Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01321
StatusFinaled
Name EKC INC
Site Address 333 N SAILFISH PL
Project NameBOISE CITY HALL WEST
Customer Number 
ePlanReviewNo
Description
(BOISE CITY HALL WEST) (CUP07-00107 and DRH08-00125) This building is fire sprinklered for unlimited area. To remodel an existing 92,040 square foot building (92,360 square feet after the addition) to be used as a satellite facility of Boise City Hall. The building will include a police station with office areas, a crime lab, a workout area, locker rooms, meeting rooms, an armory, and detention cells. There will also be Fire Department offices, Information Technology staff and equipment, and a community auditorium and lobby. Work is to include a 320 square foot entry vestibule addition, an awning, 2 restrooms accessible to the disabled, interior nonbearing walls, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board soffits, folding partitions, and interior finishes. The vestibule addition will include concrete footings, concrete foundations, concrete slab on grade, a 16 inch thick concrete exterior wall, steel stud exterior bearing and/or shear walls with wood structural panels, steal joist roof system with steel decking, and a membrane roof covering. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/22/20098/5/2009 DONE
First Notice 5/12/20097/22/2009 DONE
BLD-Final5/12/20095/12/20095/12/2009PPASS
DetailsMike Jordan
joe - around 1 please Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  5/12/2009 DONE
BLD-Final3/4/20093/6/20093/6/2009PPART
DetailsTom Arcoraci
Joe Phone #: ###-#### ok for temp
FIRE-Final Inspection3/5/20093/6/20093/6/2009APASS
DetailsTroy Cobbley
LIfe safety passed. Alan is to verify the operation of the fire smoke dampers. Mark Senteno approved the narrow gates and the deletion of the Opticon systm and the Knox key box
FIRE-Final Inspection3/4/20093/5/20093/5/2009AFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs to be finaled. Mount the occupant load signs, provide signage on the riser room and facp rooms as discussed. Provide exit discharge light at the main exit.
FIRE-Final Inspection3/3/20093/4/20093/4/2009AFAIL
DetailsTroy Cobbley
The only items inspected today was the exit signs/emergency lighting. See the city approved plans for locations where devices are missing or inoperative.
BLD-Final3/2/20093/3/20093/3/2009ANR
DetailsMike Jordan
Joe Phone #: ###-####. Needs other trades and zoning first. Contacted Joe wtih EKC and let him know what needed to be completed prior to structural sign off.
FIRE-Conference3/2/20093/2/20093/2/2009PDONE
DetailsTroy Cobbley
All a/v's are now meeting the height requirements of NFPA 72.
BLD-Wall cover2/25/20092/26/20092/26/2009APASS
DetailsJim Storey
Joe- cover Phone #: ###-#### new entry ok to cover 2 layers 5/8 gyp
BLD-Framing/Rough-in2/25/20092/25/20092/25/2009PDEFR
DetailsJim Storey
Joe- cover Phone #: ###-#### work not ready for insp. defered to am.301
Meeting  2/23/2009 DONE
Fire - Alternative Design approval - per Email received 2/23/09. Sam, I will approve the installation of the two security gates at City Hall West without the Opticom system if the following two conditions are met: 1. In the event of a power outage, the gate locks fail unlocked (the gate is balanced so it can be manually opened) 2. In the event of a fire alarm, the gates open and remain open until the alarm is reset. Thank you,
Mark Senteno
BLD-Framing/Rough-in2/18/20092/19/20092/19/2009APART
DetailsJim Sly
Joe Phone #: ###-####
Framing OK Panic vestible....Fire caulk OK at interrogation area rated walls.
BLD-Conference2/11/20092/11/20092/11/2009PPART
DetailsMike Jordan
Inspected required structural upgrade, also inspected membrane and thruogh penetrations for 1hr. wall. Info from architect is incomplete, received design listings only no details. Called and left message with architect.
BLD-Other2/5/20092/5/20092/5/2009PPASS
DetailsMike Jordan
joe Note: rebar - 4:00 pour schedule Phone #: ###-####
BLD-Footing1/30/20092/2/20092/2/2009ADONE
DetailsTom Arcoraci
joe Phone #: ###-#### flag pole
BLD-Framing/Rough-in1/21/20091/21/20091/21/2009PPART
DetailsMike Jordan
Performed general walk through to see progress of job. Noted that contractor has received membrane and thru penetration details from architect. wip
BLD-Footing1/21/20091/21/20091/21/2009PPASS
DetailsMike Jordan
Remainder of footing for masonry screen wall.
