BLD-Final | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | PASS |
Jim Storey
|
|
|
evan Phone #: ###-####
|
DOC - Permit Finaled | 12/5/2008 | 12/5/2008 | 12/5/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | PASS |
Tony Young
|
|
|
Evan Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | PASS |
Tony Young
|
|
|
Evan Phone #: ###-####
|
BLD-Conference | 9/26/2008 | 9/29/2008 | 9/29/2008 | A | PART |
Tony Young
|
|
|
Even Phone #: ###-#### conf on frame,, ok to insulate
|
BLD-Framing/Rough-in | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PART |
Tony Young
|
|
|
Even Phone #: ###-#### small c/n on 3rd sheet of plans,, ok tto insulate,, ok to cover ext.
|
BLD-Framing/Rough-in | 9/25/2008 | 9/26/2008 | 9/26/2008 | P | NR |
Tony Young
|
|
|
Even Phone #: ###-#### need trades
|
BLD-Conference | 8/20/2008 | 8/20/2008 | 8/21/2008 | P | PART |
Tony Young
|
|
|
evan Phone #: ###-#### existing basement wall is not plumb,, framer measured for stairs at bottom,, this made them 33" at stair line,, need to move framing out to get 36"
|
BLD-Foundation | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Tony Young
|
|
|
dave Phone #: ###-#### walls ok,, will pour int ftgs w/ slab
|
BLD-Footing | 7/17/2008 | 7/18/2008 | 7/18/2008 | A | PART |
Tony Young
|
|
|
dave - pouring at 10:30 Phone #: ###-#### poured,, setbacks appear ok
|
PubWorks Subgrade Approval | 7/10/2008 | 7/10/2008 | 7/10/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 7/1/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 6/30/2008 | 6/30/2008 | 6/30/2008 | | DONE |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 6/30/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/30/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2008 | | DONE |
Cathy Brown
|
|
|
tlk to wyke bldg co ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/30/2008 | | DONE |
Cathy Brown
|
|
|
|
Routing - PLAN CHECK | 6/26/2008 | | 6/30/2008 | | PASS |
Perry Paine
|
|
|
Perry Paine
|
Routing - PUBLIC WORKS GRADING | 6/25/2008 | | 6/26/2008 | | PASS |
Terry Records
|
|
|
Approved with conditions of approval in letter attached to the plans and this case
|
Routing - Erosion and Sediment | 6/26/2008 | | 6/26/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attached conditions. ESC08-00562
|
Application received | | 6/25/2008 | 6/25/2008 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 6/25/2008 | 6/25/2008 | 6/25/2008 | A | PASS |
David Moser
|
|
|
Routed to Terry Records for hillside review 6-25-08
|