Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-01796
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 234 S WHISPERWOOD
Project Name 
Customer Number 
ePlanReviewNo
Description
The MEP Group Office Shell - To construct a new 11,580 square foot, one story with a 1,445 square foot mezzanine, wood framed office shell building and related site improvements. This building is designed for two future office tenant spaces. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/8/20099/11/2009 DONE
Telephone call  9/11/2009 DONE
DetailsTisha Gallop
called GC Travis Shelton for breakdown of plumbing values, left voice message
Third Notice 8/11/20099/8/2009 DONE
Second Notice 7/22/20098/11/2009 DONE
First Notice6/1/20096/1/20097/22/2009 DONE
DetailsTom Arcoraci
BLD-Final6/1/20096/1/20096/1/2009PPASS
DetailsTom Arcoraci
travis Phone #: ###-####
DOC - Permit Finaled6/1/20096/1/20096/1/2009PPASS
DetailsTom Arcoraci
Zoning Approval5/29/20095/29/20096/1/2009 PASS
DetailsJosh Wilson
FIRE-Final Inspection5/29/20095/29/20095/29/2009PPASS
DetailsForrest France
Shell building fire life safety inspection completed satisfactory.
FIRE-Final Inspection5/22/20095/26/20095/26/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need addressed. I also noted that the building address was not installed and the one hour rated fire riser room did not have the piping penatrations fire caulked. No other items have been inspected.
PubWorks Occupancy Approval5/26/20095/26/20095/26/2009 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in5/22/20095/22/20095/22/2009PPASS
DetailsTom Arcoraci
Justin Please call 30 min before going out he is ready any time. Phone #: ###-####
FIRE-Final Inspection5/21/20095/22/20095/22/2009ANR
DetailsForrest France
Project related fire alarm permit work has not been requested for inspection to date (as of 12:00 pm on 5/22). Fire alarm work must be completed, pre-tested and called for final prior to building life safety approval.
Zoning Approval5/21/20095/22/20095/22/2009 FAIL
DetailsJosh Wilson
BLD-Conference5/21/20095/21/20095/21/2009PPASS
DetailsTom Arcoraci
BLD-Concrete5/21/20095/21/20095/21/2009PPASS
DetailsTom Arcoraci
Justin Please call 30 min before going out Phone #: ###-####
BLD-Other3/17/20093/18/20093/18/2009APASS
DetailsTom Arcoraci
BLD-Energy code compliance3/16/20093/17/20093/17/2009PPASS
DetailsTom Arcoraci
BLD-Energy code compliance3/16/20093/17/20093/17/2009APART
DetailsTom Arcoraci
Jose Phone #: ###-####
BLD-Framing/Rough-in3/13/20093/13/20093/13/2009PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in3/11/20093/13/20093/13/2009APART
DetailsTom Arcoraci
jose Phone #: ###-#### or dustin at ###-####
BLD-Framing/Rough-in2/20/20092/23/20092/23/2009PPASS
DetailsTom Arcoraci
jose - roof Phone #: ###-####
BLD-Framing/Rough-in2/19/20092/19/20092/19/2009PPART
DetailsTom Arcoraci
dustin Phone #: ###-#### wall and roof nailing ok
BLD-Aging Inspection2/18/20092/18/20092/18/2009 PASS
DetailsTom Arcoraci
BLD-Footing12/18/200812/19/200812/19/2008PPART
DetailsTom Arcoraci
jose Phone #: ###-#### wip ok
Issue PAID IN FULL permit  12/1/2008 DONE
OVERRIDE  10/21/2008  
Routing - PLANNING Land Div10/13/2008 10/21/2008 PASS
DetailsTodd Tucker
The ROS has been approved and recorded and the Vacation of Plat Note and Easement has been approved by the City Council.
Routing - PLAN CHECK10/21/2008 10/21/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/21/2008 DONE
DetailsJohn Menard
Inspection Record Card- Bld  10/21/2008 DONE
Details
Telephone call  10/21/2008 DONE
Details
left vm for cornell larson at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  10/21/2008 DONE
Details
Plan assigned to (JCM)8/20/2008 10/21/2008 PASS
DetailsJohn Menard
10/21/2008 09:43:56 JCM - activity updated through activity BLDA022 from case BLD08-01796.
Routing - FIRE10/10/2008 10/13/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans.