BLD-Framing/Rough-in1/12/20091/12/20091/12/2009PPASS
DetailsMike Jordan
1hr. wall, 2nd layer ok.
BLD-Framing/Rough-in1/7/20091/8/20091/8/2009APART
DetailsMike Jordan
joe Phone #: ###-####. Interior steel stud framing at 1hr. walls for I occ. hardlids ok, 1st. layer ok. Issued c/n for architect to provide UL approved assemblies for all membrane and thru penetrations.
BLD-Foundation1/8/20091/8/20091/8/2009APART
DetailsMike Jordan
wip on conc. art wall. Will have special insp.
BLD-Framing/Rough-in12/29/200812/30/200812/30/2008PPART
DetailsJim Sly
Joe Please call first If possible around 3pm Phone #: ###-####
1st layer 2hr walls near S.W. corner of bldg...OK
BLD-Other12/29/200812/29/200812/29/2008PPART
DetailsJim Sly
logan- stem wall Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Framing/Rough-in12/23/200812/23/200812/23/2008PPASS
DetailsMike Jordan
Interior steel stud framing for soffitts.
BLD-Framing/Rough-in12/11/200812/11/200812/11/2008PPASS
DetailsMike Jordan
nterior steel stud framed walls for area D.
BLD-Footing12/10/200812/11/200812/11/2008APART
DetailsMike Jordan
logan Phone #: ###-####. Footings for art wall. Noted special insp.
BLD-Framing/Rough-in12/8/200812/8/200812/8/2008PPART
DetailsMike Jordan
Joe Phone #: ###-####. Interior steel stud framed walls in area D.
BLD-Framing/Rough-in11/12/200811/12/200811/12/2008PPART
DetailsMike Jordan
joe Phone #: ###-####. Interior steel stud framed walls in areas A , B. ok to one side only.
BLD-Footing11/3/200811/4/200811/4/2008PDEFR
DetailsMike Jordan
logan Phone #: ###-####. Footings for new vestibule. Already placed when on site. Did note that special insp. was done.
BLD-Footing10/30/200810/31/200810/31/2008APASS
DetailsMike Jordan
logan Phone #: ###-####. Footing for permiter screen wall, South and west portions of site. Special insp. also on site.
BLD-Footing10/23/200810/24/200810/24/2008PPART
DetailsMike Jordan
logan Phone #: ###-####. Fooring for screenwall, Southwest end of site. Will have special insp.
Issue & PRINT to be Invoiced  9/10/2008 DONE
DetailsTisha Gallop
Routing - FIRE8/29/20088/29/20089/9/2008 PASS
DetailsScott Arellano
*9/2/08* Plans on hold. FD access roadway width at security gates being evaluated by Sam Rogers and Dave Hanneman. *9/9/08* Approved by dave Hanneman. Attached updated IFC comments to plans.
Routing - PLAN CHECK9/9/2008 9/9/2008  
Routed to Planning for review of revised drawings.
Routing - PLAN CHECK9/9/2008 9/9/2008  
Routed to Plan Check (Carl W.)
Routing - PLAN CHECK9/9/2008 9/9/2008 DONE
DetailsCarl Westfall
All agencies signed-off.
PLANS/APPL TAKEN TO FRONT DESK  9/9/2008 DONE
Print Occupancy Form  9/9/2008 DONE
Details
Telephone call  9/9/2008 DONE
Details
left vm for liza morris at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  9/9/2008 DONE
Details
Plan assigned to (CJW)6/20/2008 9/9/2008 PASS
DetailsCarl Westfall
9/9/2008 12:20:47 CJW - activity updated through activity BLDA022 from case BLD08-01321.
Routing - PLANNING9/9/2008 9/9/2008 PASS
DetailsMatthew A Halitsky
Revised drawings were submitted. Please re-review the drawings and add back "red lined" notes where required.
Telephone call  9/4/2008 DONE
DetailsScott Arellano
Call from Cory Nelson regarding the status of the fire review on the resubmitted plan sheets for Boise City Hall West. Informed Cory that the plans are being evaluated by Sam Rogers and Dave Hanneman regarding fire department access roadway widths.
Telephone call  9/1/2008 DONE
DetailsScott Arellano
Call from Cory Nelson regarding the status of the fire review on the resubmitted plan sheets for Boise City Hall West. Informed Cory plan review should be finished today.
