Permit Information
Permit NumberBLD08-01944
StatusFinaled
Name CM COMPANY
Site Address 6052 W STATE ST
Project NamePRIMARY HEALTH MEDICAL CLINIC
Customer Number 
ePlanReviewNo
Description
Primary Health Medical Clinic - To construct a new 13,060 square foot, one story, wood framed medical office clinic and related site improvements. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/27/2012 DONE
Third Notice 12/30/20091/13/2010 DONE
Third Notice 12/9/200912/16/2009 DONE
faxed, called and mailed
Telephone call  12/16/2009 DONE
DetailsTisha Gallop
called and left vm for Jackie/CM Company need fv
Telephone call  12/16/2009 DONE
DetailsTisha Gallop
received phone call from Jackie/CM Co. she said owner Primary Health wants to fill out FV and she has forwarded all previous request to him, but still no response. She said she would do it again and keep me updated on progress. I told her he needs to get that in because we have been asking for it for a couple of months already.
Third Notice 10/31/200911/5/2009 DONE
DetailsBarbara Stitt
Second Notice 9/28/200910/21/2009 DONE
First Notice 5/28/20099/18/2009 DONE
PubWorks Occupancy Approval5/29/20095/29/20095/29/2009 DONE
DetailsTiffany Lowery
BLD-Final5/28/20095/28/20095/28/2009PPASS
DetailsTony Young
Brian Phone #: ###-####
Zoning Approval5/28/20095/28/20095/28/2009 PASS
DetailsJosh Wilson
Permanent Occupancy UNPAID FEE  5/28/2009 DONE
Permanent Occupancy UNPAID FEE  5/28/2009 DONE
FIRE-Final Inspection5/21/20095/21/20095/21/2009PPASS
DetailsTroy Cobbley
LIfe safety passed.
BLD-Conference5/20/20095/20/20095/20/2009PPART
DetailsTony Young
Brian Phone #: ###-####
need to get counter top heights resolved w/ architect,, need trades,,
FIRE-Final Inspection5/19/20095/20/20095/20/2009AFAIL
DetailsTroy Cobbley
Provide fire dept access signage as discussed and provide an exit sign over the exterior breakroom door as shown on the approved plans. All other items ok.
BLD-Framing/Rough-in4/10/20094/13/20094/13/2009APASS
DetailsTony Young
brian - ceiling for cover Phone #: ###-####
grid ok
BLD-Other4/9/20094/10/20094/10/2009PNR
DetailsTom Arcoraci
Brian- ceiling cover Phone #: ###-####
BLD-Framing/Rough-in2/24/20092/25/20092/25/2009APART
DetailsTony Young
Bruce Phone #: ###-####
interior walls ok,, x-ray room ok pending elec. pass,, recieved letter of ok on exterior sill bolting/pinning
BLD-Framing/Rough-in2/20/20092/20/20092/20/2009PPART
DetailsTony Young
bruce Phone #: ###-####
exterior walls ok to insulate, verify bolts in sill plate
BLD-Framing/Rough-in1/26/20091/27/20091/27/2009APART
DetailsTony Young
bruce-exterior wall framing inspection please Phone #: ###-####
exterior shear and brace panels ok
BLD-Other1/15/20091/16/20091/16/2009APASS
DetailsTony Young
bruce Note: roof nailing Phone #: ###-####
roof nailing ok
BLD-Foundation11/26/200812/1/200812/1/2008APART
DetailsTony Young
bruce Phone #: ###-####
south 1/2 of stem walls,, pending S. I. report
BLD-Footing11/24/200811/25/200811/25/2008APART
DetailsTony Young
bruce Phone #: ###-####
wip,, ok pending special inspection report,, south/west area of ftgs
BLD-Foundation11/20/200811/21/200811/21/2008APART
DetailsTony Young
BRUCE Phone #: ###-####
north 1/2 of walls,, ok pending s. i. report
BLD-Footing11/18/200811/19/200811/19/2008APART
DetailsTony Young
bruce Phone #: ###-####
ok pending S. I. report
BLD-Footing11/18/200811/18/200811/18/2008PCANC
DetailsTony Young
bruce Phone #: ###-####
BLD-Footing11/17/200811/18/200811/18/2008PPART
DetailsTony Young
bruce Phone #: ###-####
wip,, special inspector will look at also
Issue PAID IN FULL permit  10/28/2008 DONE
DetailsAlexandra L. DeYoung
Routing - FIRE10/21/2008 10/22/2008 PASS
DetailsKenneth R Roule
See IFC fire 2nd review notes attached.
