Third Notice BLD | 1/29/2009 | 1/29/2009 | 4/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/7/2008 | 1/2/2009 | | DONE |
|
|
|
|
BLD-Final | 11/6/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Dave Hannah
|
|
|
von Phone #: ###-####
|
DOC - Permit Finaled | | | 11/7/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Per Dave Final
|
Permanent Occupancy | | | 11/7/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
FIRE-Final Inspection | 11/5/2008 | 11/6/2008 | 11/6/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 11/5/2008 | 11/6/2008 | 11/6/2008 | A | PASS |
Dave Hannah
|
|
|
vaughn - late morning please Phone #: ###-####
|
Plan assigned to (TLW) | 9/22/2008 | | 9/26/2008 | | PASS |
Tim L. Woodard
|
|
|
9/26/2008 08:54:51 TLW - activity updated through activity BLDA022 from case BLD08-01464.
|
Routing - PLAN CHECK | 9/24/2008 | | 9/26/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/26/2008 | | DONE |
|
|
|
|
Telephone call | | | 9/26/2008 | | DONE |
|
|
|
t/c w nathan coombs at ###-#### - permit ready and fees given (plan mod)
|
Override - Parcel Holds | | | 9/26/2008 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/26/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Pickup and paid for plan mod
|
(F) Reprint permit | | | 9/26/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - PUBLIC WORKS | 9/24/2008 | | 9/24/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan Modification Accepted | | | 9/22/2008 | | |
|
|
|
Plan modification accepted for Bld08-01464 (The Mode-shell/core) to modify the floor plan layout withing the "Pie Hole" tenant space to accomodate tenant requests and add a mechanical closet. (per Tim Woodard log in Plan Mod on this permit). Submitted on sheet A2.1; routed to Tim Woodard.
|
BLD-Framing/Rough-in | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | PART |
Dave Hannah
|
|
|
Von Phone #: ###-#### ok to cover walls for storage and restroom
|
BLD-Final | 8/27/2008 | 8/28/2008 | 8/28/2008 | A | PART |
Dave Hannah
|
|
|
Von- early am please Phone #: ###-####ok to use the two new restrooms
|
BLD-Framing/Rough-in | 8/20/2008 | 8/21/2008 | 8/22/2008 | A | PART |
Dave Hannah
|
|
|
VON NOTE: PARTIAL FRAMING EARLY POSSIBLE PLEASE Phone #: ###-####ok to cover restrooms
|
BLD-Framing/Rough-in | 8/19/2008 | 8/19/2008 | 8/20/2008 | P | PART |
Dave Hannah
|
|
|
Von Phone #: ###-#### tent sep wall and corr walls on second floor ok to cover
|
BLD-Final | 8/14/2008 | 8/15/2008 | 8/18/2008 | P | PART |
Dave Hannah
|
|
|
Von Phone #: ###-####ok to occ the restaurant areas
|
BLD-Framing/Rough-in | 8/14/2008 | 8/14/2008 | 8/15/2008 | P | PART |
Dave Hannah
|
|
|
bonn note: after 3:00 please Phone #: ###-#### ceiling framing over restaurants ok
|
Issue PAID IN FULL permit | | | 8/4/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/24/2008 | | 7/31/2008 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 7/9/2008 | | 7/31/2008 | | PASS |
Tim L. Woodard
|
|
|
7/31/2008 11:02:21 TLW - activity updated through activity BLDA022 from case BLD08-01464.
|
Routing Off Site - STRUCTURAL | 7/31/2008 | | 7/31/2008 | | PASS |
Tim L. Woodard
|
|
|
The decision was made that the required items the engineer resubmitted on were addressed fully in his resubmittals. No reason to send back to off site structrual reviewer. TLW
|
Routing - PLAN CHECK | 7/31/2008 | | 7/31/2008 | | PASS |
Tim L. Woodard
|
|
|
With letter from owner and resubmittals project complies with code.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/31/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2008 | | DONE |
|
|
|
t/c w nate coombs at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/31/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/30/2008 | | |
Tim L. Woodard
|
|
|
Received transmittal, response letters, Structural Review Comments, three copies of Structural Calculations, and three copies of sheets A2.0, S1.1, S2.1, S2.2, S3.1; taken to Tim Woodard
|
1st review completed | | | 7/24/2008 | | FAIL |
|
|
|
Failed Structural, Plan Check
|
Routing - FIRE | 7/23/2008 | | 7/24/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 7/10/2008 | | 7/23/2008 | | FAIL |
Tim L. Woodard
|
|
|
Need further infromation to complete plan review. Request sent to architect.
|
Routing Off Site - STRUCTURAL | 7/9/2008 | | 7/21/2008 | | FAIL |
Tim L. Woodard
|
|
|
Sent to outside engineering via courier.
|
Telephone call | | | 7/15/2008 | | DONE |
|
|
|
Talked with Matt Wesley and explain the routing process and approximate time table for project. 312 275 3122
|
Routing PW Sewer Rating | 7/10/2008 | | 7/10/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 7/9/2008 | | 7/10/2008 | | PASS |
Beverly Hall
|
|
|
|
Telephone call | | | 7/9/2008 | | DONE |
Tisha Gallop
|
|
|
Called Action Couriers for pick up
|
Pending Assignment by MYS | 7/2/2008 | | 7/9/2008 | | DONE |
Marlene Southard
|
|
|
7/9/2008 10:59:26 MYS - activity updated through activity BLDA185 from case BLD08-01464.
|
Plans ACCEPTED BY PLAN TECH | | | 7/3/2008 | | |
Darla L Downs
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2008 | | DONE |
|
|
|
|
Application received | | 7/2/2008 | | | |
|
|
|
|