Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-01682
StatusFinaled
Name ELDREDGE CORP
Site Address 1689 S ENTERTAINMENT AVE
Project NameBeds Today
Customer Number 
ePlanReviewNo
Description
Beds Today - To construct a new 5,200 square foot, one story wood framed retail building and related site improvements. All construction per the approved plans and attached comment list. JCM 4-5-10 FINAL CERT OF VALUE PER GC $0409-990.00
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/8/20104/5/2010 DONE
First Notice 2/15/20103/29/2010 DONE
sent by mail
BLD-Conference2/3/20102/4/20102/5/2010PPASS
DetailsJim Sly
Todd ###-####
Complaints from Neighbors adjacent to rearof bldg. Lighting at rear of bldg is shining on residential housing and keeping occupants awake. Worked with Contr and had him install shroud around lights.
Permanent Occupancy UNPAID FEE  2/5/2010 DONE
BLD-Final2/4/20102/4/20102/4/2010PPASS
DetailsMike Jordan
Todd Phone #: ###-####. ok for perm occ.
BLD-Conference2/2/20102/3/20102/3/2010PCANC
DetailsJim Sly
Todd phone ###-#### Re-sched.....
BLD-Conference2/3/20102/3/20102/3/2010PCANC
DetailsJim Sly
Todd ###-####
Zoning Approval2/3/20102/3/20102/3/2010 PASS
DetailsAndrea Tuning
BLD-Conference1/28/20102/2/20102/2/2010ACANC
DetailsJim Sly
Call Todd at ###-#### Check to see if he put a shroud over light at back of bldg.
Not done yet...Re-sched.......
BLD-Final1/27/20101/28/20101/28/2010APART
DetailsJim Sly
Todd Phone #: ###-####
OK for Temp Occ. Talked to Todd about Zoning on Temp...(Bicycle rack).
BLD-Final1/26/20101/26/20101/26/2010PNR
DetailsMike Jordan
Todd Phone #: ###-####. Everything ok, Mech failed. Needs to recall insp. once mech has passed.
Zoning Approval Temp1/26/20101/26/20101/26/2010 PASS
DetailsAndrea Tuning
Staff has granted the applicant a 30 temporary occupancy. Permanent occupancy will be granted once the bike rack has been placed in an appropriate location and is securely fastened to the ground on the south side of the building within the sidewalk (outside of the 4-foot ADA pathway that is required). ANT
FIRE-Final Inspection1/25/20101/25/20101/25/2010PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection1/20/20101/21/20101/21/2010AFAIL
DetailsTroy Cobbley
Provide single action hardware on door 101 and provide verification of the hvac systems velocity for possible duct smoke detector requirements.
PubWorks Occupancy Approval12/28/200912/28/200912/28/2009 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in11/12/200911/13/200911/13/2009APASS
DetailsMike Jordan
TODD (DRAFT STOP IN FIRE WALL) Phone #: ###-####. Draft stop and nailing on interior side of 1hr. firewall ok.
BLD-Energy code compliance11/10/200911/10/200911/10/2009PPASS
DetailsMike Jordan
Insul. ok.
BLD-Framing/Rough-in11/10/200911/10/200911/10/2009PPASS
DetailsMike Jordan
BLD-Energy code compliance11/10/200911/10/200911/10/2009ACANC
DetailsMike Jordan
###-#### Todd
BLD-Framing/Rough-in11/5/200911/6/200911/6/2009APART
DetailsMike Jordan
Todd Phone #: ###-####. Interior framed walls and hardlid only. Needs to provide truss engineering. Also needs to install draftstop.
BLD-Framing/Rough-in11/4/200911/4/200911/4/2009PPART
DetailsMike Jordan
Todd-Sheating inspection please Phone #: ###-####. exterior 5/8 typex rock for north wall. ok.
BLD-Framing/Rough-in11/3/200911/3/200911/3/2009PPART
DetailsMike Jordan
todd Phone #: ###-####. 5/8 type x rock for 1hr.wall at parapet, northwall.
