Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-02057
StatusFinaled
Name CM COMPANY
Site Address 6707 W OVERLAND RD
Project NameIdaho Central Credit Union
Customer Number 
ePlanReviewNo
Description
Idaho Central Credit Union - Overland Branch - To construct a new 7,490 square foot, one story, wood framed credit union office building with drive-thru canopy and related site improvements. Office 5,640 sq. ft., Canopy 1,840 sq. ft. - DRH08-00200, CUP08-00072 - This project will be finished in phases. First phase is to finish and occupy the new building. The second phase is to demo the existing credit union building and expand the parking lot at the old building location. The new building will be on a temporary C.O. until the new parking lot and site work are completed. All construction per the approved plan and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/9/2016 DONE
Third Notice 10/31/200911/5/2009 DONE
DetailsBarbara Stitt
Second Notice 9/28/200910/21/2009 DONE
First Notice 8/11/20099/18/2009 DONE
BLD-Final8/10/20098/11/20098/11/2009APASS
DetailsJim Storey
tom - please call 1/2 hr prior Phone #: ###-#### final ok
Permanent Occupancy  8/11/2009 DONE
FIRE-Final Inspection8/4/20098/5/20098/5/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection7/31/20097/31/20097/31/2009PFAIL
DetailsTroy Cobbley
The new fire dept access to the existing apartments on the south side of the credit union does not have the required 20'-0" minimum width. The city approved plans show a width of 20'-1" to be maintained.
Zoning Approval7/30/20097/30/20097/30/2009 DONE
DetailsMatthew A Halitsky
Temporary Occupancy6/10/20099/8/20096/10/2009 DONE
DetailsAlexandra L. DeYoung
Zoning Approval Temp6/4/20096/4/20096/9/2009 DONE
DetailsMatthew A Halitsky
A bond in the amount of $68,586 is due for remaining site and landscaping work.
BLD-Final6/8/20096/8/20096/8/2009PPART
DetailsTom Arcoraci
tom Phone #: ###-#### ok for temp
PubWorks Occupancy Approval6/8/20096/8/20096/8/2009 DONE
DetailsTiffany Lowery
FIRE-Final Inspection6/4/20096/5/20096/5/2009APART
DetailsTroy Cobbley
A temporary occupancy was given per the scope of work and mark sentenno until the existing building is demo'd and the fire lane installed.
FIRE-Conference5/28/20095/29/20095/29/2009ADONE
DetailsTroy Cobbley
I deferred Tom to Mark Senteno for the temp until the fire lane is complete.
BLD-Framing/Rough-in4/23/20094/24/20094/24/2009PPASS
DetailsTom Arcoraci
tom - ceiling grid wires Phone #: ###-####
BLD-Other4/17/20094/17/20094/17/2009PPASS
DetailsTom Arcoraci
Tom- ceiling Phone #: ###-####
BLD-Framing/Rough-in3/5/20093/6/20093/6/2009APASS
DetailsTom Arcoraci
Tom Phone #: ###-####
BLD-Other3/4/20093/4/20093/4/2009PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in3/3/20093/4/20093/4/2009APASS
DetailsTom Arcoraci
tom Phone #: ###-####
BLD-Other2/25/20092/26/20092/26/2009APASS
DetailsTom Arcoraci
Tom- nail Phone #: ###-####
BLD-Other2/19/20092/19/20092/19/2009PPASS
DetailsTom Arcoraci
BLD-Other2/18/20092/19/20092/19/2009APASS
DetailsTom Arcoraci
Tom- roof nailing Phone #: ###-#### wip ok
BLD-Other2/17/20092/17/20092/17/2009PPASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in2/12/20092/13/20092/13/2009PPART
DetailsTom Arcoraci
tom - roof framing Phone #: ###-#### ok to cover roof
BLD-Other1/13/20091/13/20091/13/2009PPASS
DetailsTom Arcoraci
tom Note: slab Phone #: ###-####
BLD-Other12/15/200812/16/200812/16/2008APASS
DetailsTom Arcoraci
tom Note: stem wall Phone #: ###-####
BLD-Footing12/8/200812/9/200812/9/2008PPASS
DetailsTom Arcoraci
tom Phone #: ###-####
Issue PAID IN FULL permit  11/21/2008 DONE
Telephone call  11/14/2008 DONE
DetailsBarbara Stitt
Left a voice message for Erin with CM company that permit is ready & fees due, and that RP and ACHD information is required///11-14-08 @ 9:45am BAS
Permit Ready to Issue  11/14/2008 DONE
DetailsBarbara Stitt
Plan assigned to (JCM)9/23/2008 11/13/2008 PASS
DetailsJohn Menard
11/13/2008 10:33:53 JCM - activity updated through activity BLDA022 from case BLD08-02057.
