Second Notice | | 4/8/2010 | 4/5/2010 | | DONE |
|
|
|
|
First Notice | | 2/15/2010 | 3/29/2010 | | DONE |
|
|
|
sent by mail
|
BLD-Conference | 2/3/2010 | 2/4/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Todd ###-#### Complaints from Neighbors adjacent to rearof bldg. Lighting at rear of bldg is shining on residential housing and keeping occupants awake. Worked with Contr and had him install shroud around lights.
|
Permanent Occupancy UNPAID FEE | | | 2/5/2010 | | DONE |
|
|
|
|
BLD-Final | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Mike Jordan
|
|
|
Todd Phone #: ###-####. ok for perm occ.
|
BLD-Conference | 2/2/2010 | 2/3/2010 | 2/3/2010 | P | CANC |
Jim Sly
|
|
|
Todd phone ###-#### Re-sched.....
|
BLD-Conference | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | CANC |
Jim Sly
|
|
|
Todd ###-####
|
Zoning Approval | 2/3/2010 | 2/3/2010 | 2/3/2010 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Conference | 1/28/2010 | 2/2/2010 | 2/2/2010 | A | CANC |
Jim Sly
|
|
|
Call Todd at ###-#### Check to see if he put a shroud over light at back of bldg. Not done yet...Re-sched.......
|
BLD-Final | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | PART |
Jim Sly
|
|
|
Todd Phone #: ###-#### OK for Temp Occ. Talked to Todd about Zoning on Temp...(Bicycle rack).
|
BLD-Final | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | NR |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Everything ok, Mech failed. Needs to recall insp. once mech has passed.
|
Zoning Approval Temp | 1/26/2010 | 1/26/2010 | 1/26/2010 | | PASS |
Andrea Tuning
|
|
|
Staff has granted the applicant a 30 temporary occupancy. Permanent occupancy will be granted once the bike rack has been placed in an appropriate location and is securely fastened to the ground on the south side of the building within the sidewalk (outside of the 4-foot ADA pathway that is required). ANT
|
FIRE-Final Inspection | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/20/2010 | 1/21/2010 | 1/21/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on door 101 and provide verification of the hvac systems velocity for possible duct smoke detector requirements.
|
PubWorks Occupancy Approval | 12/28/2009 | 12/28/2009 | 12/28/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Mike Jordan
|
|
|
TODD (DRAFT STOP IN FIRE WALL) Phone #: ###-####. Draft stop and nailing on interior side of 1hr. firewall ok.
|
BLD-Energy code compliance | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Mike Jordan
|
|
|
Insul. ok.
|
BLD-Framing/Rough-in | 11/10/2009 | 11/10/2009 | 11/10/2009 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/10/2009 | 11/10/2009 | 11/10/2009 | A | CANC |
Mike Jordan
|
|
|
###-#### Todd
|
BLD-Framing/Rough-in | 11/5/2009 | 11/6/2009 | 11/6/2009 | A | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Interior framed walls and hardlid only. Needs to provide truss engineering. Also needs to install draftstop.
|
BLD-Framing/Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PART |
Mike Jordan
|
|
|
Todd-Sheating inspection please Phone #: ###-####. exterior 5/8 typex rock for north wall. ok.
|
BLD-Framing/Rough-in | 11/3/2009 | 11/3/2009 | 11/3/2009 | P | PART |
Mike Jordan
|
|
|
todd Phone #: ###-####. 5/8 type x rock for 1hr.wall at parapet, northwall.
|
BLD-Conference | 11/2/2009 | 11/2/2009 | 11/2/2009 | P | PART |
Jim Storey
|
|
|
todd Phone #: ###-#### exterior ok to cover/ need gyp to roof deck and 30 inches above paripett/ interior gyp needed from ceilling to roof deck/ strapping ok for sheer.
|
BLD-Framing/Rough-in | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | FAIL |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Need new UL from architect on north 1hr extering bearing wall. Engineering showing that shear values will be equivelant with 5/8 typex rock instead of 7/16 ply. Also complete straping.