BLD-Conference11/2/200911/2/200911/2/2009PPART
DetailsJim Storey
todd Phone #: ###-#### exterior ok to cover/ need gyp to roof deck and 30 inches above paripett/ interior gyp needed from ceilling to roof deck/ strapping ok for sheer.
BLD-Framing/Rough-in10/28/200910/28/200910/28/2009PFAIL
DetailsMike Jordan
Todd Phone #: ###-####. Need new UL from architect on north 1hr extering bearing wall. Engineering showing that shear values will be equivelant with 5/8 typex rock instead of 7/16 ply. Also complete straping.
BLD-Foundation9/30/20099/30/20099/30/2009PPART
DetailsMike Jordan
jack Phone #: ###-####. wip on installing holddowns. All rebar in place.
BLD-Footing9/25/20099/28/20099/28/2009APART
DetailsMike Jordan
Todd Phone #: ###-####. perimeter footings. wip on east footing line. Allother is complete.
Issue PAID IN FULL permit  7/29/2009 DONE
Meeting  7/3/2009 DONE
Details
meeting with rita re: extension date - according to the date calculator we could only extend the permit to July 29, 2009 - i called wayne eldredge and informed him - he wanted to talk with rita, so i transferred him to rita - rita told him the same thing and told him that he could call jenifer on monday and discuss it with her
Meeting  7/1/2009 DONE
Details
meeting with rita re: extension - a letter requesting an extension was submitted but there is a question as to when the permit can be extended to - rita is going to check into it and get back with me
Telephone call  6/29/2009 DONE
Details
left vm for john resigh at ###-#### - have not heard back whether they intend to move forward or not - if not, i will be voiding this permit
Telephone call  6/22/2009 DONE
Details
john reseigh called and said that he thinks the owner, wayne eldredge, wants to pick up the plans and move forward - he is going to contact wayne today and find out
Meeting  6/22/2009 DONE
Details
talked to rita today - the application date was 8-18-08, permit was put in the ready status on 1-21-09 and there have been no requests for extensions - john reseigh called today and said the owner wants to pick up the plans and move forward, rita said it was okay
Telephone call  6/19/2009 DONE
Details
left vm for john reseigh at ###-#### - permit has reached expiration - please return call
Print Occupancy Form  1/21/2009 DONE
Telephone call  1/21/2009 DONE
DetailsCathy Brown
tlk to john reseigh ###-#### that permit and fees are ready but needs gc and achd
Permit Ready to Issue  1/21/2009 DONE
DetailsCathy Brown
Plan Reviewer's activity  1/20/2009 PASS
DetailsJohn Menard
Reviewed and approved final structural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  1/20/2009 DONE
DetailsJohn Menard
Plan assigned to (JCM)8/5/2008 1/20/2009 PASS
DetailsJohn Menard
1/20/2009 09:59:05 JCM - activity updated through activity BLDA022 from case BLD08-01682.
Routing - PLAN CHECK9/8/2008 1/20/2009 PASS
DetailsJohn Menard
Plan resubmittals received  1/15/2009 DONE
DetailsAlexandra L. DeYoung
Rec'd one copy of stem wall calcs and two copies of sheets S0.0 & S.3- inserted by arch rep and taken to John M
Routing Off Site - STRUCTURAL1/5/2009 1/7/2009 FAIL
DetailsJohn Menard
E-mailed the consulting engineer a copy of the project engineer's responses. JCM - Received comments from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals requested  1/7/2009 DONE
DetailsJohn Menard
E-mailed the architect a copy of the third structural review requesting revisions. JCM
Plan resubmittals received  12/30/2008 DONE
DetailsJohn Menard
Received e-mailed response to structural engineers comments.
Plan resubmittals requested  12/1/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural comment list requesting revisions. JCM
Routing Off Site - STRUCTURAL11/24/2008 11/28/2008 FAIL
DetailsJohn Menard
Called Action Courier for pick up///11-24-08 @ 9:00am BAS - Received second comment list requesting revisions. JCM
Plan resubmittals received  11/21/2008  
DetailsBarbara Stitt
Received 1 cover transmittal, 2 sets of Wall & Frame calcs, 1 set of sheets S0.0, S1, S2, S3, S4, S5.
