Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD08-01782
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 161 E MALLARD DR Unit: 110
Project NameIMI VEIN CLINIC
Customer Number 
ePlanReviewNo
Description
(IMI VIEN CLINIC - 1st Floor - STE# 110) Permit to remodel a 3,830 square foot tenant space. This permit is to remodel an existing tenant space. A permit for demolition of the existing space was issued under BLD08-01611 and a permit to remodel the shell and core was issued under BLD08-01699. Work under this permit to include: [construction of interior non bearing walls to create 4 exam rooms, 4 offices, separate sex accessible restrooms, a break room, two treatment rooms, a storage room, a doctor reading room, and a reception area], installation of new and relocated doors in specified locations, new lighting throughout, new plumbing, new mechanical, and interior finishes in compliance with ch. 8 of the IBC. This building is not fire sprinklered and has no rated corridors. Rated corridors are not required based on no corridor exceeding 30 occupants (1017.1 2006 IBC). **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/2/20091/2/20091/14/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/19/20081/2/2009 DONE
FIRE-Final Inspection12/18/200812/19/200812/19/2008APASS
DetailsForrest France
Two exit signs repaired while on site, hardware at the exit doors to the lobby and main corridor outside the permit scope of work to be changed to lever style prior to occupancy as discussed with contractor.
BLD-Final12/18/200812/19/200812/19/2008PPASS
DetailsJim Storey
craig Phone #: ###-####
Permanent Occupancy  12/19/2008 DONE
DetailsAlexandra L. DeYoung
BLD-Other12/6/200812/8/200812/8/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/6/2008 at 12:59:11 PM. Contact: ###-####. ceilling ok for cover.
BLD-Other12/2/200812/3/200812/3/2008AFAIL
DetailsJim Storey
greg - please call for access Phone #: ###-#### design to make the ceilling not a return plenum/ soport defusers.
BLD-Framing/Rough-in12/1/200812/2/200812/2/2008PDEFR
DetailsJim Storey
greg - please call for access Phone #: ###-#### ele did not pass.
BLD-Framing/Rough-in10/20/200810/21/200810/21/2008APASS
DetailsJim Storey
craig Phone #: ###-#### Note: please call 1/2 prior to inspection
Routing - PLAN CHECK9/18/2008 9/19/2008 PASS
DetailsTim L. Woodard
Talked with Architect and agreed to redline issues. Pending compliance with redlines plan was approved.
PLANS/APPL TAKEN TO FRONT DESK  9/19/2008 DONE
Case Summary (BLD)  9/19/2008 DONE
Print Occupancy Form  9/19/2008 DONE
DetailsAlexandra L. DeYoung
Print Occupancy Form  9/19/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  9/19/2008 DONE
DetailsAlexandra L. DeYoung
Called Mike F. at ###-####, permit ready, fees given
Permit Ready to Issue  9/19/2008 DONE
DetailsAlexandra L. DeYoung
Issue PAID IN FULL permit  9/19/2008  
Plan assigned to (TLW)8/19/2008 9/19/2008 PASS
DetailsTim L. Woodard
9/19/2008 09:46:38 TLW - activity updated through activity BLDA022 from case BLD08-01782.
Routing - FIRE9/16/2008 9/18/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  9/18/2008 FAIL
Failed Plan Check
Routing - PLAN CHECK8/26/2008 9/16/2008 FAIL
DetailsTim L. Woodard
Routing - PLUMBING8/19/2008 8/26/2008 PASS
DetailsBill VanDegrift
EYEWASH MUST BE SUPPLIED FROM UPSTREAM OF THE R.P.. LABLE SINK IN EXAM/TREATRMENT ROOMS NON-POTABLE PER SECTION 603.4.12. INSTALL BFP-1 OVER SS-1.
Routing PW Sewer Rating8/19/2008 8/19/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS8/19/2008 8/19/2008 PASS
DetailsBeverly Hall
Pending Assignment by JCB8/18/2008 8/19/2008 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  8/18/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/18/2008 DONE
DetailsTisha Gallop
Application received 8/15/2008