|
BLD-Foundation | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PART |
Mike Jordan
|
|
|
jack Phone #: ###-####. wip on installing holddowns. All rebar in place.
|
BLD-Footing | 9/25/2009 | 9/28/2009 | 9/28/2009 | A | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. perimeter footings. wip on east footing line. Allother is complete.
|
Issue PAID IN FULL permit | | | 7/29/2009 | | DONE |
|
|
|
|
Meeting | | | 7/3/2009 | | DONE |
|
|
|
meeting with rita re: extension date - according to the date calculator we could only extend the permit to July 29, 2009 - i called wayne eldredge and informed him - he wanted to talk with rita, so i transferred him to rita - rita told him the same thing and told him that he could call jenifer on monday and discuss it with her
|
Meeting | | | 7/1/2009 | | DONE |
|
|
|
meeting with rita re: extension - a letter requesting an extension was submitted but there is a question as to when the permit can be extended to - rita is going to check into it and get back with me
|
Telephone call | | | 6/29/2009 | | DONE |
|
|
|
left vm for john resigh at ###-#### - have not heard back whether they intend to move forward or not - if not, i will be voiding this permit
|
Telephone call | | | 6/22/2009 | | DONE |
|
|
|
john reseigh called and said that he thinks the owner, wayne eldredge, wants to pick up the plans and move forward - he is going to contact wayne today and find out
|
Meeting | | | 6/22/2009 | | DONE |
|
|
|
talked to rita today - the application date was 8-18-08, permit was put in the ready status on 1-21-09 and there have been no requests for extensions - john reseigh called today and said the owner wants to pick up the plans and move forward, rita said it was okay
|
Telephone call | | | 6/19/2009 | | DONE |
|
|
|
left vm for john reseigh at ###-#### - permit has reached expiration - please return call
|
Print Occupancy Form | | | 1/21/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/21/2009 | | DONE |
Cathy Brown
|
|
|
tlk to john reseigh ###-#### that permit and fees are ready but needs gc and achd
|
Permit Ready to Issue | | | 1/21/2009 | | DONE |
Cathy Brown
|
|
|
|
Plan Reviewer's activity | | | 1/20/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved final structural revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2009 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 8/5/2008 | | 1/20/2009 | | PASS |
John Menard
|
|
|
1/20/2009 09:59:05 JCM - activity updated through activity BLDA022 from case BLD08-01682.
|
Routing - PLAN CHECK | 9/8/2008 | | 1/20/2009 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 1/15/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd one copy of stem wall calcs and two copies of sheets S0.0 & S.3- inserted by arch rep and taken to John M
|
Routing Off Site - STRUCTURAL | 1/5/2009 | | 1/7/2009 | | FAIL |
John Menard
|
|
|
E-mailed the consulting engineer a copy of the project engineer's responses. JCM - Received comments from consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals requested | | | 1/7/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the third structural review requesting revisions. JCM
|
Plan resubmittals received | | | 12/30/2008 | | DONE |
John Menard
|
|
|
Received e-mailed response to structural engineers comments.
|
Plan resubmittals requested | | | 12/1/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural comment list requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 11/24/2008 | | 11/28/2008 | | FAIL |
John Menard
|
|
|
Called Action Courier for pick up///11-24-08 @ 9:00am BAS - Received second comment list requesting revisions. JCM
|
Plan resubmittals received | | | 11/21/2008 | | |
Barbara Stitt
|
|
|
Received 1 cover transmittal, 2 sets of Wall & Frame calcs, 1 set of sheets S0.0, S1, S2, S3, S4, S5.
