Permit Information
Permit NumberBLD08-01486
StatusFinaled
Name SORENSEN CONSTRUCTION INC
Site Address 5493 E WARM SPRINGS AVE
Project NameRIVERSTONE INTERNATIONAL
Customer Number 
ePlanReviewNo
Description
Need certified RP prior to permit issuance - Riverstone International - Modular Classroom Addition - To install a 1,790 square foot, modular classroom addition (Modular D-2) on the east side of existing 1,790 square foot, modular classroom D; including supports, tie-downs, skirting, exterior stairs and landings. The modular classroom building was constructed by Design Space Modular. The modular seriel number is #699-126A & #699-126B; PA number is #11369CC and the state tag number is #7601CC. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20083/9/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Case Summary (BLD)  11/25/2008  
First Notice 9/25/200811/7/2008 DONE
FIRE-Final Inspection9/25/20089/25/20089/25/2008PPASS
DetailsForrest France
Fire life safety final approved, noted restrooms are not functional-rooms are storage use only.
BLD-Final9/24/20089/25/20089/25/2008APASS
DetailsDave Hannah
orion Phone #: ###-#### ok for perm occ
Telephone call  9/25/2008  
DetailsBarbara Stitt
Per phone call with Dave Hannah no ACHD or Zoning signature's or inspections required///9-25-08 BAS
Print Occupancy Form  9/25/2008 DONE
Permanent Occupancy UNPAID FEE  9/25/2008 DONE
BLD-Final9/23/20089/24/20089/24/2008PPART
DetailsDave Hannah
orion Phone #: ###-#### needs returns on handrails
BLD-Final9/15/20089/16/20089/16/2008PPART
DetailsDave Hannah
ryan Phone #: ###-#### ok for temp occ needs to fix handrail
FIRE-Final Inspection9/16/20089/16/20089/16/2008AFAIL
DetailsForrest France
Missing the required fire extinguisher, door hardware at both restrooms is not approved.
BLD-Final9/9/20089/10/20089/10/2008PNR
DetailsTony Young
Orion Phone #: ###-####
need trades 1st
FIRE-Final Inspection9/10/20089/10/20089/10/2008PFAIL
DetailsForrest France
Exit signs at both exits did not function. Exterior egress lights at both exits were not installed. No fire extinguisher was installed.Fire alarm permit needs to be finaled before life safety can be signed off.KR
BLD-Final8/29/20089/2/20089/2/2008AFAIL
DetailsDave Hannah
orion - please call 1/2 hr prior Phone #: ###-#### needs fire finals first
Telephone call  8/22/2008 DONE
Telcall from Andy Erstad, Arch, re. how to get occupancy for opening on Monday (8/25) since they forgot to get a FA permit to connect the new modular building (which comes with alarm devices pre-installed) to the main school FACP. Simplex expects to have plans in by Tuesday. I suggested contacting Mark Senteno if they would be willing to provide watchman service, for approval of that alternative monitoring service, or if Simplex could get the wiring connected over the weekend we would allow taht to be done without a permit and we could witness a function test on Monday for preliminary approval, pending final approval after plans have been approved. He will discuss further with the GC and school admin to decide a course of action.
BLD-Foundation8/19/20088/20/20088/20/2008APASS
DetailsDave Hannah
orion Phone #: ###-#### holddowns and supports ok ok to skirt
Issue PAID IN FULL permit  8/19/2008 DONE
Telephone call  8/1/2008 DONE
DetailsCathy Brown
richard was on vacation so I left vm with brian at ###-#### that permit and fees are ready to be picked up but needs ACHD, RCE, GC & RP
Permit Ready to Issue  8/1/2008 DONE
DetailsCathy Brown
Routing - PLAN CHECK7/28/2008 7/31/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  7/31/2008 PASS
DetailsJohn Menard
Reviewed and approved resubmitted construction documents and responses. JCM
PLANS/APPL TAKEN TO FRONT DESK  7/31/2008 DONE
DetailsJohn Menard
Print Occupancy Form  7/31/2008 DONE
Details
Routing PW Sewer Rating  7/31/2008 PASS
DetailsLouise Waldorf
Plan assigned to (JCM)7/23/2008 7/31/2008 PASS
DetailsJohn Menard
7/31/2008 13:42:27 JCM - activity updated through activity BLDA022 from case BLD08-01486.
Plan resubmittals received  7/29/2008  
Received 1 cover transmittal, 1 response letter from Richard Honsinger dated 7-29-08, 3 copies of tie downs & calcs, 2 copies of revised sheet A1.11 and inserted into plans
Route to Impact Fee Review7/25/20087/30/20087/28/2008 PASS
DetailsCindy M. Gould
Routing - FIRE7/25/20087/25/20087/28/2008 PASS
DetailsSam Rogers
See IFC fire review comments attached.
1st review completed  7/28/2008 FAIL
Plan check
Plan resubmittals requested  7/25/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK7/23/2008 7/25/2008 FAIL
DetailsJohn Menard
Routing - PLANNING7/22/2008 7/23/2008 PASS
DetailsSusan Riggs
cup08-00027
Routing - PLUMBING7/16/2008 7/22/2008 PASS
DetailsBill VanDegrift
no plumbing
Routing - Erosion and Sediment7/15/2008 7/16/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00594
Routing - PUBLIC WORKS7/14/2008 7/15/2008 PASS
DetailsBeverly Hall
Routing PW Drainage7/14/2008 7/15/2008 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div7/9/2008 7/14/2008 PASS
DetailsJoan Johnson
school site - two parcels are 11 acres, staff familiar w/parcel history
OK w/ jj/daa
Plans ACCEPTED BY PLAN TECH  7/8/2008  
DetailsMarsha Smylie
Plan routing begun/NEW & ADDTN  7/8/2008  
DetailsJoan Johnson
(F) Reprint permit  7/8/2008  
DetailsMarsha Smylie
Application received 7/7/2008   
DetailsBarbara Stitt