Harris Ranch Regional Lift Station - Permit to construct a new 888 square foot pump station and site improvements. The building is constructed with 2X6 wood frame walls and a pre-engineered wood truss system. Scope of work includes: installation of a new foundation, walls, and roof. This building is not sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/8/201011/30/2010 DONE
mailed//all contact phone numbers disconnected, put company on hold.
Third Notice 8/30/201010/25/2010 DONE
mailed
Third Notice 8/16/20108/16/2010 DONE
processes with Bld08-02474 (foundation). faxed/didn't go thorough, mailed on 8/17
DOC - Permit Finaled  8/13/2010 DONE
DetailsTisha Gallop
ok to Doc Final per Dave Hannah
FIRE-Final Inspection10/26/200910/26/200910/26/2009PPASS
DetailsForrest France
Life safety final okayed.
BLD-Final10/23/200910/26/200910/26/2009PPASS
DetailsDave Hannah
Eric ###-####//will meet Aaron out on sit
BLD-Framing/Rough-in3/24/20093/25/20093/25/2009APASS
DetailsDave Hannah
After 10 please Phone #: ###-####
BLD-Conference2/4/20092/6/20092/6/2009APASS
DetailsDave Hannah
PHIL KRICHBAUN - NOTE: PW AT CONF ASPEN RM 10:00 2 FL Phone #: ###-####
BLD-Footing2/4/20092/4/20092/4/2009PCANC
DetailsDave Hannah
mike - before 2:30 if possible please Phone #: ###-####
BLD-Foundation2/4/20092/4/20092/4/2009PPASS
DetailsDave Hannah
mike - before 2:30 if possible please Phone #: ###-####
BLD-Footing1/30/20091/30/20091/31/2009PPASS
DetailsDave Hannah
mike Note: please footing at 3:00 pm - thanks Phone #: ###-####
Issue & PRINT to be Invoiced  12/16/2008 DONE
Permit Ready to Issue  12/12/2008 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  12/12/2008 DONE
DetailsBarbara Stitt
Telephone call  12/12/2008 DONE
DetailsBarbara Stitt
Sent an email to Mike with Sommer Construction and Jim pardy to let them know the fees due and that the permit is ready for pick up///12-12-08 @ 12:09pm BAS
Routing - PLAN CHECK12/4/2008 12/8/2008 PASS
DetailsSam Zahorka
Routing - PLANNING12/8/2008 12/8/2008 PASS
DetailsMatthew A Halitsky
PLANS/APPL TAKEN TO FRONT DESK  12/8/2008 DONE
DetailsSam Zahorka
Plan assigned to (SRZ)8/19/2008 12/8/2008 PASS
DetailsSam Zahorka
12/8/2008 13:42:28 SRZ - activity updated through activity BLDA022 from case BLD08-01776.
Routing Off Site - STRUCTURAL10/17/2008 12/8/2008 PASS
DetailsSam Zahorka
Routed structural re-submittals back to outsourced structural reviewer. Called Action Courier for pick up10-17-08 @ 2:50pm BAS
Routing - PLANNING11/26/2008 12/4/2008 FAIL
DetailsMatthew A Halitsky
Landscaping plan does not match DR approval.
Telephone call  11/26/2008 DONE
DetailsSam Zahorka
Left message for Phil Krichbaum to contact Planning, Matt H.
Routing - PLAN CHECK10/23/2008 11/26/2008 PEND
DetailsSam Zahorka
Pending others to pass. Routed to Planning.
Plan resubmittals received  11/26/2008  
DetailsSam Zahorka
Received 2 cover transmittals and 2 copies of structural computations///11-26-08 BAS
Plan Reviewer's activity  10/24/2008 DONE
DetailsSam Zahorka
Recieved structural reviewers comments and emailed to the applicant.
Routing - Erosion and Sediment10/23/2008 10/23/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00924
Routing - Erosion and Sediment10/21/2008 10/22/2008 FAIL
DetailsSteven Webb
ESC plan does not meet the requirements per BMC 8-17. Plan checklist completed and faxed to applicant. Plan preparer not certified by Boise City. Applicant will need the PD certification and to make the necessary changes and re-submitt.
Routing - PLAN CHECK10/17/2008 10/21/2008 PEND
DetailsSam Zahorka
Routed resubmittals to ESC.
