - there is NO change in the structura design, only including scope in the new Phase 2; submitted on plan sheets a0.01, a0.02, a3.12, a3.13, a5.12, and structural calcs; routed to Carl Westfall.
BLD-Aging Inspection3/5/20133/5/20133/13/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection9/21/20129/21/20129/21/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection5/25/20125/25/20125/29/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection2/6/20122/6/20122/9/2012 PEND
DetailsDave Hannah
Change Expiration Date Only  1/25/2012 DONE
DetailsJason Blais
Plan Reviewer's activity  1/25/2012 DONE
DetailsJason Blais
This permit valid until 6/30/13 based on specific Upgrade Agreement (attached to case). Phase II date extended out to Phase III date to complete project.
BLD-Aging Inspection8/12/20118/12/20118/12/2011 PEND
DetailsDave Hannah
Extend Review Timeline  4/12/2011 DONE
extended 180 days per jason
BLD-Conference4/4/20114/5/20114/6/2011PDEFR
DetailsDave Hannah
Ken Beck from Guho Construction ###-#### (cell) would like to meet on site at 2:00 pm. Request for permit extension needs to be turned in to Jason Blais.
Extend Review Timeline  10/15/2010 DONE
extend 180 days per jason - new expiration date will be 4-13-11
Telephone call  10/15/2010 DONE
left message w kay for andrew erstad at ###-#### - his extension request has been granted - permit will expire on 4-13-11
FIRE-Final Inspection5/28/20106/1/20106/1/2010ANR
DetailsForrest France
Intended by contractor for FIR08-00378- Phase II work per this permit scope is not complete.
Issue PAID IN FULL permit  4/21/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK2/3/2010 2/5/2010 PASS
DetailsCarl Westfall
Drawings approved for issuance.
PLANS/APPL TAKEN TO FRONT DESK  2/5/2010 DONE
Inspection Record Card- Bld  2/5/2010 DONE
Permit Ready to Issue  2/5/2010 DONE
Telephone call  2/5/2010 DONE
called Andy Erstad left message permit ready and fee given 2-5-10 dld
Plan assigned to (CJW)6/18/2008 2/5/2010 PASS
DetailsCarl Westfall
2/5/2010 10:04:07 CJW - activity updated through activity BLDA022 from case BLD08-01293.
Routing - PUBLIC WORKS  2/4/2010 DONE
Discussed trash enclosure and size of gates with Peter McCullough. He was OK with the changes.
Routing - FIRE2/1/2010 2/3/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK12/29/2009 2/1/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan Reviewer's activity  1/11/2010 FAIL
Reviewed resubmitted documents. Could not accept it. Sent E-mail to Tegan explaining why.
Plan resubmittals received  1/8/2010  
DetailsCarl Westfall
rec'd 2 sets of engineer specs- taken to carl W
Routing - PLAN CHECK9/17/2009 12/29/2009 FAIL
DetailsCarl Westfall
Completed the resubmittal review. Still concerned about the 1-hr room for the generator. Sent Tegan an E-mail and left a voice mail message.
Plan resubmittals received  12/24/2009  
DetailsCarl Westfall
Rec'd response letter and two copies of sheets- a3.12; e1.10; e1.11; e2.10; e2.11; e2.13; e2.14; taken to Carl W
Routing - PLAN CHECK10/17/2008 9/17/2009 FAIL
DetailsCarl Westfall
Carl Westfall, Plans Examiner, did not become aware that resubmittals had been received until 9-14-09. The permits desk routed the plans to him on that date. Completed the resubmittal review on 9-17-09. One item still needs to be resolved. Sent E-mail to Tegan Bohannan, Architect's rep.
Telephone call  9/14/2009 DONE
Called and talked to Andy Erstad. Ask for a letter explaining the status of the requested resubmittal. Phase II is required to be done by Dec. 31, 2010 per the upgrade agreement. Don't really want to expire the permit to do phase II. Later that day found out that the resubmittal had been sitting at the permits desk for 3 months.
Plan resubmittals received  6/18/2009 DONE
received 1 transmittal,2 memorandum, 2 heating ventilation and air conditioning,2 electrical general provisions, and 2 copies of sheets A0.01,A0.02,A0.03,A2.41,A3.12,A3.13,E1.10,E1.11,E2.10,E2.11,E2.13,E2.14 Waiting for bond to come in before sending to Carl W. 6-18-09 ///dld 9-14-09 plans taken to Carl Westfall ///dld
Extend Permit 180 days 12/9/20086/8/2009 DONE
Jenifer approved an extension of the permit application to June 8, 2009.
CHANGE STATUS TO (REV)  2/18/2009 DONE
For some reason, the permit was put in the issued status. This is NOT correct. The status was changed to REV.
Plan Reviewer's activity  1/22/2009 DONE
Sent a letter to Tegan informing her that the permit application needs to be extended or it will expire.
Routing - FIRE10/15/200810/15/200810/17/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  10/17/2008 FAIL
Failed Plan Check, Fire
Route to Impact Fee Review10/15/200810/20/200810/15/2008 PASS
DetailsCindy M. Gould
Building improvement no new square footage, therefore no impact fees required.
Routing - PLAN CHECK6/25/2008 10/15/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on October 7, 2008 and was finished on October 15, 2008. Revised drawings were required. See the plan review report. An application suitable for review was submitted on October 2, 2008. The review was delayed while the architect worked out issues regarding the phasing of this project.
Plan resubmittals received  10/2/2008  
DetailsCarl Westfall
received transmittal and three copies of sheets a0.01, a2.41, a3.12, a3.13, s1.0, s1.2, mg1.10, m1.11, m1.14, e1.10, e1.11, e2.10, e2.11, e2.13, e2.14; taken to Carl Westfall
Additional plans submitted  9/9/2008 DONE
DetailsBarbara Stitt
Received 4 copies of a letter to Dave Hanneman & George Slane dated 9-8-08 (2 pgs) from Andy Erstad, 1 to Jenifer Gilliland, 1 george Slane, 1 to Sam Rogers, 1 to Carl Westfall///9-9-08 BAS
Routing - PLANNING6/20/2008 6/24/2008 PASS
DetailsJulie Archambeault
DRh08-00168
Routing - Erosion and Sediment6/18/2008 6/20/2008 PASS
DetailsClint A Smith
ESC plan waiver approved with attached conditions. ESC08-00524
Pending Assignment by MYS6/12/2008 6/18/2008 DONE
DetailsMarlene Southard
6/18/2008 11:56:36 MYS - activity updated through activity BLDA172 from case BLD08-01293.
Plans ACCEPTED BY PLAN TECH  6/12/2008  
DetailsMarsha Smylie
Recd Pcfee & Taken To Pln CK  6/11/2008  
DetailsMarsha Smylie
Application received 6/11/2008   
DetailsMarsha Smylie