Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD08-01872
StatusFinaled
Name ZARIAN & MIDGLEY
Site Address 960 S BROADWAY AVE Unit: 240
Project NameUniversity Plaza
Customer Number 
ePlanReviewNo
Description
(ZARIAN & MIDGLEY - University Plaza - STE#240) Permit to expand and existing 1,985 square foot tenant space (STE#240) into the adjoining 3,525 square foot tenant space (STE#250). Space will be used for Offices and accessory uses. This use is defined as an B occupancy. Work to include: [construction of interior non-bearing walls to reconfigure offices within the space also to create a 355 square foot conference room], new hardware as needed, new doors, relocating lighting (no new wattage added), relocate ducts and diffusers, and installation of interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20093/16/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/5/20081/2/2009 DONE
Permanent Occupancy UNPAID FEE  12/5/2008  
BLD-Final12/2/200812/3/200812/3/2008PPASS
DetailsJim Storey
Matt Phone #: ###-####
FIRE-Final Inspection12/2/200812/3/200812/3/2008APASS
DetailsForrest France
Correction notice completed, fire life safety finaled.
FIRE-Final Inspection12/1/200812/2/200812/2/2008AFAIL
DetailsForrest France
Missing one exit sign, need to remove directional arrow at one exit sign, fire alarm and sprinkler permits finaled.
BLD-Final12/1/200812/2/200812/2/2008PCANC
DetailsJim Storey
Matt Phone #: ###-####
FIRE-Conference12/1/200812/1/200812/1/2008PDONE
DetailsForrest France
Regarding project related fire alarm work.
BLD-Framing/Rough-in10/13/200810/14/200810/14/2008APASS
DetailsJim Storey
matt Phone #: ###-####
Issue PAID IN FULL permit  9/22/2008 DONE
Print Occupancy Form  9/18/2008 DONE
Details
Telephone call  9/18/2008 DONE
Details
left vm for kirk moris at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  9/18/2008 DONE
Details
Plan assigned to (TLW)  9/17/2008 PASS
DetailsTim L. Woodard
9/17/2008 13:44:06 TLW - activity updated through activity BLDA022 from case BLD08-01872.
Routing - PLAN CHECK9/3/2008 9/17/2008 PASS
DetailsTim L. Woodard
Routing - FIRE  9/17/2008 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  9/17/2008 PASS
Case Summary (BLD)  9/17/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/17/2008 DONE
Routing - PUBLIC WORKS9/2/2008 9/3/2008 PASS
DetailsBeverly Hall
Plans ACCEPTED BY PLAN TECH  9/2/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  9/2/2008 DONE
DetailsAlexandra L. DeYoung
Application received 8/29/2008