Case Summary (BLD) | | | 2/7/2012 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/14/2010 | 10/14/2010 | 10/19/2010 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 10/18/2010 | 10/18/2010 | 10/19/2010 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 10/19/2010 | 10/19/2010 | 10/19/2010 | P | PASS |
Jim Sly
|
|
|
No work was ever done on this permit.
|
BLD-Conference | 10/18/2010 | 10/18/2010 | 10/18/2010 | P | CANC |
Jim Sly
|
|
|
Ron phone
|
BLD-Final | 10/15/2010 | 10/18/2010 | 10/18/2010 | A | CANC |
Jim Sly
|
|
|
Ron phone
|
BLD-Final | 10/15/2010 | 10/15/2010 | 10/15/2010 | P | CANC |
Jim Sly
|
|
|
Ron phone.............Re-sched.......
|
BLD-Aging Inspection | 12/17/2008 | 12/17/2008 | 12/18/2008 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 12/17/2008 | 12/18/2008 | 12/18/2008 | A | NR |
Jim Sly
|
|
|
|
Issue PAID IN FULL permit | | | 9/17/2008 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/16/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Talk to Philip O. from Valley Steel-permits ready all 8 fees given
|
Permit Ready to Issue | | | 9/16/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan assigned to (SRZ) | 7/15/2008 | 7/15/2008 | 9/12/2008 | | PASS |
Sam Zahorka
|
|
|
9/12/2008 13:53:22 SRZ - activity updated through activity BLDA022 from case BLD08-01524.
|
Case Summary (BLD) | | | 9/12/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/12/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Routing - PLANNING | 9/5/2008 | | 9/9/2008 | | PASS |
Susan Riggs
|
|
|
Sarah
|
Routing - Erosion and Sediment | 9/4/2008 | | 9/5/2008 | | PASS |
Clint A Smith
|
|
|
ESC not needed.
|
Routing - PLAN CHECK | 8/6/2008 | | 9/4/2008 | | PEND |
Sam Zahorka
|
|
|
Re-submittals recieved. Routed back to other departments to expedite review time.
|
Routing - PUBLIC WORKS | 9/4/2008 | | 9/4/2008 | | PASS |
Louise Waldorf
|
|
|
|
Meeting | | | 8/12/2008 | | DONE |
|
|
|
Meeting with Bob Unger, Dave Abo, Todd Tucker, and Susan Riggs. Discussed outstanding issues with caports for the Plainridge project and what the solutions are to get the permit process rolling again. A new Condominium plat with no Lot lines and dimensions from all carports/buildings to all property lines is required for Building plan review. Mr. Unger expressed he would be back in a few weeks with the corrected plat. (SRZ)
|
Routing - FIRE | 8/4/2008 | 8/4/2008 | 8/6/2008 | | PASS |
Scott Arellano
|
|
|
No separate comments attached to plans. Carports do not impede into existing FD access roadways.
|
1st review completed | | | 8/6/2008 | | FAIL |
|
|
|
Failed Planning, Plan Check
|
Route to Impact Fee Review | 8/5/2008 | 8/8/2008 | 8/5/2008 | | PASS |
Cindy M. Gould
|
|
|
Carport for MFR no impact fee
|
Case Summary (BLD) | | | 8/5/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/23/2008 | | 8/5/2008 | | FAIL |
Sam Zahorka
|
|
|
Corrections needed to complete plan review. Faxed them to the applicant. Routed to Fire.
|
Routing - PLANNING | 7/22/2008 | | 7/23/2008 | | FAIL |
Sarah Schafer
|
|
|
DRH06-00173-Josh Wilson
There are no carports on the Design Review application. I called ###-#### (Philip) and left a message stating he would need to submit a zoning certificate of review. SMS
|
Routing - PLANNING | 7/21/2008 | | 7/22/2008 | | PASS |
Cody Riddle
|
|
|
CUP05-00031-Cody Riddle
|
Routing - Erosion and Sediment | 7/18/2008 | | 7/21/2008 | | PASS |
Steven Webb
|
|
|
ESC approved under ESC07-00609
|
Routing - PUBLIC WORKS | 7/16/2008 | | 7/18/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 7/17/2008 | | 7/18/2008 | | PASS |
Brian Murphy
|
|
|
|
Application received | | 7/11/2008 | 7/11/2008 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/11/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/11/2008 | | DONE |
Tisha Gallop
|
|
|
|