Plan resubmittals received  11/13/2008  
DetailsJohn Menard
received 1 cover transmittal, 1 copy of wall & frame calcs, 2 copies of sheets S0.0, S1, S2, S3, S4, S5 and inserted into plans by Mark with McKeegan's office then taken back to John Menard's desk///11-13-08 @ 3:45pm BAS
Routing Off Site - STRUCTURAL10/13/2008 10/20/2008 FAIL
DetailsJohn Menard
called Action Couriers for pick up ( re-submittal) - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  10/20/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals received  10/13/2008  
DetailsJohn Menard
received 1 set of plans with each sheet SO.O, S1, S2, S3, S4, & S5---& 1 set of engineering calcs
Plan resubmittals received  10/10/2008  
received "2" sets of plans with each sheet SO.O, S1, S2, S3, S4, & S5---& "2" sets engineering calcs (59) pages each --the inserter is norma--plans taken back to John Menard
Plan Reviewer's activity  10/9/2008 PASS
DetailsJohn Menard
Reviewed and approved nonstructural revisions. Waitng for structural revisions. JCM
Plan resubmittals received  10/1/2008  
DetailsJohn Menard
Received two copies of sheets 1 of 4, 2 of 4, 3 of 4, 4 of 4; inserted by arch. rep. and taken back to John Menard
Plan resubmittals received  9/30/2008 DONE
DetailsJohn Menard
Rec'd one response letter, one copy of ramp details, and 2 copies of pages- a0.0, a0.1, a2.1, a2.2, a2.3, a4.1, a4.2, a3.1, a4.3, a5.1, a5.2, a6.2, m1.0; inserted by arch rep and taken back to John M.
Route to Impact Fee Review9/4/20089/9/20089/8/2008 PASS
DetailsCindy M. Gould
Routing - FIRE9/4/20089/4/20089/8/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  9/8/2008 FAIL
Failed Structural, Plan Check
Plan resubmittals requested  9/4/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK8/14/2008 9/4/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  8/19/2008 DONE
E-mailed the architect a copy of the consulting engineer's letter requesting a complete submittal in order to do the first review. JCM
Routing Off Site - STRUCTURAL8/5/2008 8/15/2008 FAIL
DetailsJohn Menard
Called Action Couriers for pick up - Received letter from consulting structural engineer - incomplete submittal, unable to do review. JCM
Routing - Erosion and Sediment8/12/2008 8/14/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00657
Routing - PLANNING8/14/2008 8/14/2008 PASS
DetailsAndrea Tuning
This aproval is for the building permit only. Occupancy will not be issued until the lot line between the two parcels have been removed per the agreement between S. Spjute and the applicant. 8-14-08 ANT.
Routing - PLUMBING8/14/2008 8/14/2008 PASS
DetailsBill VanDegrift
120 deg. max. hot water to public lavs.
Routing PW Solid Waste8/11/2008 8/12/2008 PASS
DetailsPeter J. McCullough
Pass with conditions; 95-gallon carts to be used and stored inside or in an enclosure. Carts must be brought to Ash Park Ln. for collection. If waste generated is to great for the carts, service must be changed to dumpster w/ enclosure at the cost of building owner.
Routing - PUBLIC WORKS8/5/2008 8/12/2008 PASS
DetailsBeverly Hall
Routing PW Street Lights8/11/2008 8/11/2008 PASS
DetailsBill Colson
Routing PW Sewer Design8/7/2008 8/11/2008 PASS
DetailsJon R. Gunnerson
Connect to existing sewer stub.
Routing PW Drainage8/6/2008 8/7/2008 PASS
DetailsBrian Murphy
Routing PW Sewer Rating8/6/2008 8/6/2008 PASS
DetailsConnie Baumgartner
Recd Pcfee & Taken To Pln CK  8/5/2008 DONE
Routing - PLANNING Land Div8/5/2008 8/5/2008 PASS
DetailsJoan Johnson
Plans ACCEPTED BY PLAN TECH  8/5/2008 DONE
DetailsDarla L Downs
Lighting on 2003 code
Plan routing begun/NEW & ADDTN  8/5/2008  
Application received 8/4/2008