Plan resubmittals received  10/13/2008  
received "3" sets of response letters from lochsa eng with (3) pages each, "3" sets of structural calcs (11) pages each.. also "3" sets of each sheet of SO.O1, S1.O1, S1.O2, S1.O3, S5.O3, S7.O1--plans taken to fire
Routing - PLAN CHECK10/13/2008 10/13/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  10/13/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Routing - PLAN CHECK9/19/2008 10/10/2008  
DetailsJohn Menard
Plan Reviewer's activity  10/10/2008 PASS
DetailsJohn Menard
Reviewed and approved nonstructural revisions. JCM
Plan resubmittals received  9/26/2008  
DetailsJohn Menard
Rec'd 1 response letter for structural and 1 for fire, and 2 copies of pages a-5, a-6, a-11; inserted by Cornel Larsen and taken back to John Menard
Routing - FIRE9/17/20089/17/20089/19/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  9/19/2008 FAIL
Failed PW,Structural, Plan Check, Fire
Route to Impact Fee Review9/17/20089/22/20089/17/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK9/15/2008 9/17/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  9/17/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plans review comment list requesting revisions. JCM
Routing - PUBLIC WORKS9/10/2008 9/16/2008 PASS
DetailsBeverly Hall
Routing PW Drainage9/11/2008 9/15/2008 PASS
DetailsBrian Murphy
Plan resubmittals received  9/15/2008  
Received letter and three copies if C2.01, C3.01, C4.01; inserted into plans by eng. rep. and taken back to Brian Murphy
Routing - PLAN CHECK9/8/2008 9/10/2008  
DetailsJohn Menard
Routing - PLANNING9/5/2008 9/8/2008 PASS
DetailsJosh Wilson
DRH08-00197 Josh Wilson CUP02-00071
Routing Off Site - STRUCTURAL8/20/2008 9/5/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING8/28/2008 9/5/2008 PASS
DetailsBill VanDegrift
see bld08-01797 for comments
Plan resubmittals received  9/5/2008  
DetailsJohn Menard
Received 2 cover transmittal sheets, 1 letter dated 9-4-08 to Brian Murphy from Ryan Carnie, 2 copies of O & M manuals, 2 copies of drainage calculations, 5 copies of sheets C2.01, C3.01, C4.01 brought over by Brian Murphy as they were dropped off at Public Works///9-5-08 BAS
Telephone call  9/5/2008 DONE
Called Ryan Larsen with Lochsa Engineering and informed him someone needed to come down and insert the plans. He said he would take care of it...9-5-08 @ 11:00am BAS
Plan resubmittals requested  9/5/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals received  8/28/2008  
DetailsTisha Gallop
Received transmittal, groundwater clarification letter, revised seepage bed detail, Geotechnical report sheets, two sets of 11" x 17" copies of plan sheets C2.01, C4.01; inserted into plans by LEG and taken back to Erosion
Routing - Erosion and Sediment8/27/2008 8/28/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00700
Routing - PUBLIC WORKS8/25/2008 8/27/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage8/25/2008 8/27/2008 FAIL
DetailsBrian Murphy
NEED TO INSURE NO STORMWATER BYPSSES THE SAND FILTER REVISE O AND M PLAN AND GIVE FINANAL GROUND WATER EST. BRIAN MURPHY
Routing PW Street Lights  8/27/2008 PASS
DetailsHank Alarcon
Routing PW Sewer Rating8/25/2008 8/27/2008 PASS
DetailsLouise Waldorf
Routing PW Solid Waste  8/27/2008 PASS
DetailsPeter J. McCullough
Routing - PLANNING Land Div8/20/2008 8/25/2008 PEND
DetailsTodd Tucker
Do not issue Building Permit until the associated property line adjustment (ROS08-00027) and vacation of easement and plat note (SOS08-00007) have been approved.
Application received 8/20/20088/20/2008 DONE
Pending Assignment by JCM8/20/2008 8/20/2008 BLDA
DetailsJohn Menard
8/20/2008 10:35:26 JCM - activity updated through activity BLDA166 from case BLD08-01796.
Telephone call  8/20/2008 DONE
DetailsAlexandra L. DeYoung
Called Action Couriers for pick up
Plans ACCEPTED BY PLAN TECH  8/20/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  8/20/2008 DONE
DetailsAlexandra L. DeYoung
Plan routing begun/NEW & ADDTN  8/20/2008 DONE
DetailsAlexandra L. DeYoung