Routing - PLAN CHECK10/10/2008 10/17/2008 PEND
DetailsSam Zahorka
Plans have been corrected. Waiting for others to pass. (SRZ)
Routing - PUBLIC WORKS10/8/2008 10/10/2008 PASS
DetailsBeverly Hall
Routing PW Drainage10/8/2008 10/10/2008 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment10/10/2008 10/10/2008 FAIL
DetailsSteven Webb
ESC plan and application is needed. Once this is submitted a review can be performed and when approved permit may be issued.
Plan resubmittals received  10/9/2008  
DetailsBarbara Stitt
Received 4 sets of sheets A1 of A9, A2 of A9, A5 of A9, A8 of A9, 1 package ofplan review comments for Sam Zahorka, 1 letter to George Slane, 1 letter to Matt Halitsky-insterted into plans and taken back to Brian Murphy's desk///10-9-08 @ 12:10pm BAS
Routing - PLAN CHECK10/6/2008 10/8/2008 PEND
DetailsSam Zahorka
Routed to Public Works. Pending others to pass.
Routing - FIRE10/1/200810/1/200810/6/2008 PASS
DetailsScott Arellano
No fire review notes attached, see redline notes on plan sheet C-1.Hazmat is below MAQ.
1st review completed  10/6/2008 FAIL
Failed plan check.PW and errosion.
Route to Impact Fee Review10/1/200810/6/200810/2/2008 PASS
DetailsCindy M. Gould
Case Summary (BLD)  10/1/2008 DONE
Routing Off Site - STRUCTURAL8/19/2008 10/1/2008 FAIL
DetailsSam Zahorka
Recieved structural review comments. Emailed comments applicant.
Routing - PLAN CHECK9/18/2008 10/1/2008 FAIL
DetailsSam Zahorka
Emailed plan review report with corrections to the Architect.
Plan resubmittals received  9/30/2008  
DetailsSam Zahorka
Kevin Baker with JUB Engineers was in and red marked 5 sets of plans to reflect changes regarding drainage report & revision of O & M manual on sheet C2 and submitted 2 new O & M manuals then plans returned to Sam Zahorka's desk///9-30-08 @ 3:10pm BAS
Routing - PLANNING9/5/2008 9/18/2008 FAIL
DetailsMatthew A Halitsky
Landscaping Plan does not match that approved under DR.

Routed to Plan Check (Sam Z.)
Routing - PLUMBING8/28/2008 9/5/2008 PASS
DetailsBill VanDegrift
no plumbing
Routing - Erosion and Sediment8/28/2008 8/28/2008 FAIL
DetailsSteven Webb
Need to have a ESC plan and application for review. SGW allowed J. Pardy to submit building package without ESC but the BLD cannot be issued until ESC has been approved.
Routing - PUBLIC WORKS8/18/2008 8/28/2008 FAIL
DetailsLouise Waldorf
Routing PW Flood Plain  8/28/2008 PASS
DetailsJim Wyllie
Routing PW Street Lights8/25/2008 8/28/2008 PASS
DetailsHank Alarcon
Routing PW Sewer Design8/21/2008 8/25/2008 PASS
DetailsJon R. Gunnerson
Building gernerates no sewer, not required to connect.
Routing PW Sewer Rating8/25/2008 8/25/2008 PASS
DetailsLouise Waldorf
Routing PW Drainage8/19/2008 8/21/2008 FAIL
DetailsBrian Murphy
INFILTRATION SYSTEM MUST NOT TERMINATE IN FILL,WEEP HOLES IN FENCE MUST BE LABLED AND O AND M REVISED. BRIAN MURPHY ###-####
Routing - PLANNING Land Div8/19/2008 8/19/2008 PASS
DetailsJoan Johnson
Parcel larger than 5 acres
ok'd w/daa
Plan routing begun/NEW & ADDTN  8/18/2008 DONE
DetailsDarla L Downs
Application received 8/15/20088/15/2008 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  8/15/2008 DONE
DetailsBarbara Stitt
Per Steve Webb ok to accept plans without ESC app and plans as those will be turned in by whomever is awarded the contract. A correct cert of value will be brought in with all of the project values when the contract is awarded. Public works will JV submittal payment///ESC app, plans and new cert of value must be submitted and approved before this permit can be issued///8-15-08 BAS