|
Plan resubmittals received | | | 11/13/2008 | | |
John Menard
|
|
|
received 1 cover transmittal, 1 copy of wall & frame calcs, 2 copies of sheets S0.0, S1, S2, S3, S4, S5 and inserted into plans by Mark with McKeegan's office then taken back to John Menard's desk///11-13-08 @ 3:45pm BAS
|
Routing Off Site - STRUCTURAL | 10/13/2008 | | 10/20/2008 | | FAIL |
John Menard
|
|
|
called Action Couriers for pick up ( re-submittal) - Received comment list from consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 10/20/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Plan resubmittals received | | | 10/13/2008 | | |
John Menard
|
|
|
received 1 set of plans with each sheet SO.O, S1, S2, S3, S4, & S5---& 1 set of engineering calcs
|
Plan resubmittals received | | | 10/10/2008 | | |
|
|
|
received "2" sets of plans with each sheet SO.O, S1, S2, S3, S4, & S5---& "2" sets engineering calcs (59) pages each --the inserter is norma--plans taken back to John Menard
|
Plan Reviewer's activity | | | 10/9/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions. Waitng for structural revisions. JCM
|
Plan resubmittals received | | | 10/1/2008 | | |
John Menard
|
|
|
Received two copies of sheets 1 of 4, 2 of 4, 3 of 4, 4 of 4; inserted by arch. rep. and taken back to John Menard
|
Plan resubmittals received | | | 9/30/2008 | | DONE |
John Menard
|
|
|
Rec'd one response letter, one copy of ramp details, and 2 copies of pages- a0.0, a0.1, a2.1, a2.2, a2.3, a4.1, a4.2, a3.1, a4.3, a5.1, a5.2, a6.2, m1.0; inserted by arch rep and taken back to John M.
|
Route to Impact Fee Review | 9/4/2008 | 9/9/2008 | 9/8/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 9/4/2008 | 9/4/2008 | 9/8/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 9/8/2008 | | FAIL |
|
|
|
Failed Structural, Plan Check
|
Plan resubmittals requested | | | 9/4/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 8/14/2008 | | 9/4/2008 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 8/19/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the consulting engineer's letter requesting a complete submittal in order to do the first review. JCM
|
Routing Off Site - STRUCTURAL | 8/5/2008 | | 8/15/2008 | | FAIL |
John Menard
|
|
|
Called Action Couriers for pick up - Received letter from consulting structural engineer - incomplete submittal, unable to do review. JCM
|
Routing - Erosion and Sediment | 8/12/2008 | | 8/14/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00657
|
Routing - PLANNING | 8/14/2008 | | 8/14/2008 | | PASS |
Andrea Tuning
|
|
|
This aproval is for the building permit only. Occupancy will not be issued until the lot line between the two parcels have been removed per the agreement between S. Spjute and the applicant. 8-14-08 ANT.
|
Routing - PLUMBING | 8/14/2008 | | 8/14/2008 | | PASS |
Bill VanDegrift
|
|
|
120 deg. max. hot water to public lavs.
|
Routing PW Solid Waste | 8/11/2008 | | 8/12/2008 | | PASS |
Peter J. McCullough
|
|
|
Pass with conditions; 95-gallon carts to be used and stored inside or in an enclosure. Carts must be brought to Ash Park Ln. for collection. If waste generated is to great for the carts, service must be changed to dumpster w/ enclosure at the cost of building owner.
|
Routing - PUBLIC WORKS | 8/5/2008 | | 8/12/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Street Lights | 8/11/2008 | | 8/11/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Design | 8/7/2008 | | 8/11/2008 | | PASS |
Jon R. Gunnerson
|
|
|
Connect to existing sewer stub.
|
Routing PW Drainage | 8/6/2008 | | 8/7/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 8/6/2008 | | 8/6/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/5/2008 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/5/2008 | | 8/5/2008 | | PASS |
Joan Johnson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/5/2008 | | DONE |
Darla L Downs
|
|
|
Lighting on 2003 code
|
Plan routing begun/NEW & ADDTN | | | 8/5/2008 | | |
|
|
|
|
Application received | | 8/4/2008 | | | |
|
|
|
|