Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01871
StatusFinaled
Name IRONHEAD CONSTRUCTION
Site Address 6776 W VICTORY RD
Project NameHORTON FLUID POWER
Customer Number 
ePlanReviewNo
Description
Horton Fluid Power - To construct a new 11,525 square foot, one story with 760 square foot mezzanine, pre-engineered steel building and related site improvements. This building is for a 9,075 square foot Maintenance and Repair shop and a 2,450office first floor office with 760 square foot mezzanine office and storage area. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. DRH08-00159 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/11/20098/21/2009 DONE
Second Notice 7/24/20098/11/2009 DONE
First Notice 7/8/20097/24/2009 DONE
Permanent Occupancy UNPAID FEE  7/8/2009 DONE
DetailsTisha Gallop
Zoning Approval7/6/20097/6/20097/7/2009 DONE
DetailsMatthew A Halitsky
Lack of perimeter landscaping OK per S. Schafer.

BLD-Final7/1/20097/2/20097/2/2009PPASS
DetailsTom Arcoraci
Mike Phone #: ###-####
FIRE-Final Inspection7/1/20097/2/20097/2/2009APASS
DetailsTroy Cobbley
Life safety passed. The racks will be limited to no more than 8'-0" in height.
PubWorks Occupancy Approval7/2/20097/2/20097/2/2009 DONE
DetailsTiffany Lowery
Zoning Approval Temp7/2/20097/2/20097/2/2009 FAIL
DetailsMatthew A Halitsky
Bond needed for replacing gravel with bark, add awnings.
BLD-Other6/15/20096/15/20096/15/2009PPASS
DetailsTom Arcoraci
BLD-Other6/12/20096/15/20096/15/2009APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/12/2009 at 2:00:52 PM. Contact: ###-####.
BLD-Other5/7/20095/7/20095/7/2009PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/7/2009 at 10:19:27 AM. Contact: ###-####.
BLD-Energy code compliance4/30/20095/1/20095/1/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/30/2009 at 5:08:40 PM. Contact: ###-####.
BLD-Conference4/22/20094/22/20094/22/2009PPASS
DetailsTom Arcoraci
Mike Phone #: ###-####
BLD-Other3/20/20093/20/20093/20/2009PPASS
DetailsTom Arcoraci
BLD-Other3/18/20093/19/20093/19/2009APASS
DetailsTom Arcoraci
Mike- roof drain Phone #: ###-####
BLD-Concrete3/13/20093/16/20093/16/2009PPASS
DetailsTom Arcoraci
mike - rebar Phone #: ###-####
BLD-Foundation1/14/20091/15/20091/15/2009APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/14/2009 at 4:58:42 PM. Contact: ###-####.
BLD-Footing1/9/20091/12/20091/12/2009PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/9/2009 at 4:53:01 PM. Contact: ###-####. wip ok
BLD-Footing1/5/20091/5/20091/5/2009PPASS
DetailsTom Arcoraci
mike Note: rebar Phone #: ###-####
BLD-Footing12/22/200812/23/200812/22/2008ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/22/2008 at 4:55:01 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 22 2008 5:04PM.
BLD-Footing12/19/200812/22/200812/22/2008PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/19/2008 at 4:58:16 PM. Contact: ###-####. wip footings ok
BLD-Footing12/16/200812/17/200812/17/2008PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/16/2008 at 4:45:25 PM. Contact: ###-####.
Issue PAID IN FULL permit  11/21/2008 DONE
OVERRIDE  11/12/2008  
Routing - PLAN CHECK11/3/2008 11/12/2008 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL11/7/2008 11/12/2008 PASS
DetailsJohn Menard
called Action Couriers for pick up - Received letter from consulting structural engineer approval resubmitted, revised structural documents. JCM
Plan Reviewer's activity  11/12/2008 PASS
DetailsJohn Menard
Reviewed and approved resubmitted, revised plan sheets with red lined notes. JCM
PLANS/APPL TAKEN TO FRONT DESK  11/12/2008 DONE
DetailsJohn Menard
Print Occupancy Form  11/12/2008 DONE
Details
Telephone call  11/12/2008 DONE
Details
t/c w dion zimmerman at ###-#### - permit ready and fees given - also need ACHD receipt and rp name
Override - People Holds  11/12/2008  
Permit Ready to Issue  11/12/2008 DONE
Details
Plan assigned to (JCM)9/2/2008 11/12/2008 PASS
DetailsJohn Menard
11/12/2008 14:28:02 JCM - activity updated through activity BLDA022 from case BLD08-01871.
