Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD08-01953
StatusFinaled
Name BAR S CONSTRUCTION LLC
Site Address 4630 W STATE ST
Project NameWELLS FARGO
Customer Number 
ePlanReviewNo
Description
(WELLS FARGO - COLLISTER BRANCH - EXTERIOR REMODEL) (DRH08-00289) Additional structural calculations required in the field to verify the capacity of strap connections. Provide calculations to the Structural Inspector. This building is NOT fire sprinklered. To remodel the exterior of an existing bank building. The floor area will be expanded from about 3,683 square feet (3,263 square feet inside and 420 square feet under the drive-thru roof) to about 4,209 square feet (3,683 square feet existing building and 526 square feet roof addition over a sidewalk). The existing drive-thru roof will be demolished and a new roof constructed, an existing chain link mechanical enclosure at grade will be demolished and a new masonry mechanical enclosure will be constructed, a new roof will be constructed on the Northwest side of the building over a sidewalk, and 2 new rooftop structures will be constructed on top of the existing roof. Work is to include concrete footings, concrete piers, steel columns, wood beams, wood trusses, shear walls, masonry veneer, 3 coat cement stucco system, standing seam metal roofing, and single ply membrane roofing. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/14/2014 DONE
First Notice9/10/20109/10/20109/27/2010 DONE
DetailsTony Young
BLD-Aging Inspection9/10/20109/10/20109/10/2010 DONE
DetailsTony Young
DOC - Permit Finaled9/10/20109/10/20109/10/2010PPASS
DetailsTony Young
BLD-Aging Inspection7/5/20107/5/20107/6/2010 DONE
DetailsTony Young
BLD-Aging Inspection5/3/20105/3/20105/4/2010 PASS
DetailsTony Young
BLD-Final10/8/200910/12/200910/12/2009APASS
DetailsTony Young
John Schafer Phone #: ###-####
Zoning Approval6/23/20096/23/20096/23/2009 PASS
DetailsAndrea Tuning
FIRE-Final Inspection6/18/20096/19/20096/19/2009APASS
DetailsForrest France
Life safety inspection completed acceptable, no inspection record on site for signature.
BLD-Final6/18/20096/18/20096/18/2009PPART
DetailsTony Young
John please call 1/2 hr before going out Phone #: ###-####. conference on final only, needs zoning final, and f/l/s/ final.
BLD-Framing/Rough-in12/19/200812/19/200812/19/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/19/2008 at 11:01:08 AM. Contact: ###-####.
exterior walls on south and s/east,, fireblock in progress
BLD-Framing/Rough-in12/11/200812/12/200812/12/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/11/2008 at 12:18:21 PM.
drive through frame roof area and section over existing roof ok
BLD-Footing12/5/200812/5/200812/5/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2008 at 6:50:18 AM. Contact: ###-####.west peirs and south bump out.
BLD-Footing12/2/200812/2/200812/2/2008PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/2/2008 at 6:21:34 AM. Contact: ###-####.
roof cover footings on west ok
BLD-Footing11/26/200812/1/200812/1/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/26/2008 at 12:27:25 PM. Contact: ###-####.
ftgs for new drive through canopy ok
Issue PAID IN FULL permit  11/24/2008 DONE
OVERRIDE  11/21/2008  
Routing Off Site - STRUCTURAL11/19/2008 11/21/2008 PASS
DetailsBarbara Stitt
Called Action Courier for pick up///11-19-08 @ 2:30pm BAS

(11-21-08) Got response from the Consultant Structural Engineer that drawings are approved. CJW
PLANS/APPL TAKEN TO FRONT DESK  11/21/2008 DONE
Inspection Record Card- Bld  11/21/2008 DONE
Telephone call  11/21/2008 DONE
Details
left vm for john shaffer at ###-#### - permit ready and fees given
Telephone call  11/21/2008 DONE
Details
left vm for laurie durocher at ###-#### - permit ready and fees given
Permit Ready to Issue  11/21/2008 DONE
Details
Plan assigned to (CJW)9/12/2008 11/21/2008 PASS
DetailsCarl Westfall
11/21/2008 16:04:33 CJW - activity updated through activity BLDA022 from case BLD08-01953.
Routing - PLAN CHECK10/21/2008 11/21/2008 PASS
DetailsCarl Westfall
(11-14-08) Multiple phone calls and E-mails on this project trying to resolve structural concerns (Architect, project Structural Engineer, consultant Structural Engineer, Contractor, Wells Fargo Project Manager). (11-21-08) Drawings cleared for issuance. Further structural calculations required in the field.
Plan resubmittals received  11/19/2008  
DetailsCarl Westfall
Rec'd one transmittal letter, three copies of structural calcs, and three copies of A2-02 & A3-03; taken to Carl W
Plan resubmittals received  10/29/2008  
DetailsCarl Westfall
Rec'd transmittal letter, and one copy of restriction agreement; taken to Carl Westfall
Plan resubmittals received  10/27/2008  
DetailsCarl Westfall
Rec'd transmittal letter and one copy of structural calcs and sheets A0-02, A2-01, A2-02, A3-02, A3-03, A4-00; taken to Carl Westfall
Plan resubmittals received  10/24/2008  
DetailsCarl Westfall
Received transmittal, response letter from arch., response from engineer, Restriction Agreement, and two copies of structural calcs and sheets A0-02, A2-01, A2-02, A3-02, A3-03, A4-00; taken to Carl Westfall
Routing - FIRE10/17/200810/17/200810/21/2008 PASS
DetailsScott Arellano
See attached Ifc fire review comments.
1st review completed  10/21/2008 FAIL
Plan check
Route to Impact Fee Review10/17/200810/22/200810/20/2008 PASS
DetailsCindy M. Gould
Exterior changes no impact fees
Routing - PLAN CHECK9/15/2008 10/17/2008 FAIL
DetailsCarl Westfall
(9-29-08) Started the IBC plan review. Structural changes significant enough to merit review by a Structural Consultant. Addition drawings submitted on Oct. 1, 2008. Drawings sent to a consultant on Oct. 2, 2008. Review on hold until consultant is finished. On Sept 30, 2008, advised the architect's rep. about property line issues so he could get started on a resolution. (10-17-08) Comments from the consultant structrual engineer were received on October 14. 2008. Incorporated comments in the IBC Plan Review Report. Revised drawings were required. See the plan review report.
Telephone call  10/10/2008 DONE
Talked to Jared Walgren. Discussed proposed "non-build agreement". Told him that it needed to be a "non-build easement" just like other easements proposed for similiar purposes. Recommended that the contact Dave Abo and ask for his help since he knows what has been required in the past. Also asked that the "non-build easement" be increased to 20 feet.
Telephone call  10/7/2008 DONE
Talked to the consultant engineer. Discussed some structural concerns.
Routing - Erosion and Sediment9/12/2008 9/15/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00770
Routing - Design Review9/15/2008 9/15/2008 PASS
DetailsAndrea Tuning
Andrea Tuning
Pending Assignment by JCB9/9/2008 9/12/2008 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  9/10/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  9/10/2008 DONE
DetailsAlexandra L. DeYoung
Application received 9/9/2008   
DetailsTisha Gallop
Routing Off Site - STRUCTURAL10/27/2008   FAIL
DetailsBarbara Stitt
Called Action Courier for pick up 10-27-08 @ 1:30pm BAS

Failed first review.