Case Summary (BLD) | | | 3/2/2010 | | |
|
|
|
|
BLD-Final | 6/10/2009 | 6/10/2009 | 6/10/2009 | A | PASS |
Dave Hannah
|
|
|
Please Call Jacob for code to the garage.
Thanks, Phone #: ###-#### Internet Inspection Request from: Jacob Florence
|
DOC - Permit Finaled | 6/10/2009 | 6/10/2009 | 6/10/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | NR |
Mike Jordan
|
|
|
Stairs will be fixed after 12:00 Phone #: ###-#### Internet Inspection Request from: Jacob Florence. Still needs plumbing final. Contractor not able to resolve plumbing issues today. Informed contractor that their are no temp occ. for R3 occ.
|
BLD-Grading Inspection | 5/29/2009 | 5/29/2009 | 5/29/2009 | A | DONE |
Terry Records
|
|
|
Final grading and drainage Approved
|
BLD-Foundation | 4/1/2009 | 4/1/2009 | 4/1/2009 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2009 at 6:11:33 AM. Contact: ###-####.
|
BLD-Footing | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PART |
Dave Hannah
|
|
|
Jacob Florence ###-#### retainning wall ftgs ok
|
BLD-Energy code compliance | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PASS |
Dave Hannah
|
|
|
jacob Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2009 | 2/5/2009 | 2/5/2009 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jacob Florence
|
BLD-Framing/Rough-in | 12/17/2008 | 12/18/2008 | 12/18/2008 | A | PART |
Dave Hannah
|
|
|
joe - shear Phone #: ###-#### ok to cover ext
|
BLD-Foundation | 9/30/2008 | 9/30/2008 | 10/1/2008 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 6:34:47 AM. Contact: ###-####.
|
BLD-Foundation | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 6:34:47 AM. Contact: ###-####.
|
BLD-Footing | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 6:52:02 AM. Contact: ###-####.
|
BLD-Footing | 9/19/2008 | 9/22/2008 | 9/22/2008 | P | CANC |
Dave Hannah
|
|
|
matt Phone #: ###-####
|
BLD-Footing | 9/18/2008 | 9/19/2008 | 9/19/2008 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/18/2008 at 3:03:01 PM. Contact: ###-####. Inspection cancelled from web by: Alexandra Rahn
|
PubWorks Subgrade Approval | 9/12/2008 | 9/12/2008 | 9/12/2008 | | DONE |
Terry Records
|
|
|
FOOTING SUBGRADE APPROVED BY THE GEOTECHNICAL ENGINEER
|
Issue PAID IN FULL permit | | | 8/26/2008 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/20/2008 | | DONE |
|
|
|
left vm for jacob at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/20/2008 | | DONE |
|
|
|
|
Plan assigned to (BSP) | 8/14/2008 | 8/14/2008 | 8/19/2008 | | PASS |
Ben S. Pavelka
|
|
|
8/19/2008 11:17:15 BSP - activity updated through activity BLDA022 from case BLD08-01563.
|
Case Summary (BLD) | | | 8/19/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/19/2008 | | DONE |
|
|
|
|
Routing - Addressing | 7/17/2008 | | 8/19/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLAN CHECK | 7/25/2008 | | 8/19/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Telephone call | | | 8/14/2008 | | |
|
|
|
Called applicant on 8-13-08 to notify him there were discrepancies between the engineering calcs and the stamped set of plans. Also, they are no longer going to do a cable guard rail. I notified the contact that I would need new elevation pages as well as a new foundation page that would match the engineering. (BSP)
|
Pending Assignment by SRZ | 7/17/2008 | | 8/14/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/14/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - FIRE | 7/24/2008 | | 7/25/2008 | | PASS |
Sam Rogers
|
|
|
No fire sprinklers required (Triplett Sub)
|
Routing - Erosion and Sediment | 7/24/2008 | | 7/24/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attach conditions. ESC08-00617
|
Routing - PLANNING | 7/24/2008 | | 7/24/2008 | | PASS |
Susan Riggs
|
|
|
I made a reduced copy of the site plan so I could pass plans
|
Route to Impact Fee Review | 7/17/2008 | 7/22/2008 | 7/22/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 7/18/2008 | | 7/22/2008 | | FAIL |
Lucinda Grames
|
|
|
The plans look fine, I'm just waiting for a reduced site plan to sign off. The applicant has been called.
|
Routing - PUBLIC WORKS | 7/18/2008 | | 7/18/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS GRADING | | | 7/18/2008 | | PASS |
Brian Murphy
|
|
|
Approved as Category 3
|
Application received | | 7/17/2008 | | | |
Marsha Smylie
|
|
|
|