BLD-Aging Inspection | 3/16/2010 | 3/16/2010 | 3/17/2010 | | DONE |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
|
DOC - Permit Expired | 3/17/2010 | 3/17/2010 | 3/17/2010 | P | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
|
BLD-Aging Inspection | 1/14/2010 | 1/14/2010 | 1/14/2010 | | NR |
Jim Storey
|
|
|
pending ele w/cn
|
BLD-Framing/Rough-in | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | PASS |
Jim Storey
|
|
|
kyle Phone #: ###-#### firewall patched ok
|
BLD-Energy code compliance | 10/9/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Jim Sly
|
|
|
kyle Phone #: ###-#### Energy code OK ..... Misc framing corrections completed. Re-call for inspection of (2) layers continuous 5/8 rock behind proposed medicine cabinets at rated firewall.
|
BLD-Final | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | FAIL |
Jim Storey
|
|
|
kyle Phone #: ###-#### need ele ri/ flue clearance/ firewall repair.
|
BLD-Framing/Rough-in | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PART |
Jim Storey
|
|
|
Kyle Phone #: ###-#### beams and floor joist ok to lay decking.
|
Telephone call | | | 8/29/2008 | | DONE |
Barbara Stitt
|
|
|
Todd with Dodder Construction called and the value was charged higher than should have been. He is stating that the value should be $20,000 and after talking with my supervisor (Rita DeYoung) it was determined that at the end of the project Todd can turn in a final value with a request for a refund to Rita to offset the initial valus and fees///8/29/08 BAS
|
Routing Walk-In (BLD) | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | DONE |
Marsha Smylie
|
|
|
8/27/2008 14:47:57 MLS - activity updated through activity BLDC405 from case BLD08-01821.
|
Routing Walk-In (BLD) | 8/22/2008 | 8/22/2008 | 8/27/2008 | P | DONE |
Marsha Smylie
|
|
|
8/27/2008 13:54:29 MLS - activity updated through activity BLDI252 from case BLD08-01821.
|
Case Summary (BLD) | | | 8/27/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/27/2008 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 8/22/2008 | | | |
|
|
|
|