Permit Information
Permit NumberBLD08-01979
StatusFinaled
Name AEI
Site Address 851 W FRONT ST Unit: 904
Project NameTHE ASPEN - UNIT 904
Customer Number 
ePlanReviewNo
Description
(THE ASPEN - RESIDENTIAL UNIT 904) Fire sprinklers required because this building is a high-rise. To create a 1,037 square foot dwelling unit on the 9th story of a new high-rise building. The 1-hr corridor on this story will be constructed in conjunction with this permit. Work is to include 1-hr fire-resistance-rated tenant demising walls, 1-hr fire-resistance-rated corridor, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. This dwelling unit is required to comply with ICC/ANSI A117.1-2003 Section 1004 as a Type B dwelling unit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/23/2011 DONE
First Notice 8/13/20098/13/2009 DONE
Permanent Occupancy  8/13/2009 DONE
Temporary Occupancy UNPAID FEE  5/4/2009 DONE
DetailsTisha Gallop
Final occupancy pending Certificate of Completion for shell permit Bld06-02303.
BLD-Final4/30/20095/1/20095/1/2009PPASS
DetailsDave Hannah
Jim Phone #: ###-####ok after fire finals
FIRE-Final Inspection4/30/20095/1/20095/1/2009APASS
DetailsForrest France
Project related fire sprinkler permit has been issued and finaled, fire life safety inspection completed satisfactory.
BLD-Final4/29/20094/30/20095/1/2009PPART
DetailsDave Hannah
Brad Phone #: ###-#### ok after fire finals
FIRE-Final Inspection4/29/20094/30/20094/30/2009ANR
DetailsForrest France
Brad life safety Phone #: ###-####
Issue PAID IN FULL permit  12/17/2008 DONE
Telephone call  11/5/2008 DONE
Details
t/c w john price - permit ready and fees due
Permit Ready to Issue  11/5/2008 DONE
Details
Print Occupancy Form  11/4/2008 DONE
DetailsCathy Brown
Routing - PLAN CHECK10/30/2008 11/3/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/3/2008 DONE
DetailsCarl Westfall
Plan assigned to (CJW)9/22/2008 11/3/2008 PASS
DetailsCarl Westfall
11/3/2008 14:08:09 CJW - activity updated through activity BLDA022 from case BLD08-01979.
Route to Impact Fee Review10/24/200810/29/200810/31/2008 PASS
DetailsCindy M. Gould
Impact fees paid on BLD06-02303
Routing - FIRE10/27/200810/27/200810/30/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  10/30/2008 PASS
Routing - PLAN CHECK9/24/2008 10/27/2008 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
Plan resubmittals received  10/6/2008  
DetailsCarl Westfall
Rec'd 1 project letter, and 3 copies of pages- A0.0TI-4, A0.1TI-4, A0.2TI-4, A0.4TI-4, A2.9BTIR1, A3.9.1BR3, A3.9.2BR3, A6.13, A6.14, A7.9B, A9.0.4, A10.0R8, A10.1R6, A11.0, A11.1, A11.2, M1.9TI, M2.0TI-4, M3.0TI-4, MC1.1TI-4, MC1.2TI-4, P1.9TI, P3.0TI-4, 94.0TI-4; and taken to Carl Westfall
Routing PW Sewer Rating9/24/2008 9/24/2008 PASS
DetailsLouise Waldorf
Routing - PUBLIC WORKS9/22/2008 9/24/2008 PASS
DetailsBeverly Hall
Pending Assignment by JCB9/15/2008 9/22/2008 DONE
DetailsJason Blais
Application received 9/15/20089/15/2008 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  9/15/2008 DONE
DetailsAlexandra L. DeYoung
Recd Pcfee & Taken To Pln CK  9/15/2008 DONE
DetailsAlexandra L. DeYoung