Permit NumberBLD08-01993
StatusFinaled
Name MBA GENERAL CONTRACTING LLC
Site Address 6411 S BUSINESS WAY
Project NamePREMIER STORAGE CONDOS
Customer Number 
ePlanReviewNo
Description
Premier Storage Condos - Building B - To construct a new 9,855 sq. ft. one story, pre-engineered steel storage building and related site improvements. This building contains 10 condominium storage units and an office, laundry and restrooms. All construction per the approved plans and attached comment list. DRH08-00162 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/22/20097/28/2009 DONE
First Notice 6/29/20097/22/2009 DONE
Zoning Approval6/29/20096/29/20096/29/2009 PASS
DetailsJosh Wilson
Landscape plan modification completed as DRH09-00156.
Print Occupancy Form  6/29/2009 DONE
Permanent Occupancy  6/29/2009 DONE
DetailsBarbara Stitt
BLD-Final6/12/20096/12/20096/12/2009APASS
DetailsJim Storey
final ok card on site.
PubWorks Occupancy Approval6/11/20096/11/20096/11/2009 PASS
DetailsBrian Murphy
BLD-Final6/5/20096/8/20096/10/2009PPART
DetailsJim Storey
zack Phone #: ###-#### temp ok pw isues being resolved.
FIRE-Final Inspection6/5/20096/8/20096/8/2009APASS
DetailsForrest France
Correction notice items verified for completion, fire life safety is acceptable. Security gate width at the fire apparatus access road approved per M. Senteno (IFC 2006 503.2.1, 503.6). FD access for project phase one also okayed per M. Senteno and S. Arellano.
Zoning Approval6/8/20096/8/20096/8/2009 FAIL
DetailsMatthew A Halitsky
DR mod required for landscaping changes per Sarah Schafer.

Notified builder 6/8/2009.
FIRE-Final Inspection5/14/20095/14/20095/14/2009PFAIL
DetailsForrest France
Missing fire extinguishers, need to post building address, door hardware at two locations in the clubhouse is not approved, fire dept. access is not complete, see stamped plan and fire code review notes for detailed requirements.
BLD-Conference4/21/20094/21/20094/21/2009PPART
DetailsJim Storey
1003.5 Elevation change.
Where changes in elevation of less than 12 inches (305 mm) exist in the means of egress, sloped surfaces shall be used. Where the slope is greater than one unit vertical in 20 units horizontal (5-percent slope), ramps complying with Section 1010 shall be used. Where the difference in elevation is 6 inches (152 mm) or less, the ramp shall be equipped with either handrails or floor finish materials that contrast with adjacent floor finish materials.
Exceptions:
1. A single step with a maximum riser height of 7 inches (178 mm) is permitted for buildings with occupancies in Groups F, H, R-2 and R-3 and Groups S and U at exterior doors not required to be accessible by Chapter 11.
BLD-Framing/Rough-in4/6/20094/6/20094/6/2009PPASS
DetailsJim Storey
zack - bld C Phone #: ###-####
BLD-Framing/Rough-in2/12/20092/13/20092/13/2009APASS
DetailsJim Storey
zack Phone #: ###-####
BLD-Conference1/30/20091/30/20091/30/2009APASS
DetailsJim Storey
BLD-Foundation11/24/200811/24/200811/24/2008PPASS
DetailsJim Storey
Dane Phone #: ###-#### WALL ON BLD. B
BLD-Footing11/21/200811/21/200811/21/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2008 at 6:58:20 AM. Contact: ###-####. si in place compacktion aproved by si/ building b ft ok
Issue PAID IN FULL permit  11/20/2008 DONE
Routing - PLAN CHECK11/18/2008 11/19/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  11/19/2008 PASS
DetailsJohn Menard
Reviewed and approved remaining revisions with added red lined notes and attached clarification list. JCM
PLANS/APPL TAKEN TO FRONT DESK  11/19/2008 DONE
DetailsJohn Menard
Print Occupancy Form  11/19/2008 DONE
Telephone call  11/19/2008 DONE
Details
t/c w zac fillmore at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  11/19/2008 DONE
Details
Plan assigned to (JCM)9/16/2008 11/19/2008 PASS
DetailsJohn Menard
11/19/2008 11:44:31 JCM - activity updated through activity BLDA022 from case BLD08-01993.
