Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01434
StatusFinaled
Name COLLIERS INTERNATIONAL
Site Address 520 S 9TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(**VANILLA FINISH**) Permit to remodel a 2,381 square foot area of the basement (northwest portion) of a 25,600 square foot building. Space was reviewed for compliance with an A-3 occupant using 1:15 occupant load for the open space, however, this space will also comply as a B occupancy. Work to include: new hardware as needed, install new H-VAC system including ducts and diffusers, new electrical/lighting, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is sprinklered for area increase and 1 hr. substitution any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be maintained as regulated by the fire department in accordance with NFPA 13 standards. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Follow up  4/8/2011 DONE
DetailsTisha Gallop
received final value 4/8/11
Telephone call  9/22/2010 DONE
DetailsTisha Gallop
left vm for Pete Conlin/Colliers still no FV sent in. Need by 9-27 or will put Colliers on hold for no inspections or new permits.
Third Notice 7/7/20108/3/2010 DONE
faxed and called Pete Conlin
Telephone call  8/3/2010 DONE
DetailsTisha Gallop
TT Pete Conlin and he said will send in FV
Third Notice 6/1/20106/23/2010 DONE
faxed and called
Telephone call  6/23/2010 DONE
DetailsTisha Gallop
called and spoke to Pete Conlin/Colliers and he said will do FV and get it right back to me
Third Notice 5/9/20105/21/2010 DONE
faxed
Second Notice 4/22/20105/4/2010 DONE
First Notice4/2/20104/2/20104/12/2010 DONE
DetailsDave Hannah
BLD-Final4/2/20104/2/20104/2/2010APASS
DetailsDave Hannah
DOC - Permit Finaled4/2/20104/2/20104/2/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection1/8/20091/9/20091/9/2009APASS
DetailsForrest France
Items on C/N completed, fire life safety passed.
BLD-Final1/8/20091/9/20091/9/2009APASS
DetailsDave Hannah
Richard Phone #: ###-####
Letter of compliance  1/9/2009 DONE
FIRE-Final Inspection1/8/20091/8/20091/8/2009PFAIL
DetailsForrest France
Missing one PFE, noted one exit sign to be repaired, need project related fire alarm final passed as well.
FIRE-Final Inspection12/23/200812/23/200812/23/2008PFAIL
DetailsForrest France
Need project related fire alarm permit work inspected, finaled and approved prior to building life safety final.
BLD-Final12/23/200812/24/200812/23/2008ACANC
DetailsDave Hannah
richard Phone #: ###-#### Note: please call 1/2 hr prior to inspection Inspection cancelled from web by: Patricia Smith
FIRE-Final Inspection12/23/200812/23/200812/23/2008PCANC
DetailsForrest France
richard Phone #: ###-####
FIRE-Conference12/8/200812/8/200812/8/2008ADONE
DetailsForrest France
Regarding project related fire alarm permit.
BLD-Framing/Rough-in11/3/200811/4/200811/4/2008PPASS
DetailsDave Hannah
richard Note: please call 1/2 hr prior to inspection Phone #: ###-####
Issue PAID IN FULL permit  10/22/2008 DONE
Plan Reviewer's activity  10/20/2008 DONE
DetailsTim L. Woodard
Applicant indicated that there is no longer a tenant for this space. Therefore, he (ROB COLLIER) would like to have this issued as a Vannilla finish. I revised the case summary and plan review report to reflect this on 10-20-08. TLW
Case Summary (BLD)  10/20/2008 DONE
Inspection Record Card- Bld  10/20/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  10/20/2008 DONE
DetailsAlexandra L. DeYoung
Called Rob at ###-####, modified permit ready, changed to vanilla shell
Case Summary (BLD)  10/16/2008 DONE
DetailsTisha Gallop
Print Occupancy Form  10/16/2008 DONE
DetailsTisha Gallop
Permit Ready to Issue  10/16/2008 DONE
DetailsTisha Gallop
Telephone call  10/16/2008 DONE
DetailsTisha Gallop
Called and left voice mail for Stephanie at Erstad Arch. that permit is ready and fee
Case Summary (BLD)  10/14/2008 DONE
Routing - PLAN CHECK8/8/2008 8/19/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/19/2008 DONE
Plan assigned to (TLW)7/2/2008 8/19/2008 PASS
DetailsTim L. Woodard
8/19/2008 15:43:02 TLW - activity updated through activity BLDA022 from case BLD08-01434.
Routing - FIRE8/4/2008 8/8/2008 PASS
DetailsKenneth R Roule
Change of occupancy per plan review.
1st review completed  8/4/2008 PASS
First review completed re-routed to fire for new analysis. TLW
Routing - PLAN CHECK  8/4/2008 PASS
DetailsTim L. Woodard
Occupant load modified than that determined by fire. Re-routing to fire for re-analysis.
Routing - FIRE7/2/2008 7/8/2008 PASS
DetailsKenneth R Roule
See IFC plan review notes for additional comments.
Routing - PUBLIC WORKS7/2/2008 7/2/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS6/27/2008 7/2/2008 DONE
DetailsMarlene Southard
7/2/2008 10:42:09 MYS - activity updated through activity BLDA185 from case BLD08-01434.
Plans ACCEPTED BY PLAN TECH  6/30/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  6/30/2008 DONE
DetailsTisha Gallop
Application received 6/27/20086/27/2008 DONE
DetailsTisha Gallop