First Notice | | 8/1/2010 | 8/13/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/22/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/22/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/2/2010 | 7/2/2010 | 7/6/2010 | | PASS |
Mike Jordan
|
|
|
Per Scott with prestige homes, tenant is still in building, scott will pick up certificate of occupancy.
|
BLD-Final | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | PASS |
Mike Jordan
|
|
|
troy - please call 1 hr prior so he can meet you Phone #: ###-####. ok for perm occ.
|
BLD-Conference | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 9/3/2008 | 9/4/2008 | 9/4/2008 | A | NR |
Mike Jordan
|
|
|
Troy- call 1 hr to prior to going Phone #: ###-####
|
FIRE-Final Inspection | 9/3/2008 | 9/3/2008 | 9/3/2008 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety passed.
|
FIRE-Final Inspection | 8/28/2008 | 8/29/2008 | 8/29/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide current inspection for all of the fire extinguishers, remove thumbturn locks from the north and south lobby exit doors and provide panic hardware or make the existing access controled egress doors meet the requirements of IFC and IBC chapter 10, provide emergency lights as per sheet E4, provide hardware that allows traffic flow to follow exit signs and provide ADA compliant hardware on the north pocket door.
|
BLD-Energy code compliance | 7/10/2008 | 7/11/2008 | 7/11/2008 | P | PASS |
Mike Jordan
|
|
|
troy- call 1 hr before Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2008 | 7/11/2008 | 7/11/2008 | P | PASS |
Mike Jordan
|
|
|
troy Phone #: ###-####
|
FIRE-Final Inspection | 7/8/2008 | 7/9/2008 | 7/9/2008 | A | CANC |
Troy Cobbley
|
|
|
Per the general contractor this project is not ready for a final inspection
|
BLD-Framing/Rough-in | 7/8/2008 | 7/9/2008 | 7/9/2008 | A | NR |
Mike Jordan
|
|
|
Troy Phone #: ###-####. Needs plumbing ri insp.
|
BLD-Framing/Rough-in | 6/25/2008 | 6/26/2008 | 6/26/2008 | A | PART |
Mike Jordan
|
|
|
troy Phone #: ###-#### - please call 1 hr prior to inspection. Interior wood framed walls. Still needs elec ri and insp. Contractor will recall framing insp. Went over door locking requirements and ADA requirements with contractor.
|
Issue PAID IN FULL permit | | | 6/24/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 6/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Call Lynn Brown at ###-####, permit ready, fees given
|
Permit Ready to Issue | | | 6/23/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (TLW) | 6/12/2008 | | 6/20/2008 | | PASS |
Tim L. Woodard
|
|
|
6/20/2008 10:36:06 TLW - activity updated through activity BLDA022 from case BLD08-01301.
|
Routing - PLAN CHECK | 6/20/2008 | | 6/20/2008 | | PASS |
Tim L. Woodard
|
|
|
Redlined plans for compliance.
|
Routing - FIRE | | | 6/20/2008 | | PASS |
|
|
|
Fire Dept. will verify compliance with 2006 IFC in the field.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/20/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/13/2008 | | 6/19/2008 | | FAIL |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 6/19/2008 | | FAIL |
Tim L. Woodard
|
|
|
Called Scott Ziegler and left message to call me to talk about possible options. I will likely redline in the minor corrections needed on plans. TLW
|
Routing - PUBLIC WORKS | 6/12/2008 | | 6/13/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 6/13/2008 | | 6/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Application received | | 6/12/2008 | 6/12/2008 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2008 | | DONE |
Barbara Stitt
|
|
|
|