BLD-Final | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Tony Young
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Grading Inspection | 10/26/2010 | 10/26/2010 | 10/26/2010 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 8/27/2010 | 8/27/2010 | 8/30/2010 | P | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####.
|
BLD-Aging Inspection | 8/5/2010 | 8/5/2010 | 8/6/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/4/2010 | 6/4/2010 | 6/7/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/30/2010 | 3/30/2010 | 3/31/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 12/22/2009 | 12/22/2009 | 12/22/2009 | A | PART |
Bob Archibald
|
|
|
Site stabization (ESC) required prior to issuance of final.
|
BLD-Conference | 6/16/2009 | 6/17/2009 | 6/17/2009 | A | PASS |
Tony Young
|
|
|
Follow-up....... t/w vertical construction about this,, they are working on this
|
BLD-Conference | 6/11/2009 | 6/12/2009 | 6/16/2009 | P | CANC |
Jim Sly
|
|
|
follow up on c/n or letter........Unable to complete inspection.....Re-scheduled for Tony.
|
BLD-Conference | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PART |
Tony Young
|
|
|
W/ 325 and 420,, concerned letter from Mike Simplot about soilage on agacent property,, survey pins staked,, c/n posted on obtaining c of o prior to occupancy,, finishing all permits that are open,, to stabilize soils that are exposed,, Civil matter pending? on p/line issues,, not a matter of building code setbacks
|
BLD-Final | 4/16/2009 | 4/16/2009 | 4/16/2009 | P | NR |
Tony Young
|
|
|
dave Phone #: ###-#### need driveway and hillside signoffs
|
BLD-Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | NR |
Tony Young
|
|
|
Dave Phone #: ###-#### need hillside,, trades,, firewall, etc.,, on site walk through
|
BLD-Energy code compliance | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Tony Young
|
|
|
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PASS |
Tony Young
|
|
|
dave Phone #: ###-####
|
BLD-Other | 10/8/2008 | 10/8/2008 | 10/8/2008 | P | PART |
Dave Hannah
|
|
|
dave Note: SHEAR PANEL - NAILING Phone #: ###-#### ok to cover ext
|
BLD-Footing | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Tony Young
|
|
|
zane Phone #: ###-#### retaining wall pier and pony wall ftg and point load, and under slab ftgs ok
|
BLD-Foundation | 8/26/2008 | 8/27/2008 | 8/27/2008 | A | PART |
Tony Young
|
|
|
Ian Phone #: ###-#### wip,, ok
|
BLD-Foundation | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PART |
Tony Young
|
|
|
een Phone #: ###-#### CURVED WALL OK
|
BLD-Footing | 8/15/2008 | 8/18/2008 | 8/18/2008 | A | PASS |
Tony Young
|
|
|
Ian Phone #: ###-####
|
PubWorks Subgrade Approval | 8/15/2008 | 8/15/2008 | 8/15/2008 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 8/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 8/13/2008 | | DONE |
|
|
|
t/c w kim at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/13/2008 | | DONE |
|
|
|
|
Plan assigned to (BSP) | 8/7/2008 | 8/7/2008 | 8/12/2008 | | PASS |
Ben S. Pavelka
|
|
|
8/12/2008 10:24:07 BSP - activity updated through activity BLDA022 from case BLD08-01599.
|
Case Summary (BLD) | | | 8/12/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/5/2008 | | 8/12/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Route to Impact Fee Review | 7/23/2008 | 7/28/2008 | 8/7/2008 | | PASS |
Cindy M. Gould
|
|
|
Credit for demo, no fees.
|
Routing - Addressing | 7/23/2008 | | 8/7/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/7/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - FIRE | 8/1/2008 | | 8/5/2008 | | PASS |
Sam Rogers
|
|
|
No fire sprinklers required. (Claremont Heights Sub)
|
Routing - Erosion and Sediment | 7/30/2008 | | 8/1/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with attacged conditions. ESC08-00629
|
Routing - PLANNING | 7/25/2008 | | 7/30/2008 | | PASS |
Lucinda Grames
|
|
|
Spoke with contractor about rear elevation. The chimney measures at 37'. Must be brought down to 35' maximum.
7-30-08 New elevations submitted bringing home into compliance.
|
Routing - PUBLIC WORKS | 7/24/2008 | | 7/25/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS GRADING | | | 7/24/2008 | | PASS |
Terry Records
|
|
|
Approved as category 3
|
Application received | | 7/23/2008 | | | |
Tisha Gallop
|
|
|
|