Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD08-01467
StatusFinaled
Name BURLINGTON COAT FACTORY
Site Address 7201 W FAIRVIEW AVE
Project NameBurlington Coat Factory
Customer Number 
ePlanReviewNo
Description
(BURLINGTON COAT FACTORY) Permit to remodel a 65,551 square foot tenant space and make cosmetic exterior changes per approved plans and CZC08-00104. Work to include: [Demolition of existing floor coverings, existing storefront, interior non-bearing walls,] {construction of interior non-bearing walls to create new accessible restrooms, a count room, a cash office, a managers office, a break room,} new flooring throughout, new cash wraps, new storefront system, and interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinklered for area increase any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other5/17/20175/17/20175/17/2017PDONE
DetailsBob Archibald
Attached recorded Notice of Compliance.
BLD-Conference5/16/20175/16/20175/16/2017PCANC
DetailsMike Jordan
Case Summary (BLD)  8/8/2016 DONE
Third Notice 10/12/200910/6/2009 DONE
Telephone call  10/6/2009 DONE
DetailsTisha Gallop
received phone call from Deborah Paige/Burlington Coat Factory project mgr. she will fax over final values today.
Third Notice 9/8/200910/2/2009 DONE
faxed and mailed
Telephone call  10/2/2009 DONE
DetailsTisha Gallop
spoke to Lodman const. he said doesn't know final values per applicant (tenant) did most of that. Told him I will fax/mail this to tenant and primary them on permit.
Third Notice 8/11/20099/8/2009 DONE
Second Notice 7/22/20098/11/2009 DONE
First Notice6/9/20096/9/20097/22/2009 DONE
DetailsTom Arcoraci
BLD-Aging Inspection6/9/20096/9/20096/9/2009 DONE
DetailsTom Arcoraci
DOC - Permit Finaled6/9/20096/9/20096/9/2009PPASS
DetailsTom Arcoraci
BLD-Final4/7/20094/7/20094/7/2009APASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: John Lodman
DOC - Permit Finaled4/7/20094/7/20094/7/2009PPASS
DetailsTom Arcoraci
FIRE-Final Inspection4/5/20094/6/20094/6/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection3/31/20094/1/20094/1/2009AFAIL
DetailsTroy Cobbley
The new emergency lighting located in the southwest exit corridor did not function. The project related fire alarm permit needs to be finaled.
FIRE-Final Inspection3/30/20093/31/20093/31/2009ACANC
DetailsTroy Cobbley
Could not perform inspection due to time constraints.
BLD-Final3/27/20093/27/20093/27/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm failed but I was able to inspect the exit signs, emergency lights and egress lighting. Several of the lights did not operate and will need repaired. The exit sign in the southwest corner either needs to be removed or additioal lighting provided in the corridor and at the exit discharge.
BLD-Other3/5/20093/6/20093/6/2009APASS
DetailsTom Arcoraci
ceiling cover for new grid areas please. Phone #: ###-#### Internet Inspection Request from: John Lodman
BLD-Other2/17/20092/18/20092/18/2009APASS
DetailsTom Arcoraci
FIRE-Conference2/12/20092/12/20092/12/2009PDONE
DetailsTroy Cobbley
The contractor had questions on the exit sign locations.
FIRE-Conference2/11/20092/11/20092/12/2009PDONE
DetailsTroy Cobbley
Contractor wanted to know if the security sensors would create an obstruction to the egress path. Tom and I told him that it did not appear that it would.
BLD-Framing/Rough-in2/5/20092/5/20092/5/2009PPASS
DetailsTom Arcoraci
bac Phone #: ###-####
BLD-Aging Inspection1/15/20091/15/20091/15/2009 PASS
DetailsTom Arcoraci
BLD-Final11/2/200811/3/200811/3/2008PCANC
DetailsTom Arcoraci
pending am mech final Phone #: ###-#### Internet Inspection Request from: John Lodman
BLD-Framing/Rough-in10/20/200810/21/200810/20/2008PCANC
DetailsTom Arcoraci
need to look at soffit connection to soffit per previous inspection note Phone #: ###-#### Internet Inspection Request from: John Lodman Inspection cancelled from web by: John Lodman
Issue PAID IN FULL permit  10/15/2008 DONE
Route to Impact Fee Review10/10/200810/15/200810/14/2008 PASS
DetailsCindy M. Gould
Tenant improvement no fees
Inspection Record Card- Bld  10/13/2008 DONE
Details
Telephone call  10/13/2008 DONE
Details
left message w cynthia for nathan gramley at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  10/13/2008 DONE
Details
Routing - PLAN CHECK8/14/2008 10/10/2008 PASS
DetailsTim L. Woodard
All corrections resubmitted on and approved. Build per approved plans. TLW
Plan assigned to (TLW)7/16/2008 10/10/2008 PASS
DetailsTim L. Woodard
10/10/2008 16:58:39 TLW - activity updated through activity BLDA022 from case BLD08-01467.
Plan resubmittals received  10/10/2008  
DetailsTim L. Woodard
Rec'd letter of transmittal, 2 copies of response bulletin #5, and two copies of pages CS-1, D-1, F-1, A-1, A-4, A-5, A-7, A-11; and taken to Tim W.
PLANS/APPL TAKEN TO FRONT DESK  10/10/2008 DONE
Case Summary (BLD)  10/10/2008 DONE
Plan resubmittals received  9/15/2008  
DetailsTim L. Woodard
Received memo and two copies of sheet A-5, E1, E5; taken to Tim Woodard
Plan resubmittals received  8/27/2008  
DetailsTim L. Woodard
Received transmittal, two copies of response memo, two copies of plan sheets CS-1, EX-1, D-1, A-1, A-2, A-4, A-5, A-7, A-8, A-11, RS-1, F-1, M1, M2, P1, FP1, E1, E2.1, E2.0, E3, E4, E5, LV1, LV2, LV4; taken to Tim Woodard
Routing - FIRE8/12/200810/10/20088/14/2008 PASS
DetailsSteven Webb
See IFC plan review notes attached.
1st review completed  8/14/2008 FAIL
Plan check.
Routing - PLAN CHECK7/16/2008 8/12/2008 FAIL
DetailsTim L. Woodard
Needs to comply with previous permit and corrections in plan review report. TLW
Routing - PLANNING7/16/2008 7/16/2008 PASS
DetailsAndrea Tuning
Routing - PUBLIC WORKS7/16/2008 7/16/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS7/3/2008 7/16/2008 DONE
DetailsMarlene Southard
7/16/2008 10:16:01 MYS - activity updated through activity BLDA185 from case BLD08-01467.
Plans ACCEPTED BY PLAN TECH  7/3/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/3/2008 DONE
DetailsTisha Gallop
Application received 7/3/2008   
DetailsTisha Gallop