Second Notice | | 7/3/2010 | 7/9/2010 | | DONE |
Tisha Gallop
|
|
|
Per Mark Bowen/GC send final fees to tenant.
|
First Notice | | 5/31/2010 | 6/23/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/21/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/18/2010 | 5/19/2010 | 5/19/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Conference | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | DONE |
Scott Arellano
|
|
|
*ON SITE VISIT* The exterior building measurements that I took indicate a building length of 150.5 feet and a width of 51 feet; for a total fire flow calculation area of 7,676 sq.ft.. The fire flow documentation provided indicates an available fire flow of 2,250 gpm, which is adequate for type VB construction up to 7,700 sq.ft.. No fire flow reduction is necessary for the addition to this building; and therefore the existing fire protection systems are treated as non-required fire protection.
However, for City records this building shall not be considered a fully fire sprinklered building, and therefore will not qualify for any provisions of the IBC or IFC which would otherwise be predicated on a fully fire sprinklered building. Additionally, the existing alternative extinguishing system, located in the data center room would not qualify for any code reductions as if it were a fully fire sprinklered building.
|
BLD-Aging Inspection | 5/10/2010 | 5/10/2010 | 5/10/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/8/2010 | 3/8/2010 | 3/8/2010 | | PART |
Tom Arcoraci
|
|
|
waiting on sprinkler issue
|
BLD-Final | 1/5/2010 | 1/5/2010 | 1/5/2010 | A | PASS |
Jim Storey
|
|
|
final ok
|
BLD-Final | 12/21/2009 | 12/21/2009 | 12/21/2009 | A | PART |
Jim Storey
|
|
|
Please call 1 hour prior to inspection so I can arrange access to the building. Thank you, Mark Phone #: ###-#### Internet Inspection Request from: Mark Bowen need final letter for si/ no card on site final will be ok upon si report review.
|
FIRE-Final Inspection | 12/17/2009 | 12/18/2009 | 12/18/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 12/7/2009 | 12/7/2009 | 12/7/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide signage on both doors as discussed and repair the existing exit signs. Per Mark and the electricain the electrical service is under the 1,200 amp thres hold for the panic hardware requirement.
|
BLD-Aging Inspection | 10/5/2009 | 10/5/2009 | 10/5/2009 | | PASS |
Tom Arcoraci
|
|
|
|
Zoning Approval | 7/13/2009 | 7/13/2009 | 7/13/2009 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 6/19/2009 | 6/19/2009 | 6/19/2009 | | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Aging Inspection | 4/14/2009 | 4/14/2009 | 4/14/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 2/11/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Tom Arcoraci
|
|
|
Please call 30 min. prior to arrival. Thank you Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
BLD-Aging Inspection | 1/29/2009 | 1/29/2009 | 1/29/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PASS |
Tom Arcoraci
|
|
|
Concrete scheduled for 10:00AM Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
BLD-Footing | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mark Bowen
|
Issue PAID IN FULL permit | | | 11/6/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Print Occupancy Form | | | 10/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2008 | | DONE |
|
|
|
left vm for walter lindgram at ###-#### - permit ready and fees given - also need rp name and ACHD receipt
|
Permit Ready to Issue | | | 10/17/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2008 | | PASS |
Jason Blais
|
|
|
For Tim Woodard.
|
Plan assigned to (TLW) | 8/28/2008 | | 10/16/2008 | | PASS |
Tim L. Woodard
|
|
|
10/16/2008 13:08:41 JCB - activity updated through activity BLDA022 from case BLD08-01847.
|
Routing - PLAN CHECK | 10/6/2008 | | 10/16/2008 | | PASS |
Jason Blais
|
|
|
Resubmittal items addressed per Tim Woodard's plan review.
|
Route to Impact Fee Review | 10/15/2008 | 10/20/2008 | 10/15/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 10/15/2008 | | DONE |
Jason Blais
|
|
|
Received updated structural calculations via e-mail.
|
Telephone call | | | 10/15/2008 | | DONE |
Jason Blais
|
|
|
Called engineer to have him e-mail the one page structural calculation to reference the 2006 International Building Code. (Resubmittal document states 2003)
|
Plan resubmittals received | | | 10/14/2008 | | |
Tim L. Woodard
|
|
|
Rec'd one transmittal letter, 2 response letters, and 3 copies of pages A1.1, A4.1, and S0.01; inserted by arch rep; taken to Tim W
|
Routing - FIRE | 10/3/2008 | 10/6/2008 | 10/6/2008 | | PASS |
Kenneth R Roule
|
|
|
See attached IFC fire review notes.
|
1st review completed | | | 10/6/2008 | | FAIL |
|
|
|
Plan check.
|
Routing - PLAN CHECK | 9/8/2008 | | 10/3/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report.
|
Routing - PLANNING | 9/7/2008 | | 9/8/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH08-00267
|
Routing - PLUMBING | 9/2/2008 | | 9/7/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 8/29/2008 | | 9/2/2008 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00725
|
Routing PW Sewer Rating | 8/29/2008 | | 8/29/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2008 | | 8/29/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING Land Div | 8/28/2008 | | 8/29/2008 | | PASS |
Todd Tucker
|
|
|
The property is in the same configuration now as it was prior to 1965.
|
Pending Assignment by JCM | 8/28/2008 | | 8/28/2008 | | BLDA |
John Menard
|
|
|
8/28/2008 16:23:59 JCM - activity updated through activity BLDA185 from case BLD08-01847.
|
Plan routing begun/NEW & ADDTN | | | 8/28/2008 | | |
|
|
|
|
Application received | | 8/27/2008 | 8/27/2008 | | DONE |
Marsha Smylie
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2008 | | |
Marsha Smylie
|
|
|
|