Permit Information
Permit NumberBLD08-01351
StatusFinaled
Name IDAHO FRAMING & ACOUSTICAL INC
Site Address 140 S COLE RD
Project NameRED CROSS FRANKLIN BUSINESS
Customer Number 
ePlanReviewNo
Description
(RED CROSS - FRANKLIN BUSINESS PARK - BLDG 3) To remodel a 4,351 sq.ft. area within an existing 12,200 sq. ft. building for use as office with accessory uses per approved plans. Work includes select demolition of non-bearing walls, doors, glazing & restrooms; upgrade common use restrooms for accessibility compliance; construct interior walls to create offices; add accessible doors and door hardware; modify suspended ceiling grid, electrical, mechanical and plumbing; and dual level light switches for energy code upgrade. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/200812/23/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 9/25/200811/7/2008 DONE
Permanent Occupancy UNPAID FEE  9/25/2008 DONE
DetailsTisha Gallop
BLD-Final9/24/20089/24/20089/24/2008PPASS
DetailsMike Jordan
Curt- call 30 mins prior to going Phone #: ###-####. All issues resolved. ok for perm occ.
BLD-Final9/18/20089/19/20089/19/2008ANR
DetailsMike Jordan
Curt- late am Phone #: ###-####. Needs plumbing final.
FIRE-Final Inspection9/18/20089/19/20089/19/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Final9/17/20089/18/20089/18/2008PNR
DetailsMike Jordan
Curt Phone #: ###-####. Needs plumbing final and life/safety.
FIRE-Final Inspection9/17/20089/18/20089/18/2008AFAIL
DetailsTroy Cobbley
Provide exit signs/emergency lights as discussed and marked on the city approved plans and provide approved door hardware as discussed and shown on the approved plans.
BLD-Framing/Rough-in9/11/20089/12/20089/12/2008APART
DetailsMike Jordan
shane - ceiling grid Phone #: ###-####. Ceiling grid ok. Needs elec. and mech ri insp. prior to cover. Also needs to leave portion of grid out were draftstop and corridor wall still need to be repaired.
BLD-Framing/Rough-in8/27/20088/28/20088/28/2008PPART
DetailsJim Sly
kurt Phone #: ###-#### - please call 1/2 hr prior to inspection
Framing appears OK.......Ok to cover areas not affected by CN.... Fix holes in R-19 ceiling insul, fix draftstop, fix all penitrations in wall adjacent to 1hr corridor, Architect to address new 20 min rated door to be installed in 1hr corridor and how it can meet ADA req. at sides of door.
Issue PAID IN FULL permit  8/7/2008 DONE
Print Occupancy Form  7/21/2008 DONE
Telephone call  7/21/2008 DONE
Details
left vm for kelly patrick at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  7/21/2008 DONE
Details
Routing - PLAN CHECK7/9/2008 7/18/2008 PASS
DetailsDan Stuart
Resubmittals provided were incomplete. Plans were red-lined to reflect code requirements and the plan review attached to plans was modified to indicate required code compliance to be verified by field inspectors. Copy of final report e-mailed to John Reseigh to respond to field inspectors and contractors request for any required details to show code compliance. Taking to permit desk to issue.
Plan resubmittals received  7/18/2008  
DetailsDan Stuart
Recieved one letter to Dan S from John Reseigh dated 7/16/08 two copies of sheets a2.1 a3.1 a10.1 and taken to dan stuarts desk 7/18/08 @ 10:45 ALR
Plan Reviewer's activity  7/18/2008 DONE
Plans red-lined and note provided for required corrections for code compliance. Copy to architect.
PLANS/APPL TAKEN TO FRONT DESK  7/18/2008 PASS
As noted and attached to plans.
Plan assigned to (DRS)6/23/2008 7/18/2008 PASS
DetailsDan Stuart
7/18/2008 14:15:00 DRS - activity updated through activity BLDA022 from case BLD08-01351.
Routing - FIRE7/7/20087/7/20087/9/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/9/2008 FAIL
Failed Plan Check
Route to Impact Fee Review7/7/20087/10/20087/7/2008 PASS
DetailsCindy M. Gould
Tenant improvements no fees
Plan resubmittals requested  7/7/2008 DONE
E-mailed plan review to architect.
Routing - PLAN CHECK6/24/2008 7/7/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to Pat McKeegan. routing to fire dept.
Routing - PUBLIC WORKS6/23/2008 6/24/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating6/24/2008 6/24/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS6/19/2008 6/23/2008 DONE
DetailsMarlene Southard
6/23/2008 14:45:41 MYS - activity updated through activity BLDA168 from case BLD08-01351.
Plans ACCEPTED BY PLAN TECH  6/19/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/19/2008 DONE
DetailsTisha Gallop
Application received 6/18/20086/18/2008 DONE
DetailsTisha Gallop