Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-01970
StatusFinaled
Name BOISE PROFESSIONAL MAINTANCE MGMT
Site Address 875 W MCGREGOR CT Unit: 160
Project NameM2E POWER INC
Customer Number 
ePlanReviewNo
Description
(M2E POWER INC)(FEDERAL WAY COMMERCE - STE 150) To expand into an adjacent office tenant space of 2,054 s.f. (1,106 s.f. 1st floor / 948 s.f. 2nd floor) an existing 2-story office / storage tenant space of 9,926 sq.ft. ( 6,855 s.f 1st floor / 2,571 s.f. 2nd floor) per approved plans. The combination of these two spaces will create an 11,480 sq. ft. tenant space. Original tenant space constructed under BLD99-03562, EMI Co. Work to include: construction of interior non-bearing wall to create a hallway from existing tenant space to expanded tenant space, create an opening in an existing wall to allow access from existing space to new expansion, installation of new accessible transfer shower, installation of sheetrock to create full separation from warehouse space, and installation of interior finishes per ch. 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20093/16/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 11/19/20081/2/2009 DONE
FIRE-Final Inspection11/19/200811/19/200811/19/2008APASS
DetailsForrest France
Fire life safety finaled, see activity completed 11/13.
Permanent Occupancy UNPAID FEE  11/19/2008  
BLD-Final11/13/200811/14/200811/14/2008APASS
DetailsJim Storey
don Phone #: ###-####
FIRE-Final Inspection11/12/200811/13/200811/13/2008APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
FIRE-Alarm Testing11/12/200811/13/200811/13/2008ADONE
DetailsForrest France
don Phone #: ###-####
BLD-Final11/12/200811/12/200811/12/2008PNR
DetailsTom Arcoraci
Don Phone #: ###-####
FIRE-Conference10/22/200810/22/200810/23/2008PDONE
DetailsForrest France
Regarding sheetrock at full height wall for fire sprinkler separation at the 2nd floor.
BLD-Framing/Rough-in10/20/200810/20/200810/20/2008PPASS
DetailsJim Storey
don Phone #: ###-####
Print Occupancy Form  10/7/2008 DONE
Details
Telephone call  10/7/2008 DONE
Details
t/c w walt at ###-#### - permit ready and fees given
Permit Ready to Issue  10/7/2008 DONE
Details
Issue PAID IN FULL permit  10/7/2008 DONE
DetailsTisha Gallop
Plan assigned to (TLW)9/17/2008 10/6/2008 PASS
DetailsTim L. Woodard
10/6/2008 15:52:57 TLW - activity updated through activity BLDA022 from case BLD08-01970.
1st review completed  10/6/2008 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  10/6/2008 DONE
Case Summary (BLD)  10/6/2008 DONE
Routing - FIRE  10/6/2008 PASS
DetailsTim L. Woodard
Field Verify
Routing - PLAN CHECK9/16/2008 10/6/2008 PASS
DetailsTim L. Woodard
Plan assigned to (DRS)9/15/2008 9/17/2008 DONE
DetailsDan Stuart
Plans reassigned to Tim Woodard.
Routing - PUBLIC WORKS9/15/2008 9/16/2008 PASS
DetailsBeverly Hall
Pending Assignment by JCB9/11/2008 9/15/2008 DONE
DetailsJason Blais
Routing PW Sewer Rating9/15/2008 9/15/2008 PASS
DetailsLouise Waldorf
Recd Pcfee & Taken To Pln CK  9/11/2008  
DetailsMarsha Smylie
Application received 9/11/2008   
DetailsMarsha Smylie