Case Summary (BLD) | | | 5/21/2015 | | DONE |
|
|
|
|
Third Notice | | 9/27/2009 | 9/17/2009 | | DONE |
|
|
|
|
Second Notice | | 7/22/2009 | 8/17/2009 | | DONE |
|
|
|
|
First Notice | | 4/6/2009 | 7/22/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/6/2009 | | DONE |
|
|
|
|
BLD-Final | 3/11/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####. ok forb perm occ.
|
FIRE-Final Inspection | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 2/9/2009 | 2/10/2009 | 2/10/2009 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. ok for temp occ.
|
Temporary Occupancy UNPAID FEE | | | 2/10/2009 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | CANC |
Mike Jordan
|
|
|
andy Note: check ceiling grid Phone #: ###-####
|
BLD-Other | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PASS |
Mike Jordan
|
|
|
andy Note: check ceiling grid Phone #: ###-####. Ceiling grid under soffit ok.
|
FIRE-Final Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with sam rogers permission until the remain ceiling tile is installed and the exit discharge light outside of the kitchen door is installed and tested.
|
BLD-Other | 2/6/2009 | 2/6/2009 | 2/9/2009 | A | CANC |
Mike Jordan
|
|
|
Ceiling grid- Andy- ###-####
|
Zoning Approval | 2/9/2009 | 2/9/2009 | 2/9/2009 | | DONE |
Andrea Tuning
|
|
|
The applicant has posted a bond for the remaining landscaping and has received a DR MOD (CZC09-00020) for the fireplace within the east elevation.
|
FIRE-Conference | 2/6/2009 | 2/6/2009 | 2/6/2009 | A | DONE |
Troy Cobbley
|
|
|
I went over inspection procedures and order of completion with the superintendant.
|
BLD-Other | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PART |
Mike Jordan
|
|
|
andy Note: ceiling grid Phone #: ###-####. Needs to rpovide assembly from usg for grid under the soffitts.
|
BLD-Conference | 1/29/2009 | 1/29/2009 | 1/29/2009 | P | PASS |
Jim Storey
|
|
|
andy Phone #: ###-#### reviewed sign off procegers
|
BLD-Energy code compliance | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | CANC |
Mike Jordan
|
|
|
ANDY Phone #: ###-####
|
BLD-Framing/Rough-in | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Mike Jordan
|
|
|
ANDY Phone #: ###-####. Hardlids ok to cover.
|
FIRE-Conference | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | DONE |
Troy Cobbley
|
|
|
The combustible concealed space/vertical shaft at the main entrance is ok to cover.
|
BLD-Energy code compliance | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | CANC |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####. Backing for ada components installed.
|
BLD-Energy code compliance | 1/2/2009 | 1/5/2009 | 1/5/2009 | A | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2009 | 1/5/2009 | 1/5/2009 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. All soffits and interior walls and framing for mezz. Needs to provide backing for ada grab bars.
|
BLD-Energy code compliance | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. insul. ok at north exterior wall.
|
BLD-Conference | 12/16/2008 | 12/17/2008 | 12/17/2008 | A | PASS |
Mike Jordan
|
|
|
andy Phone #: ###-####. ok to relocate elec panel in stairway.
|
BLD-Framing/Rough-in | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | PART |
Mike Jordan
|
|
|
andy - partial insulation also Phone #: ###-####. Interior sreel stud framed walls at cooler area and kitchen areas only.
|
Issue PAID IN FULL permit | | | 10/28/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2008 | | DONE |
|
|
|
left vm for steve oldham at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/6/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/24/2008 | | 10/3/2008 | | PEND |
Dan Stuart
|
|
|
Inserted new plan sheets recieved from architect. Waiting for corrected structural engineering design calcs showing correct desighn loads for new mezzanine level. Architect stated new engineering coming directly from structural engineer.
|
Plan resubmittals received | | | 10/3/2008 | | |
Dan Stuart
|
|
|
Received by mail response letter and two copies of G0.00 and A7.01; taken to Dan Stuart
|
Routing - PLAN CHECK | 10/3/2008 | | 10/3/2008 | | PASS |
Dan Stuart
|
|
|
Received corrected engineering design calcs and Sheet S1.01. Plans to permit desk to issue.
|
Telephone call | | | 10/3/2008 | | DONE |
|
|
|
Called Doug Oldham to let him know his resubmittals were received but the corrected structural engineering design calcs have not been received from structural engineer.
|
Plan resubmittals received | | | 10/3/2008 | | |
|
|
|
receivedn 4 structural calcs, and 4 copies of sheet S1.01 taken to Dan S.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2008 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 8/13/2008 | | 10/3/2008 | | PASS |
Dan Stuart
|
|
|
10/3/2008 13:39:35 DRS - activity updated through activity BLDA022 from case BLD08-01656.