Route to Impact Fee Review8/29/20089/4/20088/29/2008 PASS
DetailsCindy M. Gould
Tenant improvement no fees
Routing - PLAN CHECK8/15/2008 8/29/2008 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
Plan resubmittals received  8/27/2008  
DetailsCarl Westfall
Received 1 cover transmittal, 2 copies of response comments dated 8-20-08 from Cory Nelson (2 pgs), 2 copies of response letter for mechanical review and calcs (3pgs), 2 structural calcs books, 2 copies of sheets A3.0, A5.0, A5.1, A6.1, S0.01, S1.01, S2.01, S4.01, S5.01, S6.01, M1.1 and taken to Carl Westfall's desk 8-27-08 @ 3:51pm BAS
Routing - FIRE8/8/20088/8/20088/15/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  8/15/2008 FAIL
Failed Plan Check, Fire
Route to Impact Fee Review8/8/20088/13/20088/8/2008 PASS
DetailsShelly L. Hendrikse
Tenant improvements, no fees.
Routing - PLAN CHECK7/1/2008 8/8/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on July 25, 2008 and was finished on August 8, 2008. Revised drawings were required. See the plan review report.
Plan resubmittals received  7/30/2008  
DetailsCarl Westfall
Received transmittal and two copies of Project Manual; taken to Carl Westfall
Plan resubmittals received  7/21/2008  
DetailsCarl Westfall
Received transmittal and two copies of Structural Supplement Calculations; taken to Carl Westfall
Plan resubmittals received  7/17/2008  
Received 1 cover transmittal, 3 new complete sets of plans due to plan modification///7-17-08 BAS/// Sets include- a0.0 a0.1 c1.01 c2.01 c1.0 c2.0 a1.0 a1.1 a1.2 a1.3 a1.4 a1.5 a2.0 a2.01 a2.1 a2.2 a2.3 a2.4 a2.5 a2.6 a2.7 a3.0 a4.0 a4.1 a5.0 a6.0 a6.1 a7.0 a7.1 a8.0 a8.1 a8.2 a8.3 a8.4 a8.5 a9.0 a9.1 a9.2 a9.3 a9.4 a9.5 id1.1 id1.2 s0.01 s1.01 s2.01 s4.01 s5.01 s5.02 s5.03 s5.04 s6.01 mg1.1 mg1.2 m0.1 m1.1 m1.2 m1.3 m1.4 m1.5 m2.1m m2.2 m3.1 m4.1 p0.1 p1.1 p1.2 p1.3 p1.4 p1.5 p2.1 e0.0 e0.2 e0.3 e0.4 e0.5 e0.6 e1.1 e1.2 e1.3 e1.4 e1.5 e1.6 e1.7 e1.8 e2.1 e2.2 e2.3 e2.4 e3.1 e3.2e e3.3e e3.4 e4.1 e4.2 e4.3 e4.4 e4.5 e5.1 e5.2 e5.3 e5.4
Routing - PLANNING7/1/2008 7/1/2008 PASS
DetailsMatthew A Halitsky
Route to Plan Check (Carl W.)
Routing - PLANNING6/27/2008 6/27/2008 PASS
DetailsJoshua Johnson
routed to DRH08-00125 Matt Halitsky
Routing - PUBLIC WORKS6/24/2008 6/27/2008 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment6/27/2008 6/27/2008 PASS
DetailsClint A Smith
ESC plan approved with attached conditions. ESC08-00532
Routing PW Sewer Rating6/26/2008 6/26/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING Land Div6/20/2008 6/24/2008 PASS
DetailsDave Abo
Parcel A on Record Of Survey #4760. Previously Lots 50-52, Block 2, Corporate Center No. 4 Subdivision.
Pending Assignment by MYS6/16/2008 6/20/2008 DONE
DetailsMarlene Southard
6/20/2008 14:21:17 MYS - activity updated through activity BLDA172 from case BLD08-01321.
Plans ACCEPTED BY PLAN TECH  6/17/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/17/2008 DONE
DetailsTisha Gallop
Application received 6/16/2008   
DetailsTisha Gallop
Plan resubmittals received     
DetailsCarl Westfall
Received 1 cover transmittal, 2 books of Boise City Hall West Hazardous Materials List books and taken to Carl Westfall///8-12-08 @ 8:10am BAS
Plan resubmittals received     
DetailsCarl Westfall
Received 1 cover transmittal, 1 transmittal to fire review, 1 copy of email dated 8-20-08 from Mark Senteno with fire, 2 copies of sheet A1.0, A1.1 and taken to Carl Westfall///8-20-08 @ 1:15pm BAS