Third Notice BLD | 3/3/2009 | 3/3/2009 | 7/22/2009 | | DONE |
Rita DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/29/2009 | 1/29/2009 | 3/3/2009 | | DONE |
Jim Toombs
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/8/2009 | 1/29/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 12/23/2008 | 12/23/2008 | 12/23/2008 | A | PASS |
Tom Arcoraci
|
|
|
Gordon Phone #: ###-####
|
BLD-Other | 11/21/2008 | 11/24/2008 | 11/24/2008 | A | PASS |
Tom Arcoraci
|
|
|
gordon Note: structural - if any problems please call him Phone #: ###-####
|
BLD-Final | 10/29/2008 | 10/31/2008 | 10/31/2008 | P | PART |
Dave Hannah
|
|
|
Gordon- call 30 mins prior to going Phone #: ###-#### ok for temp occ c/n on site
|
FIRE-Final Inspection | 10/29/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Zoning Approval | 10/29/2008 | 10/29/2008 | 10/31/2008 | | PASS |
Andrea Tuning
|
|
|
The applicant has completed the required DR modification application, installed the front screening and removed the unapproved parking space. As such, the applicant may now obtain permanent occupancy.
|
Print Occupancy Form | | | 10/29/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
FIRE-Final Inspection | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans, front sheet, for a list of deficiencies
|
Code Occupancy Approval Temp | | | 10/10/2008 | | DONE |
|
|
|
Staff has granted the builder a 30 day temporary occupancy due to teh fac tha tthe screen located on teh south elevation has not been installed, the parkign is not striped properly, and a DR modification application is currently going though the process to eliminate the trellis on the west elevation and the landscaping on the east side of the buildilng. By November 10, 2008, the modification will have to be processed and the front screen and parkign issues must be remedied or final occupancy will not be issued. ANT 10-10-08
|
BLD-Framing/Rough-in | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PASS |
Dave Hannah
|
|
|
inspection done on bld08-01581
|
BLD-Foundation | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | PART |
Dave Hannah
|
|
|
gordon Phone #: ###-#### roof drain catch basins ok to pour
|
Issue PAID IN FULL permit | | | 7/8/2008 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/3/2008 | | PASS |
|
|
|
|
Print Occupancy Form | | | 7/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2008 | | DONE |
Cathy Brown
|
|
|
lft vm with Catherine sewell ###-#### that permit and fees are ready to be picked up but needs rp
|
Permit Ready to Issue | | | 7/3/2008 | | DONE |
Cathy Brown
|
|
|
|
Plan assigned to (TLW) | 6/30/2008 | | 7/2/2008 | | PASS |
Tim L. Woodard
|
|
|
7/2/2008 14:04:43 TLW - activity updated through activity BLDA022 from case BLD08-01438.
|
Routing - PLAN CHECK | 7/1/2008 | | 7/2/2008 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
Plan resubmittals received | | | 7/2/2008 | | |
Tim L. Woodard
|
|
|
Received transmittal, two copies of RTU support details, two copies of structural calculations; taken to Tim Woodard
|
Routing - FIRE | | | 7/2/2008 | | PASS |
|
|
|
Compliance with 2006 IFC will be verified in the field.
|
Routing - Erosion and Sediment | 7/2/2008 | | 7/2/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/2/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/1/2008 | | 7/1/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 7/1/2008 | | 7/1/2008 | | PASS |
Louise Waldorf
|
|
|
|
Application received | | 6/30/2008 | 6/30/2008 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2008 | | DONE |
Barbara Stitt
|
|
|
|