Telephone call | | | 12/16/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Eric still need breakdown of final values, Stock Const. is now on hold for no inspections or permit until I receive this.
|
Telephone call | | | 11/25/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Eric Holenka/Stock Const. need breakdown of contractors to process final value he gave, told him if not hear from him within two weeks will put company on hold.
|
Third Notice | | 11/5/2009 | 11/5/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/5/2009 | | DONE |
Tisha Gallop
|
|
|
called Erick Holenka/Stock Const. and left vm need additional info for final values. Need breakdown of seperate contractors per more than one one on each trade.
|
Third Notice | | 10/17/2009 | 10/26/2009 | | DONE |
Tisha Gallop
|
|
|
faxed, mailed and called
|
Telephone call | | | 10/26/2009 | | DONE |
Tisha Gallop
|
|
|
called and left two vm, one for Eric Holenka and one in the general mailbox need final values. Note: got correct fax number from the company's general voice message.
|
Third Notice | | 9/15/2009 | 10/7/2009 | | DONE |
Tisha Gallop
|
|
|
mailed
|
Telephone call | | | 10/7/2009 | | DONE |
Tisha Gallop
|
|
|
called and left voice message need good fax number
|
Second Notice | | 8/31/2009 | 9/15/2009 | | DONE |
|
|
|
|
First Notice | | 6/10/2009 | 8/31/2009 | | DONE |
|
|
|
|
BLD-Final | 6/9/2009 | 6/10/2009 | 6/10/2009 | A | PASS |
Mike Jordan
|
|
|
jerry - please call 1/2 hr prior Phone #: ###-####. All issues resolved. Ok for perm. occ.
|
FIRE-Final Inspection | 6/9/2009 | 6/9/2009 | 6/10/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 6/10/2009 | | DONE |
|
|
|
|
BLD-Final | 4/1/2009 | 4/2/2009 | 4/2/2009 | A | PART |
Mike Jordan
|
|
|
Jerry- late am please Phone #: ###-####. ok for temp occ. Needs to install boots under sinks in unisex restrooms and repair flusher in mens room so that itb is on turning radius side.
|
Temporary Occupancy UNPAID FEE | | | 4/2/2009 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/1/2009 | 4/1/2009 | 4/1/2009 | P | NR |
Mike Jordan
|
|
|
Needs to resolve mech issues for final.
|
FIRE-Final Inspection | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with mark senteno's permission until the fire alarm permit is finaled. The temporary is only until April 19th as agreed upon with Stock Construction.
|
BLD-Final | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | NR |
Mike Jordan
|
|
|
jerry Phone #: ###-####. Still needs fire/life/safety. Rescheduled for pm inspection.
|
FIRE-Final Inspection | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs to be finaled prior to this inspection. A preliminary inspection was previously provided.
|
FIRE-Final Inspection | 3/23/2009 | 3/26/2009 | 3/26/2009 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm and fire sprinkler permits need to be finaled. Also panic hardware is required to be installed on the conference room door, provide additional emergency lighting in the two adjoining main north facing lobbys. Provide non-locking hardware from the warehouse due to an exit sign over the door or get plan reviewer permission to delete the exit sign. Provide single action hardware on the south exit door from the warehouse.
|
Zoning Approval | 3/18/2009 | 3/18/2009 | 3/20/2009 | | DONE |
Sue Cummings
|
|
|
Zoning OK to issue O.C. SAC 3/20/09
|
BLD-Other | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Jim Storey
|
|
|
Jerry- t bar Phone #: ###-#### dmv ceilling area c/n made ok
|
BLD-Other | 3/9/2009 | 3/10/2009 | 3/10/2009 | A | PART |
Mike Jordan
|
|
|
Jerry- ceiling Phone #: ###-####. 1st. floor, except for high ceiling at DmV area. Also needs to provide wires on diffusers.
|
BLD-Framing/Rough-in | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PART |
Tom Arcoraci
|
|
|
jerry - ceiling - t-bar Phone #: ###-#### up stairs grid ok
|
FIRE-Conference | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | DONE |
Troy Cobbley
|
|
|
Contractor wanted approval to use a fire retardant on the exposed wood. I deferred him to Tim Frost for approval.
|
BLD-Conference | 1/6/2009 | 1/6/2009 | 1/6/2009 | P | DONE |
Mike Jordan
|
|
|
jerry Phone #: ###-####
|
BLD-Framing/Rough-in | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | PART |
Jim Storey
|
|
|
jerry Phone #: ###-#### 2nd phase ok all but restrooms not ready.
|
BLD-Framing/Rough-in | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PART |
Mike Jordan
|
|
|
eric Phone #: ###-####. INterior steel stud framed walls on 1st. floor and 2nd. floor except for restrom.
|
BLD-Framing/Rough-in | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. Elevator shaft framing from 2nd. floor to ceiling.
|
BLD-Footing | 11/13/2008 | 11/13/2008 | 11/13/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/13/2008 at 6:38:04 AM. Contact: ###-####. Footing for elevaror pit.
|
Issue PAID IN FULL permit | | | 10/10/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/8/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/6/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2008 | | DONE |
|
|
|
t/c w scott wendell at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/5/2008 | | 10/3/2008 | | PASS |
Tim L. Woodard
|
|
|
10/3/2008 13:32:24 TLW - activity updated through activity BLDA022 from case BLD08-01664.
|
Routing - PLANNING | 10/1/2008 | | 10/3/2008 | | PASS |
Sue Cummings
|
|
|
Sue Cummings CUP07-00145
Andrea Tuning CZC08-00121
Signature on front reflects Sue's approval
|
Routing - PLAN CHECK | 9/11/2008 | | 10/1/2008 | | PASS |
Tim L. Woodard
|
|
|
Resubmittals addrss corrections required
|
Plan resubmittals received | | | 9/16/2008 | | DONE |
|
|
|
received 1 letter of transmittal, and 2 copies of sheets A0.1,A2.11,A5.1,A6.1,E2.11S,E2.11F,E2.11L,E2.11P taken to Tim W.
|
Routing - FIRE | 9/9/2008 | | 9/11/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 9/11/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 8/7/2008 | | 9/10/2008 | | FAIL |
Tim L. Woodard
|
|
|
for corrections refer to plan review report.
|
Routing - Erosion and Sediment | 8/6/2008 | | 8/7/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00652
|
Routing - PUBLIC WORKS | 8/5/2008 | | 8/6/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 8/6/2008 | | 8/6/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by MYS | 8/5/2008 | | 8/5/2008 | | DONE |
Marlene Southard
|
|
|
8/5/2008 12:05:13 MYS - activity updated through activity BLDA185 from case BLD08-01664.
|
Recd Pcfee & Taken To Pln CK | | | 8/5/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/5/2008 | | |
Darla L Downs
|
|
|
|
Application received | | 8/1/2008 | | | |
|
|
|
|