Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/15/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/10/2008 | 1/2/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/10/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 10/29/2008 | 10/30/2008 | 10/30/2008 | A | PASS |
Mike Jordan
|
|
|
keith Phone #: ###-####. oK for perm occ.
|
FIRE-Final Inspection | 10/28/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Forrest France
|
|
|
C/N items verified for compliance, fire life safety inspection passed.
|
FIRE-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved single action hardware on one of the main exit doors, provide doors and hardware on the new office and repair the exit sign. Provide verificaiton that the fire sprinkler system has had its annual inspection.
|
BLD-Other | 10/22/2008 | 10/23/2008 | 10/23/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 9:18:58 PM. Contact: ###-####. grid ok pend. elec. and mech insp.
|
BLD-Framing/Rough-in | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PASS |
Mike Jordan
|
|
|
Keith Phone #: ###-####
|
Telephone call | | | 10/9/2008 | | DONE |
|
|
|
t/c w steve moore at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/9/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/9/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 10/9/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/9/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 10/2/2008 | 10/2/2008 | 10/8/2008 | | PASS |
Ron Hill
|
|
|
10/8/2008 08:17:18 RMH - activity updated through activity BLDA022 from case BLD08-02041.
|
Routing - PLAN CHECK | 10/7/2008 | | 10/8/2008 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2008 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/8/2008 | | 10/8/2008 | | PASS |
Steven Webb
|
|
|
Steve, this is the one I had requested a verbal or e-mail from you if this plan nees a esc permit application as they submitted a waiver request with the plans I have tried to get in touch with Wes Steele to let him know that an application was needed. My call was never returned so I sent the plans on to Ron H. I thought they would be routed to you, Ron called this Steven Moore and said he had talked with you an dyou stated no permit was needed for what they had planed to do. The plans have now been routed to the fee status and Cathy Mae noticed my comments in the comments section and brought the plans to me. at this point I have routed them to you and you can say if they pass or not. 10-8-08 PER STW minor work being done No ESC needed///dld
|
CHANGE STATUS TO (REV) | | | 10/8/2008 | | |
|
|
|
this plan needs to be reviewed by Steve Webb.
|
Inspection Record Card- Bld | | | 10/8/2008 | | DONE |
|
|
|
|
1st review completed | | | 10/7/2008 | | PASS |
|
|
|
|
Routing - FIRE | 10/6/2008 | | 10/7/2008 | | PASS |
Scott Arellano
|
|
|
Plans approved with red line annotations. Attached IFC comments to plans.
|
Case Summary (BLD) | | | 10/6/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/3/2008 | | 10/6/2008 | | PASS |
Ron Hill
|
|
|
|
Routing - PUBLIC WORKS | 10/2/2008 | | 10/3/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 10/2/2008 | | 10/2/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2008 | | DONE |
|
|
|
called left message for Wess Steele on 9-22-08 to call me so I could inform him that he needs an ESC Application turned in before I can process the plans. 10-2-08 Have not received a call back form Wes Steele so I have sent the plans on.///dld
|
Application received | | 9/22/2008 | | | |
|
|
|
|