Plan resubmittals received  11/5/2008  
DetailsJohn Menard
Rec'd two response letters, three copies of structral calcs, and three copies of sheets S1.0, S2.0 and A3.0; inserted by arch rep; taken back to John M
Plan resubmittals requested  11/3/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structural review requesting additional revisions. JCM
Routing - FIRE10/29/2008 11/3/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing Off Site - STRUCTURAL10/24/2008 10/31/2008 FAIL
DetailsJohn Menard
called Action Couriers for pick up - Received correction list from the consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  10/30/2008  
received "2" sheets each of C2.O1, C2.O2, A1.O, A3.O, A4.O, & S1.O--plans taken back to Scott Arrellano--inserter is Jo Larson
Routing - PLAN CHECK10/27/2008 10/29/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  10/28/2008 DONE
DetailsJohn Menard
E-mailed the architect a letter requesting additional revisions. JCM
Routing - PLUMBING10/22/2008 10/27/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  10/23/2008  
DetailsJohn Menard
Rec'd a response letter, structural cals and 1 copy of page S1.0 and S2.0; taken to John M.
Routing PW Drainage  10/22/2008 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS10/21/2008 10/22/2008 PASS
DetailsBeverly Hall
Plan resubmittals requested  10/21/2008 DONE
DetailsJohn Menard
E-mailed the architect requesting a third set of structural revisions. JCM
Routing PW Solid Waste10/21/2008 10/21/2008 PASS
DetailsPeter J. McCullough
Routing PW Environmental10/21/2008 10/21/2008 PASS
DetailsTerry Alber
Routing - PLAN CHECK10/13/2008 10/21/2008  
DetailsJohn Menard
Plan resubmittals received  10/20/2008  
DetailsJohn Menard
Rec'd two copies of HAZMAT report and two copies of sheet G1.0; insterted by arch rep; taken to John M
Plan resubmittals received  10/17/2008  
DetailsBarbara Stitt
Received 2 copies of letter to Bill VanDeGrift, Scott Arellano with a copy of CCNR's attached, John Menard, Peter McCullough, structural calcs, ground water research letter, drainage report, O & M, sheets C1.0, C2.01, C2.02, A1.0, A3.0, A4.0, S1.0, S2.0, P1.1, P2.1, P3.1 and inserted into plans by Zimmerman's office then returned to John Menard's desk///10-17-08 @ 3:20pm BAS
Routing - FIRE10/7/200810/7/200810/13/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  10/13/2008 FAIL
Failed PW, Structural, Plumbing, Planning, Plan Check, Fire
Route to Impact Fee Review10/9/200810/14/200810/9/2008 PASS
DetailsCindy M. Gould
Plan resubmittals requested  10/7/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK9/18/2008 10/7/2008 FAIL
DetailsJohn Menard
John Menard
Routing - PLANNING9/12/2008 9/18/2008 PASS
DetailsMatthew A Halitsky
DRH08-00159 Matt Halitsky

Routed to Plan Check (John M.)
Routing - PLUMBING9/10/2008 9/12/2008 FAIL
DetailsBill VanDegrift
provide approved interceptor detail, show venting. trap and vent area drain upstream of the interceptor. show water line and r.p. to wash bay. show required drinking fountain.
Routing - Erosion and Sediment9/9/2008 9/10/2008 PASS
DetailsClint A Smith
ESC plan waiver approved with attched conditions. ESC08-00732
Routing - PUBLIC WORKS9/4/2008 9/9/2008 FAIL
DetailsLouise Waldorf
Routing PW Solid Waste9/8/2008 9/9/2008 FAIL
DetailsPeter J. McCullough
Details are required on the trash enclosure. See the Solid Waste Plan Submittal Checklist at www.cityofboise.org/Departments/Public_Works/NewDevelopmentPermitApps/page29449.aspx.
Also, confirmation is required that storage yard leading to trash enclosure will be paved.
Routing PW Environmental  9/9/2008 FAIL
DetailsTerry Alber
SHOW WASH PAD & INTERCEPTOR ON REVISED PLUMBING PLANS
Plan resubmittals requested  9/8/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL9/2/2008 9/8/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing PW Drainage  9/8/2008 FAIL
DetailsBrian Murphy
NEED MORE INFO IN GEO TECH REPORT AND DESIGN FOR BYPASS OF SAND FILTER IN DESIGN.. BRIAN MURPHY ###-####
Routing PW Sewer Rating9/8/2008 9/8/2008 PASS
DetailsLouise Waldorf
Routing PW Street Lights9/4/2008 9/5/2008 PASS
DetailsHank Alarcon
Routing PW Sewer Design9/4/2008 9/4/2008 PASS
DetailsJon R. Gunnerson
Connect onto 4-inch service provided.
Routing - PLANNING Land Div9/3/2008 9/4/2008 PASS
DetailsTodd Tucker
Parcel is a platted lot in a subdivision.
Plan routing begun/NEW & ADDTN  9/3/2008 DONE
DetailsTisha Gallop
Telephone call  9/2/2008 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Plans ACCEPTED BY PLAN TECH  9/2/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/2/2008 DONE
DetailsTisha Gallop
Pending Assignment by JCM9/2/2008 9/2/2008 DONE
DetailsJohn Menard
9/2/2008 11:13:35 JCM - activity updated through activity BLDA166 from case BLD08-01871.
Application received 8/29/2008   
DetailsTisha Gallop