Permit Information
Permit NumberBLD08-01363
StatusFinaled
Name HAMMERSMARK BUILDING COMP LLC
Site Address 249 S 16TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(FOERSTEL DESIGN) To remodel a 4,671 sq. ft. building previously used as a restaurant to convert to an 4,384 sq. ft. office occupancy use per approved plans and CZC08-00108. Work to include removal of a portion of the exterior load-bearing wall in the southeast corner and realigning the exterior wall to create a new entry by installing new concrete pads, steel columns and a steel beam; to modify (4) existing roof trusses; demo existing covered entry on east side and realign wall to convert to an office and add a roofline shade projection at that location; create new openings in exterior walls, install headers and new windows; and remodel the interior to create office spaces and support areas with new lighting fixtures. Accessible restrooms installed under original permit, BLD00-02347. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/24/20098/17/2009 DONE
Second Notice BLD3/4/20093/4/20097/24/2009 DONE
DetailsDarla L Downs
First Notice has not been responded to.
First Notice 2/17/20093/4/2009 DONE
Permanent Occupancy  2/17/2009 DONE
BLD-Final2/13/20092/13/20092/13/2009PPASS
DetailsDave Hannah
Rory Phone #: ###-#### ok for perm occ
BLD-Final10/23/200810/24/200810/24/2008PPART
DetailsDave Hannah
rory Phone #: ###-#### ok for temp occ c/n on site
FIRE-Final Inspection10/23/200810/24/200810/24/2008APASS
DetailsForrest France
All corrections were made per last inspection. KR//Per Forrest France No Fire Alarm permit required///2-19-09 BAS
FIRE-Final Inspection10/22/200810/23/200810/23/2008AFAIL
DetailsForrest France
Missing address numbers on the building, exit discharge lighting is not complete, missing one exit sign at the northwest exit door per clouded plan revision, need to repair EM lighting at the main office area, also need to provide means for testing the HVAC duct detectors (ie artificial smoke) for unit shutdown, inspection concluded at this time until repairs are made.
BLD-Footing8/29/20088/29/20088/29/2008PPASS
DetailsDave Hannah
rory Phone #: ###-####
BLD-Footing8/25/20088/25/20088/25/2008PPART
DetailsMike Jordan
Eric Phone #: ###-####. Interior column pad footings for new bldg. front.
BLD-Energy code compliance8/14/20088/14/20088/15/2008PPART
DetailsDave Hannah
STEVE Phone #: ###-#### ok to cover ext walls
FIRE-Conference8/12/20088/13/20088/13/2008ADONE
DetailsForrest France
On site conference regarding fire code review notes, egress lighting, exit discharge, and HVAC system duct detectors.
BLD-Framing/Rough-in8/12/20088/13/20088/13/2008APART
DetailsDave Hannah
rory Phone #: ###-#### ok to cover int walls ok to insulate ext
Issue PAID IN FULL permit  8/12/2008 DONE
Routing Off Site - STRUCTURAL8/5/2008 8/8/2008 PASS
DetailsDan Stuart
Called Action Courier for pick up 8/5/08 BAS
8/6/08 - Call from contract engineer on resubmittals. Cover letter for response and analysis calculations for lateral loads of canopies were not provided.
8/7/08 - Received missing information and faxed to contract structural engineer.
8/8/08 - Call from contract structural engineer that plans have passed structural review. Will follow with hard copy on Monday.
Telephone call  8/8/2008 DONE
Call to contract structural engineer to verify the resubmittal data fax I sent over last evening was received. Engineer received data and would review and report back to me this AM.
Routing - PLAN CHECK8/4/2008 8/8/2008 PASS
DetailsDan Stuart
Outstanding structural engineering concerns have been resolved. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  8/8/2008 PASS
Print Occupancy Form  8/8/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  8/8/2008 DONE
DetailsAlexandra L. DeYoung
Talked to Rob at ###-####, permit ready, fees given
Permit Ready to Issue  8/8/2008 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (DRS)6/26/2008 8/8/2008 PASS
DetailsDan Stuart
8/8/2008 09:59:29 DRS - activity updated through activity BLDA022 from case BLD08-01363.
Plan resubmittals received  8/5/2008  
DetailsDan Stuart
Received response letter and three copies of sheets A-102, A-502, G-002; taken to Dan Stuart
Telephone call  8/5/2008 DONE
Talked with Jim Herndon, Rob Thornton Architects, to review two remianing questions needing addressed - 1/4" steel plate on both sides of truss modification? and matching data between the electrical fixture layout plan and the data in the Lighting Compliance and Certificate Checklist documents. Lighting compliance as shown on plans fails. Jim said he would try to have resubmittals turned in by noon.
Plan resubmittals requested  8/4/2008 DONE
Copy of plan review items needing further attention and a cover letter were e-mailed to architect for response.
Routing - PLAN CHECK7/14/2008 8/4/2008 FAIL
DetailsDan Stuart
Resubmittals of 8/1/08 inserted into plans. Further clarifications required in 1/4" steel plate, plan review item 1-K(1) and item 9.5 for lighting compliance certificate and checklist Sheets G-001 & A102 for energy code compliance.
Plan resubmittals received  8/1/2008  
DetailsDan Stuart
Received tranmsittal, response letter, Project Start Up for Special Inspection application, details on door features, and three copies of plan sheets G-001, G-002, AS-101, AD-101, I-101, A-101, A-102, A-201, A-202, A-203, A-204, A-301, A-302, A-501, A-502, A-601, E-101; taken to Dan Stuart
Routing - FIRE7/10/20087/10/20087/14/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  7/14/2008 FAIL
Failed Structural, Plan Check
Route to Impact Fee Review7/10/20087/15/20087/11/2008 PASS
DetailsCindy M. Gould
Tenant improvement no fees
Plan resubmittals requested  7/10/2008 DONE
E-mailed plan review items needing corrected to architect.
Routing - PLAN CHECK6/30/2008 7/10/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to architect. Plans routed to fire code analyst.
Plan resubmittals requested  7/3/2008 DONE
E-mailed contract structural engineers report to architect for resubmittals.
Routing Off Site - STRUCTURAL6/26/2008 7/3/2008 FAIL
DetailsDan Stuart
Failed structural review. copy of review response requirements e-mailed to architect.
Routing - Erosion and Sediment6/27/2008 6/30/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00548
Routing - PLANNING6/30/2008 6/30/2008 PASS
DetailsMatthew A Halitsky
CZC08-00108

Route to Plan Check (Dan S.)
Routing - PUBLIC WORKS6/26/2008 6/27/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating6/27/2008 6/27/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS6/19/2008 6/26/2008 DONE
DetailsMarlene Southard
6/26/2008 16:04:45 MYS - activity updated through activity BLDA168 from case BLD08-01363.
Plans ACCEPTED BY PLAN TECH  6/24/2008 DONE
DetailsBarbara Stitt
BLD-Conference6/20/20086/20/20086/20/2008ADONE
DetailsSteven Webb
Informed applicant that an ESC plan will be required, waiver request denied.
Application received 6/19/20086/19/2008 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/19/2008 DONE
DetailsBarbara Stitt