Second Notice | | 2/7/2010 | 2/16/2010 | | DONE |
|
|
|
This permit finaled on the web by Bert Wallis
|
First Notice | | 1/21/2010 | 1/28/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/11/2010 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 1/6/2010 | | |
|
|
|
|
BLD-Final | 12/2/2009 | 12/3/2009 | 12/3/2009 | A | PASS |
Jim Sly
|
|
|
Burt Wallace Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/23/2009 | 4/24/2009 | 4/24/2009 | P | PART |
Jim Sly
|
|
|
Burt Phone #: ###-#### OK for Temp Occ. C/N....Problem with groundwater at restrooms under slab concrete allowing the concrete to stay damp. Need time to dry out befor installing vinyl. OK for Perm Occ. when vinyl installed in restrooms.
|
FIRE-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 | A | PASS |
Forrest France
|
|
|
Correction notice items field verified for compliance, fire life safety passed, notified contractor.
|
BLD-Conference | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | CANC |
Jim Sly
|
|
|
Burt Phone #: ###-####
|
BLD-Final | 4/22/2009 | 4/23/2009 | 4/23/2009 | P | CANC |
Jim Sly
|
|
|
Burt Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide current inspection tags for the fire extinguishers and provide exit discharge lighting as per the approved plans.
|
BLD-Final | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | FAIL |
Jim Sly
|
|
|
Burt Phone #: ###-#### Need fire/life and Fire finals.
|
BLD-Final | 4/16/2009 | 4/17/2009 | 4/17/2009 | A | NR |
Jim Sly
|
|
|
Burt Phone #: ###-#### Need fire finals
|
BLD-Final | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PEND |
Jim Sly
|
|
|
Called Rod left VM.....
|
BLD-Framing/Rough-in | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Jim Sly
|
|
|
rod Phone #: ###-####
|
BLD-Conference | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | DONE |
Jim Sly
|
|
|
rod Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/7/2008 | | |
|
|
|
|
Telephone call | | | 9/25/2008 | | DONE |
|
|
|
left vm for wayne hunsucker at ###-#### - permit ready and fees given - also need rp name
|
Permit Ready to Issue | | | 9/25/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/9/2008 | | 9/24/2008 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the resubmittal review.
|
Plan assigned to (CJW) | 8/21/2008 | | 9/24/2008 | | PASS |
Carl Westfall
|
|
|
9/24/2008 11:18:53 CJW - activity updated through activity BLDA022 from case BLD08-01791.
|
Routing - PUBLIC WORKS | 9/24/2008 | | 9/24/2008 | | PASS |
Louise Waldorf
|
|
|
Two drinking fountains added.
|
Routing - PLAN CHECK | 9/24/2008 | | 9/24/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/24/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/22/2008 | | |
Carl Westfall
|
|
|
Received 1 cover transmittal, 1 copy of e-mail from Carl W to Wayne Hunsucker dated 9-8-08, 2 copies of sheets A-1, A-3 and taken to Carl Westfall///9-22-08 @ 10:00am BAS
|
Route to Impact Fee Review | 9/8/2008 | 9/11/2008 | 9/9/2008 | | PASS |
Cindy M. Gould
|
|
|
Expansion is into existing building no impact fees
|
Routing - FIRE | 9/8/2008 | 9/8/2008 | 9/9/2008 | | PASS |
Scott Arellano
|
|
|
See attached IFC fire review notes.
|
1st review completed | | | 9/9/2008 | | FAIL |
|
|
|
Fail plan check
|
Routing - PLAN CHECK | 8/27/2008 | | 9/8/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on September 5, 2008 and was finished on September 8, 2008. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 8/27/2008 | | 8/27/2008 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - Approved.
|
Routing - PLAN CHECK | 8/22/2008 | | 8/27/2008 | | |
Jason Blais
|
|
|
Needs to route to Planning first.
|
Routing - Erosion and Sediment | 8/21/2008 | | 8/22/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00704
|
Pending Assignment by JCB | 8/19/2008 | | 8/21/2008 | | DONE |
Jason Blais
|
|
|
|
Pending Assignment by MYS | 8/19/2008 | | 8/21/2008 | | BLDA |
Jason Blais
|
|
|
8/21/2008 12:03:01 JCB - activity updated through activity BLDA172 from case BLD08-01791.
|
Routing - PUBLIC WORKS | 8/21/2008 | | 8/21/2008 | | PASS |
Beverly Hall
|
|
|
|
Additional plans submitted | | | 8/21/2008 | | |
Tisha Gallop
|
|
|
Received ESC application and Waiver Request letter//taken to Jason Blais
|
Routing PW Sewer Rating | 8/21/2008 | | 8/21/2008 | | PASS |
Louise Waldorf
|
|
|
|
Telephone call | | | 8/20/2008 | | DONE |
Jason Blais
|
|
|
Left message stating an Erosion & Sediment Control Application is required. A letter requesting a waiver from providing an ESC plan is also needed. Also e-mailed the application and example waiver letter to the architect.
|
Application received | | 8/19/2008 | 8/19/2008 | | DONE |
Marsha Smylie
|
|
|
|