Plan resubmittals received  11/13/2008 DONE
Received existing fire hydrant layout. Field verified by Scott Arellano.
Routing - FIRE  11/13/2008 PASS
Attached updated plan review comments to plan sets.
Routing - PLAN CHECK11/13/2008 11/13/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  11/13/2008 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural plan revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  11/13/2008 DONE
DetailsJohn Menard
Print Occupancy Form  11/13/2008 DONE
Details
(F) Reprint permit  11/13/2008 DONE
Routing - FIRE11/6/200811/6/200811/12/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  11/12/2008 FAIL
Failed PW, Structural, Plumbing, Planning, Plan Check, Fire
Route to Impact Fee Review11/6/200811/12/200811/7/2008 PASS
DetailsCindy M. Gould
Plan resubmittals received  11/7/2008  
DetailsJohn Menard
Rec'd one plan review report (with responses in red), and two copies of sheets A1.2A2.1, A3.0, A5.3, A6.0, A6.2, A7.2, and A8.0; taken back to Fire
Plan resubmittals requested  11/6/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK10/22/2008 11/6/2008 FAIL
DetailsJohn Menard
Plan Reviewer's activity  11/6/2008 FAIL
DetailsJohn Menard
Reviewed nonstructural items and structural revisions and required additional revisions for both. JCM
Routing - PUBLIC WORKS10/20/2008 10/22/2008 PASS
DetailsBeverly Hall
Routing PW Drainage10/21/2008 10/21/2008 PASS
DetailsBrian Murphy
Routing PW Solid Waste10/21/2008 10/21/2008 PASS
DetailsPeter J. McCullough
Routing - PLAN CHECK10/13/2008 10/20/2008  
DetailsJohn Menard
Plan resubmittals received  10/20/2008 DONE
received a transmittal sheet from lca architects & "3" sets of calcs (10) sheets each---also "2" sheets of S2.1--plans taken to John Menard
Routing - PLUMBING10/9/2008 10/13/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals requested  10/9/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL9/23/2008 10/9/2008 FAIL
DetailsJohn Menard
called action couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK10/8/2008 10/9/2008  
DetailsJohn Menard
Plan resubmittals received  10/9/2008  
DetailsJohn Menard
Rec'd transmittal letter and 2 copies of pages A2.1, M1.0, and M1.1; inserted by arch rep and taken to John M.
Routing - PLANNING10/7/2008 10/8/2008 PASS
DetailsSue Cummings
Sue C.
Routing - PLANNING10/1/2008 10/7/2008 PASS
DetailsMatthew A Halitsky
drh08-00200 Matt H

cup08-00072 Sue C.
Routing - PLUMBING9/30/2008 10/1/2008 FAIL
DetailsBill VanDegrift
key note B page M1.1 direct connection between T&P drain and P-4 P-trap prohibited, provide airgap. thermol expantion protection required. provide required drinking fountain. key note E page M1.1 hose bib vacumm breaker required on hose threads. Discharge of the roof drainage at building will create a nuisance, provide another location.
Plan resubmittals received  10/1/2008  
DetailsBarbara Stitt
Received cover transmittal and 5 copies of sheet C1.2-inserted into Issue & Office copy of 3 extras are rolled up in plans and taken back to plumbing inbox///10-01-08 @ 11:00am BAS
Plan resubmittals received  10/1/2008  
Cover transmittal and 2 copies of sheets A1.1, A1.2 and inserted into plans then returned to Matt H desk 10-2-08 @ 9:15am BAS
Routing - Erosion and Sediment9/29/2008 9/30/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00821
Routing - PUBLIC WORKS9/25/2008 9/29/2008 FAIL
DetailsLouise Waldorf
Routing PW Sewer Rating9/25/2008 9/29/2008 PASS
DetailsLouise Waldorf
Routing PW Street Lights9/29/2008 9/29/2008 PASS
DetailsHank Alarcon
Routing PW Solid Waste  9/29/2008 FAIL
DetailsPeter J. McCullough
Trash enclosure does not meet size requirements.

Contact Peter McCullough: ###-####
Routing - PLANNING Land Div9/23/2008 9/25/2008 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  9/23/2008 DONE
DetailsDarla L Downs
Plan routing begun/NEW & ADDTN  9/23/2008  
Pending Assignment by JCM9/23/2008 9/23/2008 BLDA
DetailsJohn Menard
9/23/2008 15:42:05 JCM - activity updated through activity BLDA166 from case BLD08-02057.
Application received 9/23/2008   
Routing PW Drainage9/25/2008   FAIL
DetailsBrian Murphy
NEED NEW SWALE DETAIL. BRIAN MURPHY ###-####