Routing - PLAN CHECK11/5/2008 11/18/2008  
DetailsJohn Menard
Meeting  11/18/2008 DONE
DetailsJohn Menard
Met with architect and contractor to review proposed revisions. JCM
Routing - PLUMBING11/18/2008 11/18/2008 PASS
DetailsBill VanDegrift
Per plans and 2003 upc
Telephone call  11/17/2008 DONE
DetailsJohn Menard
Discussed required revisions with the architect. JCM
Plan Reviewer's activity  11/14/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Plan resubmittals received  11/6/2008  
DetailsJohn Menard
Rec'd two respose letters, two plan review report (with resposes on it), two strucrual calcs, and two copies of sheets, A3B, S-1, S-2, S-3, S-7, S-8, S-10, S-11, S-12, S-13, SD-2, FD-1; inserted by architects; take back to John M
Routing - FIRE10/31/200810/31/200811/5/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  11/5/2008 FAIL
Failed PW, ESC, Structural, Plumbing.
Route to Impact Fee Review10/31/200811/5/200811/4/2008 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS10/24/2008 10/31/2008 PASS
DetailsJohn Menard
Routing - PLAN CHECK10/31/2008 10/31/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  10/31/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing PW Street Lights  10/30/2008 PASS
DetailsHank Alarcon
Routing - PLAN CHECK10/13/2008 10/24/2008  
DetailsJohn Menard
Plan resubmittals received  10/20/2008  
DetailsJohn Menard
Rec'd one transmittal letter and 3 copies of pages- street lighting plan and plumbing plan; inserted by us and taken to John M
Plan resubmittals received  10/20/2008  
DetailsJohn Menard
Received two copies of O&M Manual, two copies of Drainage Calcs, and four copies of sheets 9 of 11, 4 of 11, 8 of 11; inserted by engineer and taken back to John Menard
Plan resubmittals received  10/17/2008  
DetailsJohn Menard
Received three copies of grading response, structural response letter, and pages S-0, FD-1, four copies of Structural calcs; inserted by arch. rep. and taken back to John Menard
Routing - PUBLIC WORKS10/10/2008 10/13/2008 FAIL
DetailsLouise Waldorf
Routing PW Street Lights10/10/2008 10/13/2008 FAIL
DetailsHank Alarcon
Routing - PLAN CHECK10/8/2008 10/10/2008  
DetailsJohn Menard
John Menard
Routing - PLANNING9/29/2008 10/8/2008 PASS
DetailsMatthew A Halitsky
Drh08-00162 Matt Halitsky

Routed to Plan Check.
Plan resubmittals requested  10/8/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revsions. JCM
Routing Off Site - STRUCTURAL9/16/2008 9/30/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLUMBING9/24/2008 9/29/2008 FAIL
DetailsBill VanDegrift
see bld08-01992 for comments
Routing - Erosion and Sediment9/23/2008 9/24/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00789
Routing - PUBLIC WORKS9/17/2008 9/23/2008 FAIL
DetailsLouise Waldorf
Routing PW Sewer Rating  9/23/2008 PASS
DetailsLouise Waldorf
Routing PW Sewer Design9/18/2008 9/23/2008 PASS
DetailsJon R. Gunnerson
SEWER TAP PERMIT REQUIRED, Connect to existing 2-inch force main.
Routing PW Solid Waste  9/23/2008 PASS
DetailsPeter J. McCullough
Routing PW Drainage9/17/2008 9/18/2008 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div9/16/2008 9/17/2008 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  9/16/2008 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  9/16/2008 DONE
DetailsTisha Gallop
Telephone call  9/16/2008 DONE
DetailsTisha Gallop
Called Action Couriers for pick up
Plan routing begun/NEW & ADDTN  9/16/2008 DONE
DetailsTisha Gallop
Pending Assignment by JCM9/16/2008 9/16/2008 BLDA
DetailsJohn Menard
9/16/2008 14:22:21 JCM - activity updated through activity BLDA166 from case BLD08-01993.
Application received 9/15/2008   
DetailsTisha Gallop