BLD-Aging Inspection | 11/29/2010 | 11/29/2010 | 12/3/2010 | | PART |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
DOC - Permit Expired | 12/2/2010 | 12/3/2010 | 12/3/2010 | P | PASS |
Jim Storey
|
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD-Aging Inspection | 9/29/2010 | 9/29/2010 | 9/29/2010 | | PASS |
Jim Storey
|
|
|
exp. 11/25 from last conf.
|
BLD-Aging Inspection | 7/28/2010 | 7/28/2010 | 7/28/2010 | | PASS |
Jim Storey
|
|
|
exp. 11/25 from last conf.
|
BLD-Aging Inspection | 5/25/2010 | 5/25/2010 | 5/25/2010 | | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 5/25/2010 | 5/25/2010 | 5/25/2010 | P | PASS |
Jim Storey
|
|
|
work in progress
|
BLD-Aging Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | | PASS |
Jim Storey
|
|
|
pending ele final
|
BLD-Aging Inspection | 1/19/2010 | 1/19/2010 | 1/19/2010 | | NR |
Jim Storey
|
|
|
pending ele final.
|
BLD-Framing/Rough-in | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/9/2008 at 7:57:03 PM. Contact: ###-####.
|
BLD-Energy code compliance | 10/10/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/9/2008 at 7:57:03 PM. Contact: ###-####.
|
BLD-Footing | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 10:53:47 AM. Contact: ###-####.
|
Routing Walk-In (Zoning) | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | DONE |
Perry Paine
|
|
|
9/23/2008 13:48:35 PEP - activity updated through activity BLDA022 from case BLD08-02058.
|
Case Summary (BLD) | | | 9/23/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/23/2008 | | DONE |
|
|
|
|
Application received | | 9/23/2008 | | | |
|
|
|
|