Permit Information
Permit NumberBLD08-01506
StatusFinaled
Name BOISE CITY PARKS & REC
Site Address 3192 N SUNSET PEAK RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Foothills Training Center Shop - To construct a new 1,975 square foot, one story, pre-engineered metal shop building and related site improvements. This building will contain an office, accessible restroom and a repair/work shop. All construction per the approved plans and attached comment list. JCM NOTE: A LETTER FROM THE APPLICANT'S GEOTECHNICAL ENGINEER INDICATING THAT THE FOOTING SUBGRADE IS ACCEPTABLE MUST BE APPROVED BY PUBLIC WORKS PRIOR TO SCHEDULING A FOOTING INSPECTION. CALL TERRY RECORDS AT 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/31/20099/4/2009 DONE
Second Notice BLD3/6/20093/6/20098/31/2009 DONE
DetailsAlexandra L. DeYoung
First Notice has not been responded to.
First Notice 2/23/20093/6/2009 DONE
PubWorks Occupancy Approval2/23/20092/23/20092/23/2009 DONE
DetailsTerry Records
Final grading and drainage approved
Permanent Occupancy  2/23/2009 DONE
Print Occupancy Form  2/23/2009 DONE
BLD-Final2/19/20092/20/20092/20/2009PPASS
DetailsTony Young
Rance call 1\2 hr prior to going Phone #: ###-####
ok pending others,, may need zoning, achd, public works
Zoning Approval2/20/20092/20/20092/20/2009 DONE
DetailsColleen T Carroll
FIRE-Final Inspection2/18/20092/19/20092/19/2009PPASS
DetailsTroy Cobbley
Life safety passed. Contractor is to install the building address as discussed.
BLD-Energy code compliance1/14/20091/15/20091/15/2009APASS
DetailsTony Young
BLD-Energy code compliance1/13/20091/14/20091/14/2009ANR
DetailsTony Young
BLD-Energy code compliance1/12/20091/13/20091/13/2009PPART
DetailsTony Young
wip.. need fire blocks and ducting
BLD-Framing/Rough-in1/9/20091/12/20091/12/2009APASS
DetailsTony Young
Rance Please call 1/2 hr before going out so Rance can meet you there Phone #: ###-####
will fire block w/ insulation,, verify fan duct in restroom
BLD-Conference12/11/200812/15/200812/15/2008PPART
DetailsTony Young
rance Note: if possible at 1:30 please Phone #: ###-####
frame conf
BLD-Other11/13/200811/14/200811/14/2008PPASS
DetailsTom Arcoraci
Dale- stem wall- pouring at 3 Phone #: ###-#### mti on site
BLD-Footing11/10/200811/12/200811/12/2008APASS
DetailsTony Young
dale Phone #: ###-####
BLD-Footing11/7/200811/7/200811/7/2008PNR
DetailsTony Young
dale - late afternoon please Phone #: ###-####
need plans,, soils, etc,, on site conf only
Issue PAID IN FULL permit  11/6/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  11/5/2008 DONE
talked to steve trout at ###-#### - permit ready & need achd
Print Occupancy Form  10/22/2008 DONE
Plan assigned to (JCM)7/11/2008 9/29/2008 PASS
DetailsJohn Menard
9/29/2008 08:57:26 JCM - activity updated through activity BLDA022 from case BLD08-01506.
Routing - PLAN CHECK8/5/2008 9/29/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  9/29/2008 PASS
DetailsJohn Menard
Reviewed and approved last structural comment. JCM
PLANS/APPL TAKEN TO FRONT DESK  9/29/2008 DONE
DetailsJohn Menard
Print Occupancy Form  9/29/2008 DONE
Details
Telephone call  9/29/2008 DONE
Details
t/c w steve trout at ###-#### - permit ready and fees given
Permit Ready to Issue  9/29/2008 DONE
Details
Plan resubmittals received  9/26/2008  
DetailsJohn Menard
Received 1 cover transmittal, 3 copies of comments letter, 3 copies of sheet S1.1 and inserted into plans and returned to John Menard's desk///9-26-08 @ 2:00pm BAS
Routing Off Site - STRUCTURAL9/18/2008 9/24/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  9/24/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structural review requesting revisions, JCM
Plan Reviewer's activity  9/18/2008 PASS
DetailsJohn Menard
Reveiwed and approved requested revisions. JCM
Telephone call  9/18/2008 DONE
DetailsTisha Gallop
called Action Couriers for pick of resubmittals
Plan resubmittals received  9/17/2008  
DetailsJohn Menard
Received response letter and three copies of Foundation Calculations, Structural Design Calculations, and plan sheets A1.1, A2.2, S1.1, MB1.1, MB1.2, MB1.3, MB1.4; inserted into plans by arch. rep. and taken back to John Menard
(F) Reprint permit  8/25/2008  
Routing - PLAN CHECK7/31/2008 8/5/2008  
DetailsJohn Menard
Meeting  8/5/2008 DONE
Dave Hanneman has approved the gravel roadway leading to the proposed new structure.
Routing - FIRE8/5/2008 8/5/2008 PASS
DetailsKenneth R Roule
Attached updated IFC comments to plans
Routing - FIRE 7/29/20087/31/2008 FAIL
DetailsKenneth R Roule
See IFC fire plan review note for resubmittal requirments.
1st review completed  7/31/2008 FAIL
Off site structural and plan check.
Route to Impact Fee Review7/29/20088/1/20087/29/2008 PASS
DetailsCindy M. Gould
Plan resubmittals requested  7/29/2008 DONE
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals requested  7/29/2008 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK7/23/2008 7/29/2008 FAIL
DetailsJohn Menard
John Menard
Routing - PLANNING7/22/2008 7/23/2008 PASS
DetailsLucinda Grames
Routing - PLUMBING7/17/2008 7/22/2008 PASS
DetailsBill VanDegrift
verify cross connection protection.
Routing Off Site - STRUCTURAL7/10/2008 7/22/2008 FAIL
DetailsMarsha Smylie
called action couriers for pickup - Recived comment list from the consulting structural engineer requesting revisions. JCM
Routing - Erosion and Sediment7/15/2008 7/17/2008 FAIL
DetailsSteven Webb
No ESC permit application included in submittals, informed applicant. ESC08-
Routing - Erosion and Sediment7/17/2008 7/17/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00601
Routing - PUBLIC WORKS7/11/2008 7/16/2008 PASS
DetailsBeverly Hall
Routing PW Flood Plain  7/16/2008 PASS
DetailsJim Wyllie
Structure not in Floodplain.
Routing PW Grading-Hillside7/15/2008 7/16/2008 PASS
DetailsTerry Records
Footing subgrade must be approved by the applicants geotechnical engineer
Routing PW Sewer Design7/14/2008 7/15/2008 PASS
DetailsJon R. Gunnerson
Tie into existing sewer service provided for FLC
Routing PW Sewer Rating7/15/2008 7/15/2008 PASS
DetailsLouise Waldorf
Routing PW Drainage7/11/2008 7/14/2008 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div7/10/2008 7/11/2008 PASS
DetailsTodd Tucker
parcel is larger than five acres.
Plans ACCEPTED BY PLAN TECH  7/10/2008  
DetailsMarsha Smylie
Routing - PUBLIC WORKS GRADING7/9/2008 7/9/2008 PASS
DetailsJulie Archambeault
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
PubWorks Subgrade Approval11/10/200811/10/2008  PASS
DetailsBrian Murphy
Letter approved by Brian Murphy
Application received 7/9/2008   
DetailsMarsha Smylie