|
Plan resubmittals received | | | 9/26/2008 | | |
Dan Stuart
|
|
|
Recieved 1 cover transmittal letter, and 2 copies of sheet A6.01 and taken to Dan Stuart's desk///9-26-08 @ 9:00am BAS
|
Routing - PLUMBING | 9/19/2008 | | 9/24/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan resubmittals requested | | | 9/19/2008 | | DONE |
|
|
|
Copy of remaining items needing to be addressed e-mailed to architect.
|
Routing - PLAN CHECK | 8/26/2008 | | 9/19/2008 | | FAIL |
Dan Stuart
|
|
|
Additional resubmittals required to complete original plan review conditions. copy of remaining items to be addressed e-mailed to architect for response. Plans routed to plumbing for re-review.
|
Plan resubmittals received | | | 9/16/2008 | | |
Dan Stuart
|
|
|
Received two copies of response letter from architect, response letter from Spectrum Engineers, structural calcs, Certificate of Testing, specs on kitchen hoods, electrical detail package and plan sheets G0.00, G0.01, SP1.01, A1.01, A1.02, A1.03, A3.01, A4.01, A5.01, A5.02, A5.03, A6.01, A6.02, A6.03, A6.04, A6.05, A6.06, A6.07, A6.08, A6.09, A7.01, A7.02, FS-1.0, FS-1.1, FS-1.2, FS-1.3, FS-1.4, ME0.01, ME0.02, ME5.01, ME6.01, MH1.01, MH1.02, P1.01, P4.01, PE0.01, PE5.01, PE5.02, E0.01, E1.01, E1.02, E1.03, E4.01, E5.01, E5.02, E6.01, E6.02, E6.03, E6.04; taken to Dan Stuart
|
Routing - FIRE | 8/22/2008 | 8/22/2008 | 8/26/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 8/26/2008 | | FAIL |
|
|
|
Failed Plumbing, Plan Check
|
Route to Impact Fee Review | 8/22/2008 | 8/27/2008 | 8/25/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 8/22/2008 | | DONE |
|
|
|
Copy of plan review report e-mailed to architect for response.
|
Routing - PLAN CHECK | 8/14/2008 | | 8/22/2008 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Copy of review e-mailed to architect. Plans routed to fire code analyst for review.
|
Routing - PLUMBING | 8/14/2008 | | 8/14/2008 | | FAIL |
Bill VanDegrift
|
|
|
combination waste and vent systems are prohibited in kitchens and where conventional venting systems can be installed, show venting for all traps. fixture schedule shows a mixing valve, MV-1, where is this device located? 120 deg. max hot water will be required to all public lavs and hand sinks in the kitchen. additional cross connection protection will be required at the soda mechines, coffee and tea makers, makeup water to steamers, and misc. water supplied equipment. devices that discharge water will need to be located over a floor sink.
|
Routing - PUBLIC WORKS | 8/13/2008 | | 8/14/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 8/13/2008 | | 8/14/2008 | | PASS |
Walt Baumgartner
|
|
|
West Boise Sewer Dist. GI put in w/ shellcore. TI shows all kitchen drains to GI. OK
|
Routing PW Sewer Rating | 8/13/2008 | | 8/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Additional plans submitted | | | 8/13/2008 | | DONE |
Tisha Gallop
|
|
|
Received replacement sheet for S1.01 with licensed professional sign/seal; inserted into plans by LEG
|
Pending Assignment by MYS | 8/13/2008 | | 8/13/2008 | | DONE |
Marlene Southard
|
|
|
8/13/2008 09:34:57 MYS - activity updated through activity BLDA168 from case BLD08-01656.
|
Recd Pcfee & Taken To Pln CK | | | 8/13/2008 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 8/13/2008 | | DONE |
Tisha Gallop
|
|
|
|
Additional plans submitted | | | 8/7/2008 | | DONE |
Tisha Gallop
|
|
|
received three copies of all replacement sheets for mech, plm, and elec engineering sheets; inserted into plans by plan tech.
|
Telephone call | | | 8/7/2008 | | DONE |
Tisha Gallop
|
|
|
called applicant Steve Oldham still need S1.1 sheet signed/sealed and Lighting Compliance prior to routing to plan review, he said will follow up//8/7/08 12:05pm LEG
|
Application received | | 7/31/2008 | 7/31/2008 | | |
Tisha Gallop
|
|
|
Need sheet S1.1 signed/sealed by licensed professional, copies of all mechanical, plumbing, electrical plans not to read "Not For Construction", and 2006 IECC Lighting Compliance prior to processing and routing of plans; called restaurant contact Steve Oldham and left voice message informing him of plans needeed//7/31/08 LEG
|