Routing - PLAN CHECK10/22/2008 10/22/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/22/2008 DONE
Print Occupancy Form  10/22/2008 DONE
Details
Telephone call  10/22/2008 DONE
Details
left vm for trent koci at ###-#### - permit ready and fees given - also need ACHD receipt and RP name
Permit Ready to Issue  10/22/2008 DONE
Details
Plan assigned to (JCM)9/10/2008 10/22/2008 PASS
DetailsJohn Menard
10/22/2008 09:23:20 JCM - activity updated through activity BLDA022 from case BLD08-01944.
Routing - PLUMBING10/14/2008 10/21/2008 PASS
DetailsBill VanDegrift
water lines to storage/lab area may need to be piped to lab backflow preventers.
Routing - PLAN CHECK10/21/2008 10/21/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  10/21/2008 PASS
DetailsJohn Menard
Reviewed and approved resubmitted plan revisions. JCM
Plan resubmittals received  10/17/2008  
RECEIVED 1 MEMO AND 2 COPIES OF SHEETS M3.0,A1.1,P1.1,P2.1,C1.1,C2.1,C2.2,C3.1,C3.2,C3.3,C3.4,C4.1, P3.0 sent back to Plumbing inserted by Doug Simpson from BRS
Route to Impact Fee Review10/10/200810/15/200810/14/2008 PASS
DetailsCindy M. Gould
Routing - FIRE10/10/200810/10/200810/14/2008 FAIL
DetailsScott Arellano
See IFC fire review notes attached. Faxed a copy of report to architect.
1st review completed  10/14/2008 FAIL
Fail, Fire, Plumbing and plan check
Telephone call  10/14/2008  
Talked with architect about fire department access.Corretions will be made and resubmitted.
Plan Reviewer's activity  10/10/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Routing - PLAN CHECK10/9/2008 10/10/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  10/10/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLUMBING10/6/2008 10/9/2008  
Plan resubmittals received  10/6/2008  
DetailsJohn Menard
Rec'd 1 response letter and 3 copies of pages- P1.1, P2.1, P3.0; inserted by architect and taken back to John M.
Routing - PLAN CHECK10/2/2008 10/6/2008  
DetailsJohn Menard
John Menard
Routing - PLANNING10/1/2008 10/2/2008 PASS
DetailsJosh Wilson
REDLINES Sheets LS-1 and A4.1- Josh Wilson per DRH08-00202
Routing - PLUMBING9/30/2008 10/1/2008 FAIL
DetailsBill VanDegrift
locate hose bib at service downstream of r.p.. show water piping per note #1 page P2.1. L-1 requires mixing valve. not listed on fixture schedule. 2" R.P. on service requires a 4" floor sink to accept discharge.
Application received 9/9/20089/30/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00765
Routing - Erosion and Sediment9/29/2008 9/30/2008 PASS
DetailsSteven Webb
Routing - PUBLIC WORKS9/10/2008 9/29/2008 PASS
DetailsBeverly Hall
Plan resubmittals received  9/29/2008  
DetailsAlexandra L. DeYoung
Rec'd 3 copies of response letter and sheets- s2.1 and s7.1; Insterted by arch rep and taken back to public works///9-29-08 ALR
Routing PW Solid Waste9/29/2008 9/29/2008 PASS
DetailsPeter J. McCullough
Routing PW Environmental9/29/2008 9/29/2008 PASS
DetailsWalt Baumgartner
Treatment of silver bearing wastewater prior to discharge to sanitary sewer system to below 5 ppm is required or off-haul regualted wastewater via liscenced and approved haz waste contractor.
Routing PW Sewer Design9/17/2008 9/26/2008 PASS
DetailsJon R. Gunnerson
Install 8-inch cleanout at P/L, service is private.
Plan resubmittals received  9/26/2008  
DetailsTisha Gallop
Rec'd 2 copies of pages c2.2 and c3.1; Instered by eng. rep. and taken back to Jonothan Gunderson
Plan resubmittals requested  9/24/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL9/10/2008 9/23/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing PW Drainage9/11/2008 9/17/2008 PASS
DetailsBrian Murphy
Routing PW Street Lights  9/17/2008 PASS
DetailsHank Alarcon
Routing PW Sewer Rating9/11/2008 9/11/2008 PASS
DetailsConnie Baumgartner
Telephone call  9/10/2008 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Routing - PLANNING Land Div9/10/2008 9/10/2008 PASS
DetailsDave Abo
Approved. Lot 16, Block 1 of Davenport Village Subdivision.
Pending Assignment by JCM9/9/2008 9/10/2008 BLDA
DetailsJohn Menard
9/10/2008 08:25:45 JCM - activity updated through activity BLDA166 from case BLD08-01944.
Plans ACCEPTED BY PLAN TECH  9/9/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/9/2008 DONE
DetailsTisha Gallop
Plan routing begun/NEW & ADDTN  9/9/2008 DONE
DetailsTisha Gallop